Provide senior-level leadership with accountability for project activities across FEED, EPC, PMC, and EPCM. Simultaneously lead numerous projects, from inception to completion, implement approved actions to mitigate risks and achieve project closeout. Chair kick-off meetings, act as a primary point of contact for all stakeholder communications, share progress and best practice to achieve expectations. Direct tasks to a multi-disciplined workforce. Set goals, provide technical and managerial guidance throughout the team. Oversee (and responsible for) financial health, reporting, and compliance, allocate and monitor budgets. Additionally, evaluate tenders, estimate costs, and control contract requirements. Manage Health, Safety and Environment.
Additional responsibility (Business Development), Proposal/tender Manager for Feasibility Study for Assessment of CCWS, Feasibility Study to replace Wellhead Control System of Khuff Towers, Feasibility Study to replace ESD system at GTP and NGTP, Carry out Detailed Engineering for Depressurization of Sub-sea Gas Injection Pipeline, replacement of lube oil cooler G130A/B in GG-II, Spent Caustic Treatment Plant Project, Pre-PIN Study for Assessment of Turbo Expander Trips
Presentation to internal management with risk analysis (A form/B form), Gate reviews etc.
Key Projects:
PMA/PMC - Safe Routing of Safety Valve Discharge at ADR and RRD - Project T/L, Engineering Manager
Budget: USD 35 Million Team Size: 12 TAKREER
•Effectively delivered Project Management Assistance / Team Leadership.
•Successful in the execution of project and contract management across EPC contracts in line with TAKREER/ADNOC regulations and guidelines.
FEED - Safe routing of Safety Valve Discharge at ADR and RRD - Project Manager
Budget: USD 1.5 Million Team Size: 27 TAKREER
•Successfully resolved issues with tanks/vessels to prevent inventories being released into the atmosphere during emergencies (high pressure situations).
•Effectively completed pre-FEED (concept optimisation), FEED and also PMT assistance to client; all work was monitored by corporate ADNOC.
FEED - ESD Valve Replacement/Addition at Propane, Butane Storage Tanks and at Train 1&2 - Project Manager
Budget: USD 1.1 Million Team Size: 15 GASCO
•Identified and solved a problem with tanks and vessels susceptible to high pressure - according to HAZOP and SIL recommendations.
•Delivered a FEED package to client for EPC tendering purposes.
Project - Detailed Engineering - Installation of New Produced Water Treatment Plant at Zirku - Engineering Manager
Budget: USD 5 Million Team Size: 50 Galfar / Arabian Industries / ZADCO - offshore
•Successfully managed engineering and project requirements including procurement assistance, vendor evaluation, and construction assistance to expand a produced water treatment plant through to successful commissioning.
FEED - Detailed Engineering - Accommodation Expansion of CAP, UAP and USAP - Engineering Manager
Budget: USD 1 Million Team Size: 20 ADMA
•Productively handled capacity enhancement to re-design existing accommodation to create extra rooms.
•Critically developed an EPC package for construction.