JARIS RAMOS, C&A Engineer

JARIS RAMOS

C&A Engineer

Karad International FZCO

Location
Philippines
Education
Bachelor's degree, Instrumentation and Control Engineering
Experience
9 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :9 years, 2 Months

C&A Engineer at Karad International FZCO
  • United Arab Emirates - Dubai
  • January 2013 to April 2016

1. Control and Automation (C&A) Engineer:

Conceptual Design (CD) Phase; Involves in generation/modification of Design Drawing such as, Process Engineering Flow Scheme (PEFS, aka P&ID), Cause and Effect Matrix (CEM) for both Process Shutdown and Fire & Gas, Shutdown Hierarchy Overview, Process Control and IPF Narrative, Safeguarding Memorandum Narrative, Process Description Narrative, & including the Migration of Fail Safe Control Program from the old system to the new one for the purpose of IO tags and logic verification, checking of tags and logic consistency of NEW IPS logic.
Detailed Design (DD) Phase; Verification of existing instruments from the old system to the new one, verification of instruments to be replace for the compliance in lap flange process connection, static graphic review printout checking in compliance with the existing PEFS/Graphics, site survey for orifice data printed on the orifice plate, checking IPS and FGS Logic and make necessary comments based on Shutdown Heirarchy/CEM/PEFS.
Execution Phase; Leading the Loop checking team for the new signal cables. Responsible for verification of field instruments with regards to isolation of each instruments from the old system. Leading the field team during the migration of the instruments/signals from the old system to the new Emerson Delta-V DCS system for process and Honeywell Safety Manager system for Instrumented Protective Function (IPF) & Fire and Gas System (FGS). Verification and migration of pumps signal through Interposing Relay Panel (IRP) to the new system. Mark-up of the documents for as-built.

Brunei Shell Petroleum (BSP)
Seria Crude Oil Terminal (SCOT) C&A Infrastructure Project Seria, Negara Brunei Darussalam
In Partnership with Imtech Industry International/Zainal Daud Sdn. Bhd

C&A Engineer (Kuwait) at Karad International FZCO
  • United Arab Emirates - Dubai
  • November 2012 to December 2012

1. Fire and Gas (F&G) Programming with Honeywell Safety Manager system including Pre-FAT held in Honeywell office in Kuwait with the EPC contractor PETROFAC.

Kuwait Oil Company (KOC)
F&G System Works (Honeywell) KUWAIT

C&A Engineer (Al-Ain Abu Dhabi) at Karad International FZCO
  • United Arab Emirates - Dubai
  • June 2012 to November 2012

1. F&G Instruments Continuity/Loop Check, Testing of F&G Detectors, and F&G Programming with Honeywell Safety Manager system.

Supply of Gas to New Al-Ain Cement Plant for Arkan
Instrumentation and F&G System Works (Honeywell) Al-Ain Abu Dhabi, UAE

C&A Engineer (Qatar) at Karad International FZCO
  • United Arab Emirates - Dubai
  • March 2012 to May 2012

1. ESD Programming including commissioning support using Honeywell Safety Manager system in UREA-6 Plant of QAFCO.

ESD System Works
Missaied Industrial City (MIC), Missaied, Qatar
Qatar Fertilizer Company (QAFCO)

Designer 1 at Fluor Daniels Inc. Philippines
  • Philippines
  • September 2011 to February 2012

1. Control Valves Data Sheet Generation using SPI; Panel Components drawing using Microstation; Identification of DCS, F&G, and ESD Instruments in P&ID and separation of IO for each system.

Super Absorbent Polymer (SAPCO) Project
Fluor Daniels Inc. Phils. (FDIP),
Alabang Muntinlupa, Philippines

Design Engineer at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • January 2011 to August 2011

1. Front End Engineering Design, Preparation of Drawings for Customer Approval, Revision of Drawings, As-Built Documentation.

Phase 5 Basement Level 3 Automation System & RODI Automation System
Baguio City, Philippines
Texas Instrument Philippines Inc. (TIPI),

System Engineer at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • May 2009 to December 2009

1. Additional Programming, HMI Graphics, Process start-up, Commissioning, Systems Documentation, Operator Training.

Glass Plant Furnace Control and Monitoring System (Siemens PCS7 Control System Logic)
Mandaue City, Cebu, Philippines
San Miguel Corporation, Mandaue Glass Plant

System Engineer at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • January 2009 to April 2009

1. System Engineering and Configuration of Siemens PCS7/S7400/WinCC at Vent System.

Geothermal Steam Production Plant Station A Vent System
Laguna, Philippines
Chevron Geothermal Philippines Holdings (CGPHI), Makban Geothermal Fields.

System Engineer at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • November 2008 to December 2008

1. System Engineering and Configuration of Siemens PCS7/S7400/WinCC at Steam-Water Separator Station.

Geothermal Steam Prod. Separator Station Control System Upgrade
Laguna, Philippines
Chevron Geothermal Philippines Holdings (CGPHI), Makban Geothermal Fields.

System Engineer at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • September 2008 to October 2008

1. Systems Engineering & Configuration of Siemens S7-300 and WinCC Flex HMI.

WS7 and WS9 Control Systems Upgrade Project
Chevron Geothermal Philippines Holdings (CGPHI), Tiwi Geothermal Fields. Albay Philippines

System Engineer at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • July 2008 to August 2008

1. Systems Engineering, Configuration, Start-up & Commissioning.
2. SCADA Maintenance Support

Chevron Geothermal Philippines Holdings (CGPHI),
Makban Geothermal Fields.Laguna, Philippines

System Engineer at Instrumentation and Control Engineering Inc. (I&CS)
  • Philippines
  • June 2008 to June 2008

1. Systems Engineering & Configuration of Siemens S7-300 PLC and WINCC HMI.

JTA2 Boiler Control Systems
Binalbagan Sugar Company (BISCOM) Inc.
Negros Occidental, Philippines

System Engineer at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • April 2008 to May 2008

1. Project Engineer Systems Engineering & Configuration, Start-up & Commissioning, As-Built Documentation.

Chevron Geothermal Philippines Holdings (CGPHI), Makban Geothermal Fields.
SS5 Alarm Annunciator System
Chevron Geothermal Phils.Hldgs. Inc., Laguna, Philippines

In-house Instrument Technician/Maintenance at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • March 2008 to April 2008

1. Responsible for Preventive and Corrective Maintenance for all instruments inside the plant.

Unilever Philippines (PRC)
Instrument Maintenance Technician
UN Avenue Manila

Instrument Technician (Project) at Instrumentation and Control Specialists Inc. (I&CS)
  • Philippines
  • October 2007 to February 2008

1. Instruments fitter.
2. Instruments configuration/calibration/termination.
3. Panel and JB wiring.

Consolidated Industrial Gases Inc. (CIGI)
70 TPD ASU / 150 TPD NLU Refurbishment Project
Sta. Rosa Laguna, Philippines

Calibration Officer at Instrumentation and Control Specialist Inc. (I&CS)
  • Philippines
  • March 2007 to September 2007

Instrument Calibration and Maintenance for the following site;
1. Air Liquide Philippines Inc., (ALPI) Philippines
2. Consolidated Industrial Gases Inc., (CIGI) Philippines
3. Interphil Laboratories Inc., (IL) Philippines
4. Johnson & Johnson Philippines
5. Procter and Gamble Philippines
6. Procter and Gamble Philippines

Intern at Burkert Contromatics
  • Philippines
  • March 2006 to February 2007

1. Configuration and commissioning.
2. Configuration/Testing and Wiring of Junction Box for Level Control.
3. Wiring of relay panel for controls.

Education

Bachelor's degree, Instrumentation and Control Engineering
  • at Rizal Technological University
  • April 2007

Specialties & Skills

Commissioning
Engineering
Instrument Control
Pneumatics/Electropneumatics/Hydraulics
Intergraph Smart Plant Instrumentation (SPI)
Process Instrumentation
Bentley Microstation
Process & Instrumentation Diagram (P&ID) and other Instrumentation and Control Drawings
Emerson DELTAV system
wiring & configuration of transmitters
Honeywell FSC and Safety Manager System
Programmable Logic Control (PLC) - Siemens
Autodesk AUTOCAD 2D
HMI Engineering - Siemens
Industrial Calibration

Languages

English
Intermediate
Malay
Beginner

Training and Certifications

7018 - Delta-V Hardware and Troubleshooting (Training)
Training Institute:
Emerson Process Management
7009 - Delta-V Implementation I (Training)
Training Institute:
Emerson Process Management