Hossameldin Fadl,  Construction Manager Civil Engineer

Hossameldin Fadl

Construction Manager Civil Engineer

Al-Hayat Company for Engineering Works

Lieu
Egypte
Éducation
Baccalauréat, BA
Expérience
18 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 7 Mois

Construction Manager Civil Engineer à Al-Hayat Company for Engineering Works
  • Egypte - Charm el Cheikh
  • Je travaille ici depuis août 2016

Infrastructure works for compound "Hilton Vacation Club" - Sharm Elsheikh, Egypt
This project consists of all underground Infrastructure works in terms of sewage network with lift pump station, water and irrigation networks, firefighting network, network of light current and low voltage lines.
.Responsibilities: management project including review designed drawings - preparing of workshop drawings - arranging required resources for execution (man power - materials suppliers - equipments), scheduling and planning management, time management, cost management, all related processes to follow-up project, technical office support and stakeholders management with client, consultant and others.
Achievements: 1- Resolving technical problems for design to obtain more easily execution and maintenance operations. 2- Develop the method statement of works to improve the deliverables and save more time and costs. 3- Overcome about the delay of the time schedule due to the consumed time in redesigning works and approvals from consultants.

Construction Manager à Al-Majdal Corner for Contracting
  • Arabie Saoudite - Riyad
  • janvier 2014 à juin 2016

Infrastructure water networks and ground tanks of Al-Ghat City - Ghat, Riyadh, KSA
This project consisted of 22 Km internal water networks using different diameters HDPE pipes including houses connections and fire hydrants. Also, 11 Km Main transmission D.I line using diameters 400 mm and 300 mm. with using micro tunnel excavation method to cross the high way of Riyadh - Qassim.
Construction of two R.C Ground tanks with capacity 3000 m3 with lift pump station.
Responsibilities: management project including study and pricing of bids and tenders - review designed drawings - preparing of workshop drawings - arranging required resources for execution (man power - materials suppliers - equipments) - scheduling and planning management, time management, cost management, all related processes to follow-up project, technical office support and stakeholders management with client, consultant, Governmental municipalities and ministries to take permits and others stakeholders.
Achievements: 1- winning the project successfully after pricing. 2 - enhance the profit from 20 % to 28 % by hard negotiation with suppliers and subcontractors.

Construction Manager à Fahad Al-Hamady & sons CO. LTD
  • Arabie Saoudite - Riyad
  • août 2011 à décembre 2013

Infrastructure water networks for Zulfi city - Riyadh - KSA
This project consisted of 55 Km internal water networks using different diameters HDPE pipes including houses connections and fire hydrants. Also, 1.6 Km Main transmission D.I line using diameter 300 mm.
Responsibilities: management project including rearranging required resources for execution (man power - materials suppliers - equipments), rescheduling, planning management, time management, all related processes to follow-up project, technical office support and stakeholders management with client, consultant, Governmental municipalities and ministries to complete permits and others stakeholders.
Achievements: Saving project from termination due to time schedule delay, I was started work where progress was 10.3% for 50.1% elapsed time, I was reached to progress 88% for 92% elapsed time, then by negotiation with client I got extra time 6 months for extra works need not more than 2 months to be completed.

Site Engineer à Al Dewan for engineering and contracting
  • Egypte - Le Caire
  • juillet 2009 à juillet 2011

This project consisted of compound of 144 villas, it contained all related works in terms of infrastructure works (civil, Electrical and mechanical), landscape works with softscape and hardscape.
Responsibilities: Overseeing for self-implementation works and supervision subcontractor’s works for these items:-
1- Execution of 6 villas including the R.C structures and finishing works.
2 - Execution the different infrastructure works (sewage, water and irrigation networks).
3- Execution of 7 artificial lakes, main swimming pool and entrance fountain.

Site Engineer à El Shams Company for Contracting
  • Egypte - Le Caire
  • mars 2008 à juin 2009

new airport club - Cairo, Egypt
This project was to construct the R.C structures for different buildings of the club, construct internal roads around the club with hardscape works and pavement. Also, and including the networks for water, irrigation, sewage - roads and pavement - roads lightings and cables.
Responsibilities: Overseeing for self-implementation works, supervision subcontractor’s works, quantity surveying, preparing invoices works for these items:-
1- Execution roads works including pavement and hardscape works.
2- Execution the different infrastructure works (sewage, water and irrigation networks).
3- Execution the social activities building.

Site engineer à Roaia of Constructions Engineers & Contractors
  • Egypte - Le Caire
  • septembre 2005 à février 2008

Projects:
• Constructions works for store rockets, entrance building and extension of studies and experiments building - Hoof military sector - Cairo - Egypt.
• Sewage networks for Meselha City - Menoufia - Egypt..
• Sewage network for Beshla City - Mansoura - Egypt..
Responsibilities: Overseeing for self-implementation works, supervision subcontractor’s works, quantity surveying, preparing invoices works for the above projects.

Éducation

Baccalauréat, BA
  • à Faculty of Engineering, Shubra - Banha University
  • mai 2005

Qualification: Bachelors Of Civil Engineering Graduation Year: 2005 Grade: Pass. Institution: Shoubra Faculty of Engineering Banha University. Graduation Project: Sanitary Engineering. Grade of project: Excellent.

Specialties & Skills

Project Management
Supplier Negotiations
Monthly Reporting
Project Engineering
Tenders
R.C structures works for villas, water tanks and industrial buildings
Preparing the quantity surveying and invoices
Good negotiator with suppliers and subcontractors
Organize projects in order to Initiating, planning, executing, monitoring and controlling, closing
Preparing the technical reports
AutoCAD
MS Office
Swimming pools, artificial lakes and fountains civil and mechanical works
Cost estimation, study bids and tenders
Networks pipelines of water, irrigation and sewage with lift pumps stations
Internal roads including pavement, and all related hardscape works
Check and review the designed drawings, Preparing the workshop and as built drawings
Primavera
Cost estimation and study bids and tenders
Preparing of subcontractors tenders with BOQ
Preparing the quantity surveying and invoices
Good negotiator with suppliers and subcontractors

Langues

Anglais
Expert
Arabe
Langue Maternelle

Adhésions

Saudi Council of Engineers
  • Engineer
  • November 2012
Egyptian Syndicate of Engineers
  • Engineer
  • August 2005

Formation et Diplômes

Experience Certificate (Certificat)
Date de la formation:
April 2008
Experience Certificate (Certificat)
Date de la formation:
December 2013
Experience Certificate (Certificat)
Date de la formation:
June 2011
Experience Certificate (Certificat)
Date de la formation:
June 2016
Experience Certificate (Certificat)
Date de la formation:
June 2009

Loisirs

  • Reading