1- Project: lower FARS Heavy Oil Development Program Phase I
Supply and Construction of (49) Tanks in North Kuwait & South Tank Farm
“QA/QC Engineer” \[December 2015 - Till Now\]
Main Contractor: Petrofac.
Owner: Kuwait Oil Company (KOC).
Job responsibilities:
• Preparing of all documents RAMS, Procedure, ITP’s, WPS & PQR, WQT
1- Project: NORTH LPG TANK FARM PROJECT (SMP 2) AT MAA Refinery.
“QA/QC Engineer” \[September 2015 - Present\]
Main Contractor: GS Engineering & Construction.
Owner: Kuwait National Petroleum Company (KNPC).
Job responsibilities:
•Carrying out the pre commissioning work Air blowing, reinstatement for all lines.
2- Project: Replacement and renovation for water cooling system (GRE)on ship "QUEEN OF THE NETHERLANDS"
“QA/QC Engineer” \[ August 2015 - September 2015\].
Owner: Boskalis
•Followed up the activates on board fabrication, fit up, lamination, curing as per specification.
•Prepared the hydro test packages and releases the system for hydro test.
•Reinstatement and commissioning and hand over to client.
1- Project: installation of GRE fresh water line in (CFP) Clean Fuel Project at MAA & MAB refineries.
“QA/QC Engineer” \[July 2014 - Present\]
Main Contractor: SAMSUNG C&T Corporation.
PMC: Foster wheeler.
Owner: Kuwait National Petroleum Company (KNPC).
Job responsibilities:
• Following up with QC inspector site activates, fabrication, lowering of pipe, fit up, lamination, curing as per drawing and specification and surveying.
• Preparing and Maintaining for the entire QC documents and coordinate with client for inspections for every step going at site.
• Preparing the hydro test packages and releases the loops for hydro test.
• Reinstatement, disinfection and commissioning.
• Prepared final dossier for the project and hand over to client.
•Project: Construction of gas oil storage tank and auxiliary at AZ-Zour power plant.
•Company: HEISCO (Heavy Engineering Industry& Shipbuilding Company).
•Owner: MEW (Ministry Of Electric & Water)
•Job title:Project Engineer.
Perform internal and external inspections on storage tanks at scheduled intervals to maintain the mechanical integrity.
Followed up civil activities for tank foundation, Dyke wall, paving.
Perform the fabrication work and erection at site for tank and piping.
Perform the erection of cathodic protection system.
Perform firefighting & deluge system, foam monitors, fire hydrant, foam chamber, cooling system, sprinklers, fire alarm system, heat detector, flame detectors, mimic panel.
Implement of inspection and testing (Peaking, Banding, Plumpness, vacuum box, and Air test, RT, UT, MT, PT and PWHT.
Prepared of hydro test package for tank and piping system.
Perform painting and band for tank inside, outside, piping, pipe support, cross overs.
Followed up the KFD service test and commissioning for firefighting, cooling & Deluge system.
Prepare final dossier and handover to clients.
- Project: Installation of Low Sulphur fuel Oil, Fuel Gas and Gas Oil Pipelines from MAA to Subiya and Doha Power Stations.
“QC Inspector” \[January 2012 - May 2012\]
Client: Hyundai.
PMC: Flour.
Owner: KOC (Kuwait Oil Company).
Job responsibilities:
• Perform stringing for pipes, fit up and welding for free joints outside of trench.
• Implement RT for all joints and interpretation the RT films & witness for hardness test, UT, MT and PT.
• Follow up the RT repairs according to specification.
• Perform lowering for pipes.
• Perform fit up and welding for Tie-In joints in trench and Implement RT for the joints .
• Preparation and Maintaining for the entire QC documents and coordinate with client for inspections for every step going at site.
• Prepared lowering, Tie-in and hydro test package.
1- Projects: Al-Atf Thermal Power Plant (Pipe Installation & Mechanical Equipment).
“QC Engineer” \[January 2012 - May 2012\]
Client: Toshiba.
Consultant: Pgesco.
Job responsibilities:
• Perform inspection for material received piping & equipment.
• Witness for WQT for skilled welder according to ASME IX.
• Perform fit up and welding for pipe spools at work shop and erections at site as per approved drawing.
• Implement RT for joints according to ASME B31.1 and interpretation the RT films & witness for hardness test, UT, MT and PT.
• Follow up the RT repairs according to specification.
• Monitored for preheat temperature before and during welding, Argon back purging for stainless steel and alloy steel,
• Implement inspection for coating & color code for piping as per code and specification.
2- Project: Cairo West Thermal Power Plant (Pipe Installation & Mechanical Equipment).
“QC Engineer” \[September 2008 - May 2011\]
Client: Initec Energia.
Consultant: Pgesco.
Job responsibilities:
• Perform inspection for material received piping & equipment.
• Witness for WQT for skilled welder according to ASME IX.
• Perform fabrication and erections for pipe spools including critical pipe as (SA 335 Gr. P91, P22, P11) fit up, welding, direction, level, at work shop and site as per drawing.
• Implement RT for joints according to ASME B31.1 and interpretation the RT films & witness for hardness test, UT, MT, PT and PWHT).
• Follow up the RT repairs according to specification.
• Prepared for hydro test package for piping system.
• Implement inspection for coating & color code for piping as per code and specification.
“QC Inspector NDT& PWHT”
Job responsibilities:
• Implement and followed up all NDT activities for clients products as pressure vessels, pipes, Heat exchanger, Steel Structure, Tanks and plates work.
• Implement and followed up PWHT and stress relive for all products