Civil Engineer
ASCO Consulting Engineers
Total years of experience :12 years, 0 Months
- Worked on 1D-2D hydraulic analysis and design of stormwater network
- Prepared design development impact assessment report to claim additional work for contractor.
- Optimization of detailed design network; redesign has been undertaken using 1D hydraulic analysis to confirm no flooding caused by optimization and was also complemented with 2D model to verify any impact on surface flow by the optimization
- Prepared zoning strategy report based on water source availability and topographic survey data.
- Prepared Detailed Design potable water distribution network scheme which includes 424km distribution line, water treatment plant, 14 elevated storage reservoir, 6 storage reservoir with pumping station, 65km rising mains; benefited 122 thousand population in 49 villages
- Worked includes drainage design, coordination of project activity, utility of clash resolution
- More than 100 utility clashes resolved with drainage network
- Designed more than 200nos of Curb and grated inlet.
- Day to day project activity coordination with client
- Existing water distribution network model build,
- Performed model calibration exercises
- Analyzed performance of model with additional water supply demand and network
- Site grading
- Detailed design of foul sewer and storm water network
- Utility conflict check analysis with dry and wet utilities
- Project coordination with client and internal project team
- Preparation of cost estimates and drawing for tender
- Prepared assessment of existing infrastructure in slum area; filed visit and household survey analysis
- Prepared detailed project report
- Project coordination with client
Semester IV Research Topic “ Integrating Public Transport Ticketing – A case of Ahmedabad City” (Jan’12 –April ’12) Guide Prof. Talat Munshi, Faculty of Planning & Public Policy, CEPT University, Ahmedabad Details This research is basically described and analyses of how an implementation integrated ticketing system can improve the experience of public transport system. Semester III Lab Topic “Ahmedabad Multimodal Transport Hub” (July’11 –Dec’11) The Objective were: To analyze the major integration junction of existing and proposed public transport system To study the travel characteristic in the city To propose concept design of multi modal transport hub and prepare project report Semester II Lab Topic “Rural Development Program (RURBAN Project) for Cluster of Village in Dang District” (Jan’11-April’11) The Objective were: To give the basic infrastructure facility like potable water, sewer, toilets and public transport connectivity to city in Rural area. Semester I Lab Topic “Technical Option for sewerage treatment an solid waste management in Gangtok City” (July’10-Dec’10) The Objective were: To understand present scenario of the region To study the various sewerage technical treatment option (Centralized and Decentralized) Proposal for solid waste collection and decentralized sewerage system for community
Civil Engineering