Syed  Kamran Akhter, Senior Highway Engineer/Regional Lead

Syed Kamran Akhter

Senior Highway Engineer/Regional Lead

AECOM

Location
Great Britain (UK) - Leeds
Education
Master's degree, MSc Transport Engineering and
Experience
15 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 6 Months

Senior Highway Engineer/Regional Lead at AECOM
  • Saudi Arabia - Tabouk
  • My current job since March 2023

Job Application
2/12/2024

2/13/2024
Traffic/ Highway Engineer KEO International Consultants


anita.yadav@nesfircroft.com Energyjob line
Ahsan Shahryar for EGIS
2/16/2024
AECOM AL ULA


Bechtel
Sr Civil Engineer - Roads Requisition ID: 273303











KSA Vision 2030 Project in NEOM such as NEOM The Line, NEOM Airport, NEOM Bay, Gulf of Aqaba, Shusha Island, Sindalah Island, Trojena, Oxagon, Outer Regions, Regional Infrastructures (Construction of a 170Km and 500m tall, The Line City, luxurious islands, adventure sport areas, industrial city & sustainable port, NEOM Airport worth over $500 billion project in Neom). Checking design compliance as per the stage/gateway review and approval procedures of NEOM for different design stages such as Master Planning and Asset Brief, Concept Design, Developed Design, Detailed Design and Tendering and IFC stages. Project Management of highway design works related to Neoms regions, including consultation with PMC (Project Management Consultant) and PDT (Project Delivery Team). Review/undertake technical audit of Highway Design / Pavement Design AASHTO 1993, Geotechnical Studies, Road Safety Audit GG119 (all Stages and Briefs). Review Design Basis Report of highways for various NEOMs regions and provide comments on technical road design parameters such as highway link design, review of road profiles including horizontal and vertical alignments, K values for crest/sag curves, safe stopping distance, full overtaking distance, curvature, superelevation, road drainage, earthworks, gulley design, sustainable drainage design, merge and diverge design for motorway and all-purpose roads, parking design, junctions/intersections design both priority and signalised junctions, cycleway design, RRRAP, VRS systems as per the requirements of KSA Ministry of Transport (MOT)/ MOC Standard Specifications, Highway Design Manuals, AASHTO - Geometric Design of Highways and Streets Volume, MOMRA Design Standards, DMRB - UK. Ensures compliance of design with all applicable codes and regulations. Review of the Earthwork, Cut & Fill details, Site Grading Plan and coordination with Road Contours and the Utilities Design. Review contractors construction drawings and check co-ordination between design and construction matters and respond to technical queries and technical submittals to ensure compliance with NEOM standards. Review public realm studies and design, signage and wayfinding drawings, road lighting drawing.Review Mobility Studies, Multimodal Traffic Impact Studies as per NEOMs Traffic Impact Study Procedure PRC-013, cycle track design and pedestrian circulation paths, Traffic Engineering/Traffic Modelling aspects as per the compliance requirements of NEOMs Design Procedures and Deliverables and NEOMs Engineering Procedures and to check and ensure the documents submitted for reviews are compliant with the contract (SOW) requirements. Review and provided design comments on major Civil Engineering and Infrastructure Engineering projects, including access roads, emergency accesses, Electric Vehicle Infrastructures, pedestrian and cycleway design, Sustainable Urban Mobility Plan, & Urban Realm Strategies design as per NEOM working standards, MOT, MOC and AASHTO design standards. Review and answer RFIs related to technical queries in relation to highway design. Review and discuss project departures / deviation from standard requests with NEOM Mobility, design consultants, contractors, and stakeholders. Attending meetings with PMC, PDT, and key stakeholders to discuss workflow closing strategies and answer technical queries on the comments resolution sheet (CRS). To review NEOMs Internal and General Stakeholders comments on the CRS sheet regarding design of infrastructure and provide response accordingly. Attending meetings with PMC, PDT, and key stakeholders to discuss workflow closing strategies and answer technical queries on the comments resolution sheet (CRS).

Highway Development Control Manager at Wokingham Borough Council
  • United Kingdom - London
  • October 2021 to February 2023

(Highway & Infrastructure Design) Oct 2021 to Feb 2023

Principal Engineer at WSP
  • United Kingdom - Manchester
  • September 2020 to September 2021

Key Projects Involved and Major Accountabilities South Wokingham Distributor Road & North Wokingham Distributor Road, Arborfield Cross Relief Road, Western Gateway (Construction of a spine roads to serve 10, 000 new homes worth UK £ 250 million).
• Liaise as a lead member of the Highway Infrastructure Board in discussing and agreeing on project departures / deviation from standard requests with design consultants, contractors, and developers.
• Reviewed and Checked Departure from Standards for highway design features such as Superelevation at shallow gradients, lack of Transition Curves, lack of Stagger spacing b/w junctions, lack of visibility on the approach to roundabout, lack of visibility for Shared use pedestrian and cyclists visibility, departure from standards for RRRAP and VRS design etc. and agreeing compensatory measures with Designer.
• Reviewed Multimodal Traffic Impact Study, Micro-mobility Study, Share Surface Audit, Electric Vehicle Charging methodology, traffic modelling both for micro-simulation and macro simulation including reports VISUM, VISSIM, Synchro Studio and SIDRA.
• Experience of developing strategies for Public Transport Diversion to new dwellings, involving developing Bus Cost Revenue & Cost Estimate and writing Draft Public Transport Strategy for new developments in Wokingham. Worked on various projects in Wokingham on Mobility and SUMPs Studies.
• Involved in writing Technical Design Guide for Electric Vehicle Parking to update Wokingham Borough Council Highway Design Guide Living Street_ A Highway Guide for Developers.
• Design of Pedestrian and Cycle Improvement schemes at various locations in South Wokingham consisting of eleven routes.
• Liaise with Principal Contractor Balfour Beatty and design consultants such as WSP, Volkers, Sweco, Tony Gee and Pegasus on behalf of the Highways Authority on scoping/meeting regarding highways design matters.
• Liaise on planning and project management issues with the Wokingham Local Planning Team internal consultees on matters such as landscape design, public right of way/pedestrian bridge design, route diversions, Water and Environment Agency, Boroughs Drainage and Flood Risk sections and Boroughs Structure section on retaining wall/retaining structures issues which could potentially affect public major roads and interface local roads.
• Review/audit technical design of spine major roads and provide comments and prepare reports on technical road design parameters such as highway link design, review of road profiles including horizontal and vertical alignments, K values for crest/sag curves, safe stopping distance, full overtaking distance, curvature, superelevation, road drainage, gulley design, sustainable drainage design, merge and diverge design for motorway and all-purpose roads, junctions/intersections design both priority and signalised junctions, cycleway design using new LTN 1/20 standard, Mobility Studies, Non-Motorised User (NMU) Audits, Vehicle Restraint System (VRS) design, bus stop design etc., in accordance with the DMRB and TSRGD principles and as per information in the Manual of Contract Document for Highways Works
• Liaise with contractors on behalf of the overseeing organization to arrange stage 1, 2 and 3 road safety audits (RSAs) of major roads in accordance with GG 119 (DMRB) and undertake a review of RSA Brief, RSA 1, 2, and 3, review of Designer Response Report and Departure from Standard Reports.
• Carry out meetings to discuss site safety traffic issues with Principal Consultants, Contractors, Sub Contractors, and Health and Safety executives on behalf of the Local Highway Authority.

Project Manager / Principal Engineer at WSP-Leeds
  • United Kingdom - Manchester
  • July 2016 to August 2020

Key Projects Involved and Major Accountabilities

High-Speed Rail Network (Curzon Street and Old Oak Common Station Design) High-Speed 2 is the planned rail network between London, the West Midlands, and the North worth UK £ 55.7 billion).

Homes England Framework (Ambition of delivery of estimated 300, 000 homes each year worth UK £100 million) A1 Birtley to Coal House (Major widening of A1 Newcastle Gateshead Western Bypass (NGWB) to increase capacity), Halifax Bus Station Masterplan, Harrogate Town Centre Masterplan, Castle Gateway Masterplan and Various Strategic Road Design with National Highways, Leeds City Council Infrastructure Projects Technical Support, Castle Gateway Masterplan for City of York. Easingwold
Parking Study North Yorkshire County Council, Catterick Strategic Highway Model, A556 Development Consent Order.
Highway and Transportation Design matters for Masterplanning of Yas Bay waterfront destination Abu Dhabi &Iconic Project of Mashreq Banks new Headquarters (72, 000sqm built-up area development), Dubai, Provided remote assistance in, highway design, traffic management, in writing a traffic impact study, design of service accessibility, design of on-site car parking and drop off areas and design of general vehicular circulation plan. Various Strategic Road Design with National Highways, Leeds City Council Infrastructure Projects Technical Support, Castle Gateway Masterplan for City of York. Easingwold Parking Study North Yorkshire County Council, Catterick Strategic Highway Model, A556 Development Consent Order

• Undertook Project Manager and Work Order Manager roles in regularly reviewing/monitoring Project Summary Reports by using WSP PFT (Project Forecasting Tool) and regularly arranging meetings with WSP Highways, Structure, Drainage and Flooding and Water and Environment sections.
• Attended meetings with clients, technical groups and stakeholder forums on behalf of WSP Highway Design and presented PowerPoint-based technical information on existing and proposed road alignments, cutting, embankment, and earthworks.
• Set the scope of the required engineering tasks based on clients supplied information, carried out price modelling, and updated/completed deliverable matrix and bid review checklists in accordance with WSP Wiki Bid procedures.
• Provided technical assistance and attended pre-bid meetings, prepared bid Proposals to set project prospects, carried out price modelling of schemes, and managed the life cycle of projects from winning works to the delivery stage.
• Created and managed design team programmes and coordinated with design managers regarding meeting deadlines.
• Monitored and forecasted the financial performance of the projects, both actual and forecasted performance, maintained detailed records and systems for monitoring project performance, and worked on variations. Conducted weekly reviews with internal and external design managers and the project teams as appropriate and arranged monthly meetings with the Project Director to review project performance.
• Undertook detailed technical design checks of the new/proposed major highway infrastructures design on various projects and liaised on master planning and environmental constraint issues.

Senior Highway Engineer at Aberdeen City Council
  • Great Britain (UK) - Aberdeen
  • August 2010 to May 2016
Engineer at Aberdeen City Council
  • United Kingdom - Aberdeen
  • November 2008 to August 2010

Key Projects Involved and Major Accountabilities Aberdeen Western Peripheral Route (A major 58KM Transport Scotland Scheme £745m), Aberdeen City Centre Masterplan (A £1 billion to regenerate City Centre), Kingswells Park and Ride, NHS Aberdeen Multi-storey Car Park(A £10m Car Park), Roads Construction Consents of spine roads at Rowett South Construction of a West Link and signalized roundabout at Counteswells (A project to support access to 7000 dwellings)
• Liaised with principal contractors, contractors, design consultants and internal masterplan, traffic modelling and traffic management departments on the scope of works.
• Prepared and monitored site diary, prepared conditions of the contract document, tender documents, and schedule of site operations day works and prepared/updated Auto CAD drawings, and RFIs whenever required.
• Prepared Public Consultation and Statutory Undertaker Reports on major projects/sections.
• Reviewed SUDS Drainage Designs and Flood Risk Assessments and provided technical reviews on highway design matters.
• Prepared Bill of Quantities (BoQ) as per the requirement of Manual of Highway Works and advised on costs of major highway schemes.
• Prepared gully spacing spreadsheets & calculated gully spacings and undertook gully spacing design in accordance with DMRB Volume 4a HA 102/00.
• Undertook technical audit of road design parameters, including horizontal and vertical alignment, K values, Safe stopping distance, full overtaking distance, curvature, superelevation, road drainage and vehicle restraint system (VRS) and advised design improvements.
• During the project delivery, liaison with Traffic Management regarding TRO, TTRO, and Road Closures matters.
• Arranged public consultation events, analysed concerns, and attended meetings with Councillors to discuss disruptions during construction, congestion, and public road safety matters.
• Reviewed soil stabilization report, soil penetration tests and CBR values on major road sections and advised design changes wherever required.

Education

Master's degree, MSc Transport Engineering and
  • at The University Of Salford
  • January 2008
Bachelor's degree, BEng Civil Engineering,
  • at NED University of Engineering and Technology
  • January 2002

Specialties & Skills

INFRASTRUCTURE
HIGHWAY DESIGN
MANAGEMENT
CONSTRUCTION
EARTHWORKS
GEOMETRIC DESIGN
TRAFFIC ENGINEERING
PLANNING
MICROSOFT POWERPOINT
SCHEME (PROGRAMMING LANGUAGE)

Training and Certifications

Built Environment (Training)
Training Institute:
CIHT
Date Attended:
April 2018
Duration:
120 hours