Ijaz Ahmad, Engineer (Operations)

Ijaz Ahmad

Engineer (Operations)

Operation

Location
Pakistan
Education
Master's degree, Management
Experience
7 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :7 years, 4 Months

Engineer (Operations) at Operation
  • Pakistan
  • July 2012 to June 2013

Engineer (Operation): (July 2012 - present)

Working in Pakistan Petroleum Limited (PPL) at Sui Gas Field, Baluchistan. Prime responsibilities comprises mainly of followings:
• Ensure safe operation and consistent production, maintenance and improvement of plant efficiency.
• Evaluate and interpret of operating data of gas sweetening banks, dehydration units, boilers, water treatment plant and gas turbines on daily basis to monitor plant performance.
• To collect daily & monthly plant production and operating data, evaluate unit efficiencies by relating chemical and energy consumption to plant throughput. Identifies possible trends, prepares reports with comments and submits for review.
• Identify problems and offer solutions with technical logics and firm recommendations for efficient, reliable and safe operation of plants.
• Plan for shutdown and annual overhauling meetings to decide time schedule, work requirements and prioritize tasks.
• To review Laboratory analysis & Gas Chromatograph reports, and recommend corrective actions to maintain quality and quantity of Sales Gas as per GSA.
• Carry out process simulation through Aspen HYSYS to analyse process Plant operations and suggest practical solutions for improvement.
• Formulate new SOPs as per prevailing quality and environmental standards.
• Implement requirements of ISO 9001 and OHSAS 18001 in respective areas. Maintain proper documentation and reporting of system in respective area.
• Conduct surveillance, recertification audits pertaining to QMS and OHSAS systeams. Also conduct technical and energy audit of respective areas for improvement purpose.
• Suggest plant modifications and de-bottlenecking and extension projects to enhance efficiency and improvement purpose.

Deputy Engineer (Process) at Sui Gas Field, Baluchistan in Pakistan Petroleum Limited
  • July 2010 to June 2012

Deputy Engineer (Process): (July 2010 - June 2012)

Worked as Deputy Engineer (Process) at Sui Gas Field, Baluchistan in Pakistan Petroleum Limited (PPL) . Key responsibilities at this position were: • Carry out testing of Emergency Shutdown system of entire plant and suggest remedial actions / means for corrective actions.
• Provide support to Process and Utilities operations with emphasis on optimization for energy efficiency, flaring reduction and troubleshooting.
• Assist in design of plant modifications and de-bottlenecking and extension projects.
• Ensures that completed work has been inspected and that all tests have been satisfactorily completed.
• Ensure implementation of Standard Operating Procedures (SOPs), Job Hazard Analysis (JHA) and HSE related procedures / policies.
• Coordinate with field staff for startup/stoppage/pressurization/depressurization / isolation/normalization, of Gas Sweetening Purification Banks / Dehydration units and ancillary equipments.
• Preparation of Abnormality Report, in case of any abnormality.
• Implement Permit to Work system and issuance of Cold, Hot, Confined Space Entry, Vehicle Entry, Digging / Excavation and Electrical Isolation Permits.
• Ensure Safe and Smooth operation of Gas, LPG and NGL recovery facilities.

Assistant Engineer at Sui Purification Plant in Pakistan Petroleum Limited
  • April 2008 to June 2010

Assistant Engineer (Process): (April 2008- June 2010)

Worked as Assistant Engineer (Process) at Sui Purification Plant in Pakistan Petroleum Limited (PPL)
• Monitor and recommend updates to operation and safety procedures.
• To prepare checklists for monitoring and to ascertain equipment readiness after maintenance.
• Carry out testing of Emergency Shutdown system of entire plant and suggest remedial actions / means for corrective actions.
• Preparation of Abnormality Report, in case of any abnormality.
• Implement Permit to Work system and issuance of Cold, Hot, Confined Space Entry, Vehicle Entry, Digging / Excavation and Electrical Isolation Permits.
• Ensure Safe and Smooth operation of Dehydration Units.
• Control Gas wells Operation using SCADA
• Participate in Wells maintenance activities including Work Over and Bottom Hole Pressure and Bottom Hole Temperature Survey.

Trainee Engineer at Chemical
  • March 2006 to March 2008

Trainee Engineer (Chemical): (March 2006 - March 2008)
Joined PPL as Trainee Engineer (chemical) and worked in different fields during training period to get hands on experience of the job.


ACHIEVEMENTS

• Achieved Quality Management System (ISO 9001) and OHSAS - 18001, being Plant coordinator. Also assisted in retaining the integrity of system and certification.
• Prepared feasibility, P & ID, and designed completely new setup for Flash Gas Recovery System at Gas Sweetening Plant to save 2 MMscfd daily gas flow.
• Suggested isolation scheme to make possible overhauling of Knockout drums of Flash Gases flare stacks for the first time in Plant history.
• Implementation and awareness of SAP system for better understanding. This was achieved by developing Workflows/PMOs, Notifications, making malfunctioning history, making job plans, Preventive Maintenance routines, recording/archiving maintenance and operational histories.
• Played key role in restructuring of equipments in SAP and recommended valuable suggestions to make it more effective and simple.
• Ensured and achieved design availability and reliability of operations, utility and safety systems, through effective coordination within planned budget.
• Assessed, evaluated and executed redesigning & replacement of complete Cooling water network. Almost 80, 000 gallons of water was saved per day after commissioning of this new network.
• Controlled and normalized Purification Plant after black shutdowns.
• Achieved Best HSE man for the year - 2010.

Education

Master's degree, Management
  • at Virtual University of Pakistan
  • January 2011

• MBA (Management) with 2.80 GPA from Virtual University of Pakistan in 2011.

Bachelor's degree,
  • at University of Engineering and Technology
  • January 2006

• Bachelor of Chemical Engineering with Honors (76.7% marks) from University of Engineering and Technology (UET) Lahore in Jan. 2006.

High school or equivalent, College
  • at Govt. College Sadik Abad
  • January 2000

• Intermediate (F.Sc) with 1st position (74.2% marks) in College from Govt. College Sadik Abad in 2000.

High school or equivalent, School
  • at Govt. Model High School Sadik Abad
  • January 1998

• Matriculation with 2nd position (81.9 % marks) in School from Govt. Model High School Sadik Abad in 1998.

Specialties & Skills

Gas Processing
Gas Operations
Water Treatment
Microsoft Office
MS Project
SAP ERP 6.0
ISO 14001
ISO 9001
OPERATIONS
PURIFICATION
OHSAS 18001
TESTING
Aspen HYSYS 6.5
AUTOCAD
Aspen TASC 6.5

Languages

English
Expert
Urdu
Expert