Production & Technical Manager at Markhiya Group
  • Saudi Arabia - Dammam
  • My current job since November 2017

Management and coordination for the production and installation of interior finishing systems.
Main accomplishments:
• Reduced the production cost by 20% by managing time, materials, and workers using an automated application I developed.
• Introduced new design options and products and producing fully detailed A-cad files.
• Providing the technical support for all sales representatives with in the Q.I.T.CO family.
Projects accomplished:
• Jarir Complex - Dammam Port.
• Labor Camp - Royal Commission for Jubail.
• Dr. Salman Al-Habib Hospital - Khobar.

Site Manager at Markhiya Holding Company-Q.C.C.(Qatar Contracting Co.)
  • Saudi Arabia - Dammam
  • December 2014 to April 2019

Description: construction of industrial projects:
• Q-Metal: is a factory with an area of 15000m2 for producing metal profiles consists of two production areas an open storage area and an administration building.
• QDMI: is a factory with an area of 17300m2 for roll forming production it has one production areas with an indoor storage area and an administration building.
Accomplishments:
• Finished the Q-Metal project within the time frame given and a cut down of 25% on the total cost by only using some subcontractors with application only contracts.
• Procurement of all materials used within the project to make sure of the specifications and quality to be within the approved range and the given budget.
• Made all the needed quantity surveys in actual after finishing and on A-cad before starting with a 95% accuracy rate.
• Developed an Excel application to manage and watch over the payments and cash flow throw out the whole timeline of the project.
• Developed an Excel application to plan the budget and time frame for the upcoming QDMI project with changes in the job laying to reduce the overall timeline needed.
• Computerizing all project documents such as:
o accomplishment notes
o Petty cash payments
o Materials used, ….etc.

Site Manager at Dew Point Contracting Co.
  • Saudi Arabia - Jizan
  • September 2013 to December 2014

Description: the project is a full water pumping system that contains:
• 13 pumping stations
• 11 water tanks
Connected together to get water to the mountainous area of Fifa in the southern part of the Kingdom of Saudi Arabia.

Accomplishments:
• Finished five of the 13 pumping station that was available within the given time by producing the raw materials and framework at one location and distributing according to a timeline application developed using Excel.
• Computerizing all project documents using Excel such as:
o accomplishment notes
o Petty cash payments
o Materials used, ….etc.

civil engineer at Marwan A. Alkurdi & Partners Co.
  • Jordan - Amman
  • February 2013 to May 2013

Description: the work consists of the construction of five overpasses and four underpasses.


Accomplishments:
• Prepared the official paperwork and accompanied letters regarding the stopping of the project because of a funding problem.
• Preparing a plan to carry out the finalization of all started jobs in the time frame given before submitting the final bill of quantity.
• Preparing the final quantity survey and the accompanying bill of quantity for all finished jobs.
• Computerizing all project documents using Excel such as:
o accomplishment notes
o Petty cash payments
o Materials used, ….etc.

Civil Engineer at Marwan A. Alkurdi & Partners Co.
  • Jordan - Karak
  • September 2012 to February 2013

Description: The project is a bridge contains a system with eleven 34.9 meter precast, pre-stressed girders held by four piers and two abutments.

Accomplishments:
• Prepared all monthly bills of quantity based on the accomplishment letters and the consultant notes in the project.
• Preparing the road cross section drawings using the surveyor elevations in actual via A-cad and calculating the needed quantities for each layer.
• Computerizing all project documents using Excel such as:
o accomplishment notes
o Petty cash payments
o Materials used, ….etc.
• Made routine checkups on all surveying, and construction jobs with the consultant to see the overall accomplishment in comparison to the planned timeline.
• Prepared the official paperwork and accompanied letters regarding the stopping of the project because of a funding problem.
• Preparing a plan to carry out the finalization of all started jobs in the time frame given before submitting the final bill of quantity.
• Preparing the final quantity survey and the accompanying bill of quantity for all finished jobs.

Education

Bachelor's degree, Civil Engineering
  • at Mutah University
  • August 2012

Took courses in: o Bridge Engineering. o Steel Section Calculations. o Application Programming for Engineering.

Specialties & Skills

On Site
Quantity Surveying
3D Design
Microsoft Office
AUTO CAD
DOCUMENT CONTROL
DRAWING
SURVEYING
TECHNICAL SUPPORT
TIME MANAGEMENT
TRAINING
حساب كميات
preparing monthly invoice

Languages

Arabic
Expert
English
Expert

Memberships

نقابة المهندسين الأردنين
  • نقابة المهندسين الأردنين
  • September 2012