Haitham Momtaz-PMP, Solar Project Manager

Haitham Momtaz-PMP

Solar Project Manager

Sterling & wilson

Location
Egypt - Cairo
Education
Bachelor's degree, ELECTRIC POWER ENGINEER
Experience
29 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 6 Months

Solar Project Manager at Sterling & wilson
  • Egypt
  • My current job since April 2018

PV Solar Project Manager

Project Manager at El sewedy Electric -PSP
  • Egypt
  • October 2016 to October 2017

project manager for turnkey E.H.V Substation projects

PROJECTS MANAGER at AUVA
  • Saudi Arabia - Riyadh
  • July 2015 to May 2016

TURN KEY PROJECT FOR S/S 8231. 8281, & 8138
As per N.G -s.a standards and specifications

Project Manager at mets
  • Saudi Arabia - Riyadh
  • October 2013 to February 2015

Turn key Job for 2 projects

1- conversion of masoudi-andlus-khamiditay 115K.V Overhead Transmission Lines to underground Cables
contract No 440000-4093

2 - Conversion Of Hameediah-Abu Ghanimah & HIE-Al-Aynun 115K.V Overhead Transmission lines to Under ground cables
Contract No 440000-4094

PROJECT MANAGER at AL -TOUKHI
  • Saudi Arabia - Riyadh
  • January 2011 to March 2013

Carrier: project management of Extra High Voltage sub. Station
JOBS HOLD
Altoukhi for contracting
7\2011 to now
Project Manager for tabarjal project 132\33\13.8 K.V
Brief of duties:-
1 - Study for scope of work and prepare for kick off meeting
2 - Prepare &supervise for millstone schedule, over all progress schedules
3 - Prepare the base design and starting details design after client comments
4 - Procurement of approved material to site
5 - Equipments transportation to site after factory test approvals
6 - Issuing the IFC (issued for construction) drawings &materials
7 - Supervise for site activities till completion based on IFC copies
8 - Avoid & compensate any delay for site activities or materials delivery
9 - Co-ordination with various levels client, consultant, suppliers, etc
10 - 11 Follow up the overall progress and cash flow - Clear all snacks and punch list from TCC up to FAC

Project manager at Elsewedy Electric T&D (Egypt)
  • Egypt - Cairo
  • April 2008 to January 2011

El sewedy Electric T&D (Egypt)
4\2008 to 5\2011
Project manager - Managing for project 220\66\22 K.V S\ST
Brief of duties:-
1 - Study for scope of work and prepare for kick off meeting
2 - Prepare &supervise for millstone schedule, over all progress schedule
3 - Prepare the base design and starting details design after client comments
4 - Procurement of approved material to site
5 - Equipments transportation to site after factory test approvals
6 - Issuing the IFC (issued for construction) drawings &materials
7 - Supervise for site activities till completion based on IFC copies
8 - Avoid & compensate any delay for site activities or materials delivery
9 - Co-ordination with various levels client, consultant, suppliers, etc
10 - 11 Follow up the overall progress and cash flow - Clear all snacks and punch list from TCC up to FAC

Site manager at Al fanar for construction
  • Saudi Arabia - Riyadh
  • February 2006 to January 2008

Al fanar for construction (Saudi Arabia)
2\2007 to 4\2009
- Site manager for PP- 8 380/110/13.8 k.v
- Site manager for Madina south ext.380/110/13.8k.v
( installation for 380 k.v GIS with 380 k.v circuit breaker & 110k.v GIS with 110 circuit breakers, 13.8 k.v switchgear, 60 MVA transformer, control & protection panels, measuring& metering, scada RTU system, A.C &D.C panels, battery& battery charger, aux transformers, telecommunication panels, HVAC, fire fitting, fire alarm system, ETC


Brief Duties:-
1- Design review and schedules check
2- Follow up approved overall planning schedule and delivery schedule
3- Arranging manpower& tools for equipments installation
4- Erection proceed according to specification & IEC standard
5- Managing for commissioning& testing procedure
6- Preparing (daily attendance, weekly schedule, monthly overall progress)
7- Handover the project to client from TCC to FAC
8- Achieve the project target with total cost control

electromechnical manager at intrid compay
  • Egypt - Cairo
  • February 2002 to January 2006

2\2002 to 1\ 2006
- Electromechnical dep. Manager for American education center
- Electromechnical dep. Manager for English education center

Brief duties:-
1- Follow up quotations and purchase orders
2- Submitted design drawing for approved
3- Arranging manpower and required tools
4- Factory inspection for equipments and approved for delivery notes
5- Arranging all requirement with client and end user
6- Follow up the overall progress and cash flow
Schneider electric Egypt (VATech)

Site manager at Schneider Electric
  • Egypt - Cairo
  • May 1998 to December 2001

5\1998 to 12\2001
- Site manager for Egyptian industries union
- Site engineer for Alexandria library

- Site engineer for retrofit of M.V switchgear

Brief duties:-
1- Preparing cost control sheet
2- Arranging all site materials required
3- Arranging all equipments delivery
4- Design for power factor correction system
5- Managing for all project documents
6- Handover the project until final acceptance certificate

Maintenance engineer at Cairo electric company
  • Egypt - Cairo
  • January 1993 to April 1998

Cairo electric company
2\1995 to 4\1998
- Maintenance engineer for had bet al ahram 220/66/11 k.v
- Operation engineer for al remaia 66k.v s/st

- Maintenance engineer for middle region

Brief duties:-
1- Operation& maintenance for 220K.V circuit breaker, isolating switch,
Earthing switch, transformers, D.C system, A.C system
2- Arranging the operation procedure
3- Achieve the maintenance schedule and overall maintenance
4- Preparing the maintenance sheet procedure as manufacture advice
5- Arranging with load distribution centre for network condition

Education

Bachelor's degree, ELECTRIC POWER ENGINEER
  • at FACULTY OF ENGINEERING
  • July 1993

Electric Engineer -power

Specialties & Skills

Electric Power
Project Management
COST CONTROL
DRAWING
ENGINEER
HIGH VOLTAGE
INSPECTION
MAINTENANCE
PROGRESS
RETROFIT
TESTING
power distribution
procurement
operation
ms project
project execution
maintenance engineering
project planning

Languages

English
Expert

Memberships

الهيئه السعوديه للمهندسين
  • مهندس كهرباء
  • September 2011

Training and Certifications

PMP (Certificate)
Date Attended:
May 2015
Valid Until:
January 9999
company training (Training)
Training Institute:
power transformers, networks,circuit breakers
Date Attended:
August 1995

Hobbies

  • music