Project Engineer
Alexandria for general contracting
Total years of experience :15 years, 11 Months
Arrangements for site work procedures, supervised all construction process in-situ according to required specifications, make the effective communication between stakeholders, interdiction of over cost, followed the resource plan units and cost and make sure of over allocated resources.
Attended meetings with contractors and owner,
Supervised construction process of culverts,
Reviewed cross sections of the designed road,
Prepared all quality control documentation,
Reviewed the bar bending sheets,
Prepared quantitative analysis,
Prepared qualitative analysis,
a. Prepare a scheduled weekly estimation of testing materials b. Monitored aggregate quality crusher production c. Setting crusher and plant screens configuration d. Provided all QC reports e. Monitored concrete production and provided design criterion according to ACI 855
Monitoring material changing and suggesting solutions
Monitoring any changing in concrete and asphalt materials
Reviewing material monthly reports
Monitoring the construction process of box culvert and pipe culvert
Performing concrete mix design with all required calculations according to mrdtm 515 & mot 855
Proposing solutions to any problem appears in asphalt concrete due to material change
Cheching all bar bending tables
Checking the requests submitted by contractor
Material quality control
Checking the concrete mix design and asphalt mix design
Preparing material monthly report
Responsible for work in situ as site engineer
Submitting requests for consultant
BE in geological and geophysical engineering