Karthik B Nair, Senior Planning Engineer

Karthik B Nair

Senior Planning Engineer

Meydan Shobha Construction

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, B. Tech- Civil Engineering
Experience
15 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 11 Months

Senior Planning Engineer at Meydan Shobha Construction
  • United Arab Emirates - Dubai
  • My current job since July 2018

Project: Meydan One Mall Infrastructure works
Project Value: AED 750 million.
Consultant/ Architects: AECOM
Client: The Meydan Group
Contract Type: Lump sum contract


Project Scope: New Road development for access to Meydan One mall. 5 multilevel bridges (Total Span: 2250m), 3 Underpasses (Total Span: 610m), Deep utility networks (54, 000m), Shallow utility networks (51, 000m) & Road works (220, 000m2).
The key aspect of the project is the availability of limited time & limited space constraints because of multiple projects happening beside the Project right of way.
Key Performance Areas:
• Managing the team of subcontractor planners to develop the Baseline programme.
• Develop the procurement schedule along with the E1 & E2 logs for proper project control.
• Development of project monitoring microlevel target charts for Construction team buy-in.
• Monitor project progress and ensure delay events are correctly identified & notified to the Engineer.

PMP Certified Senior Planning Engineer at Salini Impregilo SpA
  • United Arab Emirates - Dubai
  • January 2017 to July 2018

MEYDAN ONE MALL PROJECT, DUBAI
Project Value: AED 1.5 Billion.
Consultant/ Architects: AE7
Client: The Meydan Group
Contract Type: Lump sum contract
Project Status: In progress
Project Scope: Construction of the Structural works package for the 430, 000 sq.ft. Meydan One mall project including the support structure for the World’s longest indoor Ski slope (1km) and Dubai’s largest dancing fountain.
The key aspect of the project is the pace of construction where the entire package is to be completed within an incredibly short duration of 23 months.

PMP Certified Lead Planning Engineer at Salini-Impregillo SpA
  • Qatar - Doha
  • May 2013 to January 2017

Planning Engineer handling the QR 450 Million Abu Hamour Project.

Project Scope:
- Construction of Stormwater tunnel (9500m deep, 4.5m diameter & approx. 30m depth) using EPB Tunnel Boring Machine.
- 33 No. Access shafts with Diameter varying from 6.4m to 13m
- Microtunnelling works for more than 1Km length.

Job Responsibilities:
- Prepare & obtain approval for Project Baseline programme (In accordance with Industry standards and Project contract conditions)
- Prepare detailed Construction level programmes & Look ahead schedules.
- Prepare and track procurement activities for TBM consumables (Very critical activity especially considering the salient nature of the project due to which most of the materials had to be procured from outside Qatar, increasing the lead time considerably).
- Analyse individual activities to identify productivity looses and optimize construction sequences (Example: Created detailed construction crew movement charts to optimize resource utilization thereby saving considerable time and costs.
- Prepare and submit Monthly, Weekly and Daily progress reports.
- Prepare Delay analysis schedules and assist in preparing Contractual claim submissions
- Assist Cost control & Billing departments to monitor the Budget & cost status during project execution..

Planning Engineer at Al Naboodah Construction Group (ANCG)
  • United Arab Emirates - Abu Dhabi
  • July 2011 to May 2013

Job Responsibilities Handled:

Preparation & approval of Contract Programme.
Preparation of Key Performance Indicators (KPI's) & Weekly Updation of the same.
Preparation of Detailed Construction Programme.
Scheduling & Tracking of activities & Updating the various Programmes.
Preparing & Estimating the Resource Histogram & Material submittal & approval schedules.
Preparation of Daily Progress Reports, Weekly Progress Reports, Monthly Progress Reports & Preparing Management Information System (MIS) reports.

Engineer- Planning/ Billing at Shapoorji Pallonji & Co. Ltd.
  • India
  • July 2008 to July 2011

Skills Developed/ Job Responsibilities Handled:

Study of drawings, BOQ, Contract, Tender documents & specifications.
Quantity take-off as per the drawings & specifications.
Timely invoicing, certification & collection of payments from client.
Operating & executing New Sub-Contractor Work Orders.
Scheduling & Tracking of activities.
Sub-Contractor Bill Reconciliation & Costing.
Preparation of Daily Progress Reports. Weekly Progress Reports, Monthly Progress Reports & Preparing Management Information System (MIS) reports etc.
Rate Analysis of Extra items & preparation of Comparative Statements.
Preparation of Labor & Sub-Contractor Bills in ERP. (Supply, Measurement & with materials).
Preparation of PSE, C to C’s, Labour Costing Sheets etc.

Education

Bachelor's degree, B. Tech- Civil Engineering
  • at TKM College of Engineering, Kollam
  • July 2008

B. Tech with aggregate percentage 69% No History of Back papers. Selected for ALDEP (Accelerated Leadership Development Programme)’ 2010 Batch while working in Shapoorji Pallonji & Co. Ltd. Secured regional second place among GET’s while presenting the Study on TMML project, Dharwad while working in Shapoorji Pallonji & Co. Ltd. Was batch representative in student council during the academic year 2007-08. Was the Convenor & sponsorship committee head for the National Level conferences held in college during 2008 & 2007 respectively.

Specialties & Skills

Tunnelling
Project Control
Primavera P6
Microsoft Office
Scheduling
Microsoft Excel
Primavera P6 V6.0
Primavera P6 V8.2
Autocadd
Tilos Linear scheduling software
Microsoft Project
Navisworks Freedom

Languages

English
Expert
Hindi
Intermediate
Malayalam
Expert
Kannada
Beginner
French
Beginner

Memberships

Project Management Institute (PMI)
  • Aggregate and share knowledge resources related to Project management practices & principles
  • August 2016

Training and Certifications

PMP (Project Management Professional) (Certificate)
Date Attended:
November 2016
Valid Until:
November 2019