Project Manager and System Architecture at Pharmaceutical Company
  • Saudi Arabia
  • February 2014 to July 2014

Pharmaceutical Company Barcode MES System Project Manager: February 2014 ~ July 2014

1. Medicine barcode MES system as Project Manager and System Architecture engineer
• Consultant engineer of Medicine Barcode MES System
- Designing System Architecture and Barcode configure for Pharmaceutical Company
- Analyze for Government Recommendation and Scope of work procedure
- Database designing in Oracle for MES
- Endian Open source Firewall Server review for integration
- Client system process design
• Achievement
- Improvement for Cost center profit and enhance proficiency
- Easy to use design for EDI of Government System

* MES (Manufacturing Execution System)

Security consultant and System Architecture at SDS
  • August 2012 to August 2013

Security Management System Architect and Consult of Samsung SDS in Kuwait: August 2012 ~ August 2013

1. SMS integration management as Security consultant and System Architecture engineer
• Consultant engineer of Security Management System in KOC EF1700 project
- Stabilize SMS and new integration management
- Integrate manage BMS to SMS work
- Perform monitoring with NMS integration
- Reviewed RFP and Scope of work procedure
- Evaluated an operational efficiency through daily/monthly
- Performed trouble shooting of operation problems and process development
- Managed a daily issues
- Performed investigation of client-server process
-
• Achievement
- Improvement for integration time span and enhance proficiency
- Trouble shooting the issues of environmental problem

IT consulting and development at Korea Ministry of Health's Voucher BI Web
  • January 2010 to July 2012

IT consulting and development: January 2010 ~ July 2012

1. Writing business proposal for Korea Ministry of Health's Voucher BI Web system
• Leader of consultant engineer for BI Web System
- Attended project team to make a proposal in TrueData Co.
- Conducted project during 6 months as a leader
• Business Architecture for BI System

2. KT (Korea Telecom) BIT project (FDH financial part)
• Sub-leader of development group
- Attended SAP_FI (Financial) module DB upgrading Teradata PL program in LG CNS Co.
- Reduce development time and migration time to move Oracle DB to Teradata
- Leading a PL development group
- EDI analysis for the data transformation between different two systems

3. Korea Energy Management Corp. Management by Objectives system
• Project manager of Objectives management system
- Analyze new Objectives management system and build up a new management system
- Conducted project during 8 months as a project leader
- Shorten the overall project due date and establish concrete system

4. Doosan-Infracore Co. EIS (Executive Information System)
• System Consultant of EIS Web system development
- Trouble shooting EIS server and client
- Development server side application which is Service Manager System for fault-tolerance

5. Android Black Box system
• Project manager of Android application development
- Submit patent with Android car black box app. in Korea
- Achieve a new possibility of using a smart phone it can be record like a flight black box system

6. Korea Hydro Nuclear Power Co.
• Project manager of Vehicle Pass Control System in Mobile
- Gathering a new requirement from customers
- Analyze the request to adopt for new Pass Control System
- Develop VMS Raw Data Management system with OpenNMS
- Conduct consulting and leading a development team as a leader

• Project manager of the RWGM (Radioactive Waste Glassiness Management) System
- Analyze procedure of RWGM of entire plants work process
- Build up a new process for an efficiency
- Conduct consulting, leading a development and training as a leader

IT Manager and Consulting at Consulting to C.P.U Co. in Ishikawa
  • July 2005 to December 2009

IT Manager and Consulting team of UM tech: July 2005 ~ December 2009

1. Japan
• Consultant of IT professional
- Consulting to C.P.U Co. in Ishikawa, Japan RFID Asset Performance Management System: Nuclear Power Plant materials management system using RFID consulting
- Health management system consulting with the Umtech Japan
- Review NMS and Firewall system of local product to Japan customers
- Conduct presentation of the RFID Asset Performance management system to Japan customer

2. Korea Hydro Nuclear Power Co.
• Project manager of Mobile and Server system
- Development team managing for Vehicle Pass Control System in Mobile
- Fist apply the Human oriented design concept in Mobile system
- About 45% increase the vehicle flows by using this system in the power plant area
- Conduct consulting, and managing a development team as a leader

• Development team senior manager for Materials Management system
- Analyze the process of the nuclear materials and management method using XML
- Reduce search time for the material in warehouse by using this system
- Prevent material part loss and increase to cost cutting
- Conduct consulting and manage the development team as a leader

3. Korea Boat and Cycle Org. RFID Asset Performance management system
4. Dankook Univ. Product cost center system
5. K-Won Co. Materials In and out management system
6. Korea Fire Power Co. Materials Management system using Mobile
7. Jangsu Country Office individual Korea Cow management
8. Central Radio Management Office Asset Performance management Consulting

Project manager and consulting engineer
  • July 2002 to June 2005

Consulting and development team of Dasan ITS: July 2002 ~ June 2005

1. Beohringer Ingelheim Korea RFID production process management system
• Project manager and consulting engineer of RFID System
- Designing a new strategy for the production process management
- Review and Analyze RFP and Scope of work procedure
- Performed new ideal process of operation problems and process development
- Performed investigation of production process and feedback to RFID system
• Achievement
- Improvement for production efficiency and enhance IT proficiency

2. Iran Hyundai Construction Access Control system
• Project manager and consulting engineer of RFID Access Control System
- Reviewed gate pass philosophy and build up new pass control system
- Performed designing to gate pass controller for people and vehicle
- Achieve cost efficiency for human resources

3. U.A.E Dubai Access Control System Consulting
• Consulting engineer of RFID Access Control System
- Presentation to customer for RFID Access Control System
- Guide a new way to control of Access and Pass Control system
- Achieve new business opportunity in the Middle East security area

4. Korea Central Radio Management Office GPIB auto measuring system

at Korea Exchange Credit Card Co
  • September 1995 to February 2002

Consulting and development team of DIT Korea: September 1995 ~ February 2002

1. Korea Assembly Multimedia recording system
2. Korea Exchange Credit Card Co. B2B Database consulting
3. Korea BC Card Co. Debit Card system project management
4. Korea Country Office Attend management system using RFID
5. Korea Electric Power Co. BBS system

Korea Meteorological Administration Weather at Munhwa Broadcasting Company
  • March 1992 to August 1995

IT development team of Sambo Information System: March 1992 ~ August 1995

1. Korea Meteorological Administration Weather forecasting management system DBA
2. Taegu Police Administration 112 C3 System DBA
3. Korea MBC (Munhwa Broadcasting Company) Broadcasting data management System

at IBM
  • United Arab Emirates
  • March 1988 to February 1992

IT development team of Bum-A Information System: March 1988 ~ February 1992

1. IBM mainframe to UNIX downsizing project
2. Develop Warehouse management system
3. Develop Material Management System

Education

Bachelor's degree, Computer Science
  • at Korea National Open University
  • February 2017
Diploma, Computer Science
  • at Gachon University
  • March 1988
Bachelor's degree, Computer Science and Computer Networks
  • at Gachon University
  • February 1988

Specialties & Skills

Nuclear Engineering
System Architecture
Project Management
ASSEMBLY
DATABASE
ENGINEER
FIREWALL
INCREASE
MATERIALS MANAGEMENT
NUCLEAR POWER
PROCESS DEVELOPMENT
PROJECT MANAGER

Languages

English
Beginner
Korean
Expert