Electrical Engineer
Parsons International Ltd
مجموع سنوات الخبرة :15 years, 5 أشهر
Responsible to handle inspection of (0.415/11kV) LV/MV cable laying, substation work including all equipment’s(Transformer, RMU, LV Panel, Feeder pillar, etc) installation and testing & commissioning, Road crossing ducts installation, Street lighting Poles & cables removal and installation, Traffic signaling work, MCC (Monitoring Control Centre) poles, duct installation and Telecommunication duct rerouting works
Prepare and coordinate design drawings to ensure compliance with project specification and BOQ.
•Preparation of Shop Drawing of LV Cable SLD, 11KV Distribution Network and Street lighting Layout
•Preparation of LV load Schedule, Street lighting Load Schedule and Substation Equipment Plan, Lighting & Power Drawing.
•Handle all electrical submittals including shop drawings, material Submittal and method statements.
•Monitor the site progress and lead the MEP construction team to ensure proper implementation on site in compliance with project schedule, quality standards, electrical codes and local regulations
•Following up with the Client for Approvals (materials, drawings and others).
•Supervision and Installation of 11kV Switchgear, LV Panel, DC Battery system, DMS Cubicle, FOC Panel and RTU in the Substation.
•Supervision, Installation of HV/LV cables, Control cables and termination in all HV/LV Equipment’s in Substation.
•Supervision, Installation of Street Lighting Poles and cables termination with luminaries and cutout.
•Ensure proper installations are done as per the approved design drawings and project specifications.
•Prepare and coordinate for closing SOR and NCR in process inspection
•Perform and implement value engineering proposals on the design, submitting cost Variation claims evaluation with Main Contractors and Finalization of Agreed Value Variation (AVV)
•Preparing and Submitting Monthly Invoice as per work completion.
•Coordinate with Testing Team for testing, commissioning and startup
•Preparing Project Closeout procedure, Operation and Maintenance Manual, As Built Drawings and handing over to the client
Centre and Frozen Bakery- AGTHIA Group .Abudhabi
•D-10201 Long Term Agreement for Automation of Distribution Substation in Abu Dhabi central region(ABB Make/Replacement)- ADDC
•D-8579 Long Term Agreement for Automation of Distribution Substation in Abu Dhabi central region(Lucy Make/Refurbishment & Retrofit) - ADDC
•N-11542 - Silicon Rubber Coating of Outdoor Porcelain Insulation of OHTL Circuit Ends in Al-Ain- TRANSCO
Responsibilities :
•Prepare Shut Down Schedule for the Automation Activities.
•Receive PTW( Permit to Work ) from ADDC for the Shut Down activities.
•Supervision of Shut down activities like Removal of Old Switchgear Panel and Installation of Lucy RMU, Termination of 11KV Cables and Handover to ADDC of the Automation Project.
•Preparing of Cable tray Drawings, Cable schedule and Cable termination details.
•Preparing of Method statement for Installation of RMU, MV Switchgear, DC Battery System and RTU
•Supervision and Installation of RMU, MV Switchgear Panel, DC Battery system, DMS Cubicle and RTU.
•Conduct review meetings with Supervisor regarding the daily activities.
•Preparation and Estimation of Project which includes Costing.
•Preparation of Project Schedule which involves allocation of Manpower, Machinery, Tools & Tackles etc.
•Preparation of technical submittal (Compliance statement, drawings & Component submittal) and get the same approved by Consultant & Clients.
•Report to the Project Manager regarding the day to day activities of the project.
•Conduct weekly review meetings with Supervisors regarding the progress and the status of the weekly schedule.
•Liaise with the Main Contractors, Clients regarding the Project Schedule and discussion of the bottlenecks so as to complete the project in time.
•Conduct testing of laid cables which involves Meggering & Hi-Pot Test
•Meggering-which is done to check for the Insulation Resistance (IR) of the cable.
•Hi-Pot Test-which is done for checking the Leakage current of the cable which should be a minimum value.
•Handing over of the Site to the clients after the successful commissioning of the project.
O-1191, Construction of Sewerage Schemes Al Sadr ‘A’ And Trunk Sewer of Fala And Al-Shamka.Stage-3-
Client : Eastern Petrochemical Company, Sharq (
Project : BSNL-