كيران HARI KUMAR,  Seniour Estimation Engineer

كيران HARI KUMAR

Seniour Estimation Engineer

GBH International Contracting

البلد
الإمارات العربية المتحدة - دبي
التعليم
ماجستير, MBA
الخبرات
13 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 9 أشهر

Seniour Estimation Engineer في GBH International Contracting
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ مارس 2015

Collaborate with senior management to review corporate projects and determine scope of work with a strategic focus
on optimizing affordability and efficiency while meeting client specifications and requirements. Design and implement
custom electrical systems, overseeing estimation, tendering, and supervision of project processes including quantity
survey, costing, technical proposals, and execution plans. Manage submission, approval, and project documentation
for DEWA compliance.

PROJECT ENGINEER في PARAMONT TECHINACAL
  • الإمارات العربية المتحدة - دبي
  • يناير 2013 إلى مارس 2015

Successfully completed several large projects for banks, restaurants, sales centres, Healthcare clinics, hotels, and law
firms across Dubai. Accountable on-site coordination and supervision of electrical systems design, install, and testing
for all construction projects. Facilitated contract negotiations with vendors and suppliers, preparing technical appraisals
to close on best price. Continuously reviewed scope of work during projects to ensure adherence to IFC drawings, project
specifications, and compliance to HSE requirements

ELECTRICAL ENGINEER/ PROJECT OPERATION EXECUTIVE في al waha contracting and trading wll
  • قطر - الدوحة
  • يونيو 2011 إلى يناير 2013

• Worked as Electrical Engineer in the Project RPS MAITHER PIPELINE WORK&MOI HEADQUATERS
• Responsibilities included Operation and maintenance of 110KV SUBSTATION, HT/LT Machines, VFD, PID Controllers, Protective relays, OCB’S, ACB’S, SF6, VCB’S, breaker, HV/LV machines, chillers and troubleshooting faults with the help of electrical drawings.
• Supervised the Fire fighting installation.
• Conducted “Polarization Index Test” on MV Motors & Generators.
• Was also responsible for Coordinating design.
• Administered Chillers yard installation with help of drawings.
• Coordinated MEP work for high rise building in the project.
• Worked with the project consultant to conduct inspection of installed equipment’s/parts.
• Coordinated with procurement department and reviewed the electrical shop drawings (lighting, fire alarm, data system. telephone system).
• Monitored the progress of work comparing it with the project approved schedule and was responsible for ensuring completion of all documentation procedures.
• Worked as an active member of HSE committee, site divisional HSE Officer.
• Last done project high rise building project in QATAR.
• Was also responsible for preparing monthly invoice for the company.
• Worked as the supporting officer for kharamma (QATAR GOV ELECTRICITY) in commissioning of the pumping station of the project.

electrical engineer في apollo ltd
  • الهند - اندور
  • أغسطس 2010 إلى يونيو 2011

• Was part of the team that designed electrical systems
• Was involved in preparing layouts of lighting, power, telecommunication, public address system, fire alarm and security.
• Job responsibilities also included drawing single line diagrams and inspecting electrical elements and were involved in cost estimation and procurement process.
• Maintaining & updating catalogues & Price lists.
- Initial processing of tender documents.
- Stamping of Job Number.
- Evaluating technical and commercial specifications and makes of equipment.
- Studying the drawings.
- Following up with vendors for quotation.
Preparing handing over documents for opening meeting.
- Procuring material as per basic rate along with Purchase department.
- Checking mails / tender & preparing extra item costing / variation statements.
- Preparing Closing Meeting Report after getting details from various departments & attending the meeting.
- Following up with account department for EMD return

الخلفية التعليمية

ماجستير, MBA
  • في University of Wollongong in Dubai
  • أغسطس 2018
دبلوم, Management
  • في Indira Gandhi National Open University
  • نوفمبر 2012
بكالوريوس, electrical& electronics
  • في nss college of engineering
  • يونيو 2010

Specialties & Skills

Site Supervision
Project Coordination
MS Project
Project Management
Cost Control
electrical cadd
PLC SCADA
MS OFFICE
Cost estimation

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
العربية
مبتدئ
التاميلية
متوسط

العضويات

TARKHEES-GOVERNMENT OF DUBAI
  • YELLOW CARD (MEP)
  • July 2017
society of Engineer UAE
  • Electrical Engineer
  • November 2017

التدريب و الشهادات

electrical cad (الشهادة)
تاريخ الدورة:
July 2010
صالحة لغاية:
September 2010