هيثم الفايد, Senior Cost Engineer

هيثم الفايد

Senior Cost Engineer

Parsons - Saudi Arabia

البلد
المملكة العربية السعودية - الخبر
التعليم
ماجستير, Construction Management
الخبرات
15 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 11 أشهر

Senior Cost Engineer في Parsons - Saudi Arabia
  • المملكة العربية السعودية - الخبر
  • أشغل هذه الوظيفة منذ سبتمبر 2016
Senior Qs في Khatib Alami - Holly Haram - Makkah
  • المملكة العربية السعودية - مكة المكرمة
  • يناير 2016 إلى أغسطس 2016

Four Tower (Hilton) Five star to Serve Holy Haram.
- Every Tower 42 Floor with Podium 4 level and five Levels underground parking, and two-floor
utility Area: 402, 950 M2.
- Field of work: All Construction & Architectural works.
- Sites of work: Senior Q.S for Construction & Architectural work
Duties and Responsibilities:
- Check all the Quantity in the BOQ vs. the Actual Measurement.
- Prepare technical Report & Letters to the PMO.
- Study all Claims from contract & financial side and negotiate it with the contractor.
- Dealing with Variations Order.
- Review the main contractor Invoices.
- Value Engineering
- Prepare Consultant Invoices.
- Check the Material on Site Amount & final status of it.

Senior Cost في PARSONS
  • الإمارات العربية المتحدة
  • سبتمبر 2014 إلى يناير 2014

- Approved By Ministry of Housing as SENIOR COST & CONTRACT ENGINEER
- Client: Ministry Of Housing
- Project: North Jeddah Airport project
- Area: 4 Million square meter
- Field of work: All Construction & Infrastructure works.
- Sites of work: Senior Cost Control for Infrastructure project around 2.5 million meter square in
Jeddah
* Cost of Infrastructure Phase I around 620 million SAR ( Roads, Pipeline, Irrigation,
Tanks, Street lighting, )
* Cost of Building Phase II around 1.5 billion SAR ( Villas & Housing)
Duties and Responsibilities:
- Assisting the Project Manager in preparing project forecast Cost, comparison of actual cost with
the budget, cost overruns/ savings and project organization chart on a periodic basis for submittal
to HO.
- Performing cost analysis and advising project leaders on cost over-runs promptly to ensure that
corrective actions are taken.
- Establishing procedures/ practices and exercising best practices for application of the cost control
methods and procedures and their adaptation for specific projects.
- Participating in management meetings toward conceptualizing the strategic plans to meet the long-
term goals of the organization.
- Preparing project cost estimate of resources, scheduling risks and trends and other expenses
promptly through discussions with functional leaders for cost tracking in the project life cycle.
- Designing and implementing quantity measurement systems for various processes, evaluating
performance metric results and recognizing improvements for the same.
- Coordinating and assuring cost estimation, project budgeting, and cost control during the various
project phases, providing oversight and review of project-integrated controls.
- Dealing with Variations Order.
- Review the main contractor Invoices.
- Value Engineering
- Prepare Consultant Invoices & control overall purchasing to meet our budget & make a strategy to
maximize the profit. MM Cost forecasting
- Operate and maintain project staffing plan
- Identify and report EAC & ETC (backlog)
- Operate and maintain Risk Assessment Checklist ( Risk Register )
- Maintains Contingencies
- Detect and report potential cost trends and scope changes and recommend possible alternatives
- Analyze contractor cost and time claims for extra works
- Responsible for the development and accuracy of cost dashboard

Cost Estimator في ABV Rock Group
  • المملكة العربية السعودية
  • يناير 2012 إلى سبتمبر 2012

- Field of work: All Construction & Infrastructure works in Saudi Arabia.
- Sites of work: Study Tender (Construction, Road, infrastructure) Prepare estimates Document
At The Head Office at Riyadh
 Participate in multi-billion dollar strategic Projects In Saudi Arabia
- MOI Medical City In Riyadh, Cost 3.2 Billion Dollar
- MOI Medical City In Jeddah, Cost 2.8 Billion Dollar
- MOI KAP 2C in South Border, Cost 1.5 Billion Dollar
- ABRAJ KUDAI in Makah, Cost 4, 8 Billion Dollar
- King Saud University, Cost 560 Million Dollar
- ( KAMC, KKMC ) Not Awarded
Duties and Responsibilities:
- Review all drawing with B.O.Q and specs
- Prepares work to be estimated by gathering proposals, blueprints, specifications, and related documents.
- Identifies labor, material, and time requirements by studying proposals, blueprints, specifications, and
related documents.
- Computes costs by analyzing labor, material, and time requirements.
- Resolves discrepancies by collecting and analyzing information.
- Prepares special reports by collecting, analyzing, and summarizing information and trends.
- Maintains the cost database by entering and backing up data.
- Prepare a list of the quantities of the main items representing the majority of the project value.
- Prepares and reviews capital cost estimates.
- Develops productivity analysis of construction operations and verifies results by manpower and crew
analysis of work operations by craft.
- Establishes productivity basis to be utilized in estimates.
- Preparing Inquiries Documents.
- Participates in establishing pricing structures to be applied to quantities for estimates. Ensures that
estimate is in line with market trends and pricing.
- Transfer subcontractor's rates to bill of quantities.
- Quantity Take-off for all Civil Works
- Review QS sheets for architectural and structural works.
- Prepare technical offer
- Estimate all civil and arch. Work With Excel and ( MAP ) software
- Participate in the indirect cost analysis.

Cost Estimator في Burhan Holding
  • المملكة العربية السعودية - الرياض
  • يونيو 2010 إلى ديسمبر 2011

- Field of work: All construction works in Gulf and all over the world
- Sites of work: Study Tender, Technical Office, Prepare Tender Document At The Main Office
at Nasr City - Cairo
Duties and Responsibilities:
- Estimate all civil Work By CANDY Software (CCS)
- Documents will be check Upon Receipt of the Tender Documents.
- Prepare a list of the quantities of the main items representing the majority of the project value.
- Preparing Inquiries Documents.
- Transfer subcontractor's rates to bill of quantities.
- Ensure that original tender documents are signed & stamped as necessary.
- Documents collection for Tender Submission.
- Review QS sheets for architectural and structural works.
- Prepare technical offer

Engineer في Ahli United Bank of Egypt (AUBE)
  • الإمارات العربية المتحدة
  • يونيو 2010 إلى نوفمبر 2011

22000 M2 (2 Basements, Ground, Mezzanine, 3 Repetitive floors)
- Budget : 150 Million EGP
- Location : 5th District in new Cairo
- Structural System: Post Tension, Pre-stressed slabs & paneled beam
Duties and Responsibilities:
- Manage project documentation and formal correspondences
- Compile all related quality documents.
- Review and revise material submittals in accordance to project specifications.
- Revise and approve interim payments and monthly invoice.
- Conducting all related tests and inspection.
- Review QS sheets for architectural and structural works.
- Participated in preparation of Snag list after completion of construction works.
- Monitor work progress according to the time schedule
- Review and approve As-Built Drawings.
- Coordinate all architectural, MEP Drawings. With structural Drawings

في 6. El Nour Consulting Group
  • أكتوبر 2009 إلى يونيو 2010

, "

Estimation Engineer في Misr Engineering Developmen
  • مصر - القاهرة
  • مارس 2007 إلى أكتوبر 2009

, "

Technical office engineer في Q.S
  • مارس 2005 إلى مارس 2007

- Field of work: Design All Construction Works.
- Sites of work: Technical Office.
Duties and Responsibilities
- Pre-Construction studies.
- Design construction building.
- Establishing the time charts, cash flow.
- Check the Design of all of the structural elements.
- The quantities surveying works for all activities.
- The site surveying works.
- Shop drawings for all activities.
- Preparing all procurements materials.
- Supervising, Execution and Revising construction work.
- Using Survey tools in surveying works.

SENIOR COST في Approved By ARAMCO
  • إلى
Project في King Salman Energy Industry City (SPARK)
  • إلى
Area في Al-Khobar
  • المملكة العربية السعودية
  • إلى

50 Km2
.
- Cost of the project: 5 Billion SAR
- Field of work: All Construction & Infrastructure works. In

ENGINEER في Approved by Hill International as Senior Q.S
  • إلى

الخلفية التعليمية

ماجستير, Construction Management
  • في Helwan University
  • يناير 2018

. in Contract Management & Conflict Resolution

دبلوم, Construction management (PRMG)
  • في AUC, the American University
  • يونيو 2008

Specialties & Skills

Project Management
Cost Control
Project Control
Project Estimation
Project Evaluation
AUTOCAD
BUDGETING
CASH FLOW
CONSULTING
COST ANALYSIS
MICROSOFT EXCEL
MICROSOFT OFFICE
MICROSOFT WORKS

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الفرنسية
متمرّس