Engineer-Design
Kuwait Oil Company (KOC)
Total years of experience :18 years, 2 Months
(Seconded by Finesco International Gen. Trad. & Contr. Co. W.L.L, Kuwait)
Replacement & Upgradation of Pipeline Network in Burgan KOC field-FEED - Low Pressure Gas, High Pressure Rich Gas, High Pressure Lean Gas & Condensate Pipeline Network approx. 400 Kms Piggable Pipelines.
Responsible for developing / reviewing FEED, Engineering calculations, Technical Specifications, Stress Analysis, Material Requisitions, Supports for Contract Action & Technical Bid evaluation for Projects.
Monitoring, Review and Coordinating, activities of the EPC Contractor in Detailed Engineering and Technical Support to Construction Team of various Detail Engineering / Execution Projects.
Leads the execution of piping/pipeline engineering activities and Stress Analysis for special projects of the Company that initially requires the utilization of in-house resources.
(Seconded by Almeer Technical Services Company Co. W.L.L, Kuwait)
Responsible for developing / reviewing FEED, Engineering calculations, Technical Specifications, Stress Analysis, Material Requisitions, Supports for Contract Action & Technical Bid evaluation for various Projects.
Monitoring, Review and Coordinating, activities of the EPC Contractor in Detailed Engineering and Technical Support to Construction Team of various Detail Engineering / Execution Projects.
(Seconded by Worley Parsons, Oman)
Budour Integrated Oil and Gas Development (BIP) FEED Project: The Budour gas fields and the Budour-NE oil fields are located in South Oman, in the Greater Birba area.
Yibal Khuff Sudair Integrated (YKP) FEED Project: The Yibal fields is located in South-West of Muscat, Oman.
Responsible Pipeline Engineer performing Engineering Calculations, Technical Specification & Reports & Stress Analyst for Pipelines (CS & GRE) and various Oil, Gas & Water Flowlines.
Review of Pipeline Route and associated drawings, Vendor Documents and performs Technical Bid Evaluation & Analysis.
(Seconded through Worley Parsons, Oman)
Abu Tubul (ABB) Block 60 Export & Gathering Systems (Well Field Development Project):
Responsible Pipeline Engineer & Stress Analyst for Detailed Design & Engineering of 16” Export & 8” Condensate pipelines of (Approx.80Kms.) and DSS Flowlines 4”, 6” & 8” at Gathering System at ABB Block 60 for 60 Nos. of Wells
Wellhead hook-up & Flowlines Projects - Various Locations:
Responsible Pipeline Engineer for Detailed Design & Engineering of Various Pipelines & Flowlines 4” & 6” (Design Pressure 120 Barg.) from Wellheads to Remote Manifold Station & 6” & 8” DSS Gathering System & 16” CS Export Pipelines.
•Sakhiya-18, 21 & Alnoor-36 Wellhead hookup and Flowlines Project.
•Sarmad-1, 3 & 4 Wellhead hook-up and Flowlines Project.
•RTQ Ghanuq ARJEF Gross Header Project
•Thamoud Al Dhabi Production header replacement project.
Performed stress analysis using CAESAR II software for various Flowlines and pipelines in Oman Oil project (both CS and DSS pipelines) and GRE Flowlines for PDO - Greater Birba projects. Worked on TBA, Vendor documents / drawings reviews.
in Detailed Design and Engineering of Oil & Gas Pipelines, Refinery and Petrochemicals Facilities. Performing the Pipeline Engineering activities and leading the stress analysis team to perform Flexibility and thermal analysis for Selected Piping & Pipeline system using CAESAR II. Involvement in various projects HAZOP Meetings / presentation and Internal company technical seminars & discussions.
Worked as a Project Lead (Design) for the Various Projects & Clients in Kuwait.
Client : Kuwait Oil Company (KOC) - KUWAIT
Installation of Multicyclone Scrubbers and Condensate filters in West Kuwait.
New 16” Transit Pipeline 21 Kms from Abdali Main point to Abdali Mid-Point, Kuwait.
Dharif Water Injection Pilot Plant, West Kuwait.
Installation & Replacement of 7 Crude Transit Lines network in South East Kuwait Areas. - New Effluent Water Transfer Pipelines from GC's-17, 27 & 28 to MWIP and GC-28 EWTS and Tankage Up gradation -WEST KUWAIT
Replacement of 16” Crude Transit Line (13.5 Kms) from GC-09 to CMM.
30” High Pressure Gas Transmission line from BS-140 to GCMB Kuwait.
Installation of New Air Assisted Flare at GC’s 17, 27, 28 & BS-170 and Installation of Liquid Separator on 24 WK Export Gas Line.
Improvement of ESDV System in East Kuwait in GC`s 1, 2, 9, 10, 11, 19, 20 & 22.
Installation of new 12” High Pressure gas line from GC-19 to Manifold-K.
Upgrading of Low Pressure Gas network for 5 GC’s & 5 M/F’s in SEK.
Fuel Gas pipeline (18 Kms) from Maqwa Manifold "A" to Shuwaikh Power Station.
Flow lines and Pipeline works for EPF Projects of 50MBOPD Capacity of North Kuwait 16” Gas Line and 10” Crude Line
Marrat Water Flood Pilot Plant - Kuwait
Client : Joint Operations KJO
Bachelors of Engineering in Mechanical Engineering. In-House Paper Presentation in Use of turbocharger in automobiles at University. In-House Presentation on Types of Valve used in Petroleum Industries and Refinery