Systems Engineer
compugeorge
Total years of experience :14 years, 11 Months
CompuGeprge is a leading distributor and system integrator in the field of Access control, Video Surveillance, & Time and Attendance.
o Cairo Festival City "CFC"
Access Control
- Supervising installation teams.
- Controlling of the installation progress and implementation efficiency within time frames of Access Control System.
- Ensuring fulfilling the contracted conditions and specification in high quality with minimum cost.
- Follow up with customer to avoid delays and pending schedules.
- Responsible for Maintenance tools, stores and Equipment.
- Coordinate between the company upper board and customer management.
- Create, update and report the project-status of achievement on daily basis.
Parking System
- Supervise installation for Parking Management System.
- Applying configuration of the software using SCADA.
o Other Access control, and CCTV Projects:
Supervise installation, configure the software due to customer requirements and prepare all site documentation.
- Pfizer Egypt.
- Credit Suiss Cairo.
- Eshpitico Egypt.
- Micro Soft Egypt.
- Halliburton
o Telecom Egypt - Huawei (Core Transmission)
Lambda 9 & Cairo Alex Ring
- Technical Supervision on the installation.
- Configuration of SDH Huawei equipment “OSN 6500, 3500.
o Etisalat Misr - Huawei (DSLAM)
Upper Egypt and New Valley
- Acceptance & configuration of SHDSL-ADSL Cards in DSLAM Shelf, Metro 1000 & PTN for Huawei equipment.
- Supervision & Quality control for Installation process.
o Main CDMA Switch at Rass El Teen (Alexdanria )
- Technical Supervision on the installation all (Indoor & Outdoor) Devices of Avaya & Ericsson.
o Cairo Int. Airport - Garage Building (Contractor: Raya Networks & Consultant: Raya Integration)
The project aims at :Guiding cars to the vacant places using lighting pilots and traffic signs, automatic counting of the busy/vacant areas, calculation of the parking time and Tariff.
- Leading a team consisting of 20 technicians in the installation of parking sensors devices around 1of 5 floors garage on 3000m2 area.
- Coordination between the subcontractors performing other tasks
o Fiber optics Projects
- Supervise the installation of Fiber Optics Network for Data transfer & security cameras . Alexandria National Refining & Petrochemicals CO. "ENRPC".
- Supervision of laying and testing Fiber Optic cables for Security Control and Navigation Devices. Cairo & Borg el Arab Airport.
o Design & Supervise installation for internal network in Egyptian Vacation Club group "Club Reef Hotel" - Sharm El-Sheikh
o Creation & updating of technical reports.
o Handling technical & financial quotations & bids.
o Participating in composing and editing company profile.
Installing and Configuration of DSLAM and Metro Ethernet, in the Egyptian centrals, for high speeding internet of Etisalat Misr.
Maintenance & Technical Support department.
"Trained on Servers, Personal computers and notebooks".
• Effective Time Management Understand the nature, tools, and techniques for Time Management, and how can we use these techniques to build an effective Time Management process that will enhance productivity and lower stress
• Certified CCNA (Cisco Certified Network Associate )
• Modern Fiber Optic Network systems Fiber Optics principles, Fiber Optics Networks design, practical Training on splicing all kinds of fiber cables, Fiber measurements fault location and power loss, & Basics of FTTX & GPON
• " SDH Technology & Optics Commissioning " - SDH Technology (Basics, Frames, Flags, Band Widths, & Protection) - Huawei SDH equipment “OSN Family DWDM” configuration using T2000 Software. - Trouble shooting & commissioning SDH systems using SDH Analyzer, Power Meter, & Variable Attenuator
Bsc. of Electronics & Communication, Faculty of Engineering GPA : 3.2 Graduation Project : Advanced Antenna & Diversity Techniques for Wireless Multimedia Communications “WMMC”