Sr. Piping Designer
Al Firdous
Total years of experience :38 years, 5 Months
✓I have a total experience (Drawing checking, Designing, Modeling, Drafting) of 28+ yrs. in Offshore & Onshore piping systems. I am capable for Preparation of Plot plan, Equipment Layout, Piping G A DPreparation of equipment nozzle orientation that satisfies all process, utility and instrument requirements, Preparation of Bill of Materials. Preliminary Piping study, 3D modeling on PDMS, Preparation for meets the schedule for Client/Internal model review, Supporting Arrangement according to support standard, Extraction of Isometrics, Extraction of General arrangement.
✓ Involved in designing drawing and 3D modeling of Skid GAD from P&ID and PFD, Such as Separator, Cyclone Separator, Degassing Boot, K O D, Heater Treater, Glycol Dehydration Unit and Routing - Process, Utility & Flare lines etc.
✓ Site visit and Tie-in feasibility studies
✓ Piping drawings for Manufacturing Chemical Process Instruments, Valves, Level Gauges, Level Switches, Level Transmitters, for Petrochemical Industries
✓ Creating drawings for Tank, Vessels, Nozzle orientation, Chemical Process Instruments, etc.
●Involved in designing, Checking and drawing the Piping General arrangement Drawings from P&ID, PFD and layout, Review preparation and updating of Plot Plans/Equipments GA’s/Piping GA’s/Isometries, Nozzle orientation and Supports, Bill of Materials, etc.
●Prepared Shop drawing for construction based on Tender projects and IFC drawings as per site condition and modified the drawing as per comments from Consultants /Clients/ Project Engineers.
●Preparing As-built drawings after the completion of Projects
●Team Management: Efficiently Handled & Executed Various projects with a team of 12 Designers and Draftsmen in allocated time.
Gastech Process Engineering (India) Pvt. Ltd., Fraidabad Dec 2008-June 2011
(100% Subsidiary by Gastech Engineering Corporation, U S A)
Drafting Engineer
• Involved in designing drawing and 3D modeling of Skid GAD from P&ID, Routing - Process, Utility & Flare lines etc.
• Preparing plot plan, conducting preliminary piping study, equipment layout, preparation of general arrangement drawings, supporting arrangement, preparation of isometrics and Bill of Materials.
• Preparing Special Piping Supports for Oil & Gas related equipment such as Separator, Degassing Boot, K O D, Heater treater etc., for Offshore and Onshore.
Electrowatt Engineering, Al-Hamarya, Oman Oct 2007 - Oct 2008
Senior Piping Designer
• Involved in designing and drawing the Piping General arrangement Drawings from PEFS (P&ID) and layout, Review preparation and updating of Plot Plans/Equipments GA's/Piping GA's/Isometries, Nozzle orientation and Supports, Bill of Materials, etc.
Arabian Industries LLC, Sohar Industrial Area, Sultanate of Oman Mar 2007 - Sept 2007
Piping Designer
• Associated with the Design Unit and involved in designing isometric & spool drawings for Plant related project for Sohar Refinery Company (SRC), Oman Methanol Company (OMC), Sohar International Urea & Chemical Industries (SIUCI), etc.
• Verified the drawings of isometric/ spool/ general arrangement/ piping layout/ plot plan and equipment layout and co-ordinated with the Designers & Draftsman.
Consolidated Contractors Company (CCC), Manama, Kingdom of Bahrain Apr 2005 - Apr 2006
Senior Designer
• Involved in the construction of a new plant for Low Sulphur Diesel Production Plant (LSDPP) for Bahrain Petroleum Company (BAPCO) & The Consultant Japan Gas Corporation (JGC)
• Collaborated with the Engineering Group, generated isometric drawings from IDF file through spoolgen and Taliso, and detailed isometric and spool drawings.
Bilt Middle East, Dubai UAE Oct 2004 - Mar 2005
CAD Draughtsman
• Prepared Shop drawing for construction based on Tender and Design drawings as per site condition and modified the drawing as per comments from Consultants / Project Engineers.
• Coordinated Plumbing drawing with HVAC and Electrical Section for revision based on site condition.
• Prepared Fire fighting drawings based on drawings received from NAFFCO.
• Developed as-built drawing for final submission using AutoCAD 2005 for submitting to the Consultant/Client.
Al Huda Engineering Works, Doha-Qatar Dec 2001 - Jun 2004
CAD Draughtsman
• Prepared shop drawings from the construction drawings and obtained approval from proponent consultant, including MEP drawings.
• Prepared As-built drawings using AutoCAD 2000, 2002 & 2004 after the completion of projects - Khalifa Stadium, Sports Academy and Associated Sports Leisure Facilities
Aramco (Saudi Arabian Oil Company), Kingdom of Saudi Arabia Jan 1993 - Jun 2001
CAD Draughtsman/CADD Operator
• Associated with the Northern Area Producing Engineering Department / Saudi Aramco and involved in recording Job Log Engineering Work Orders (EWO) related to projects, originated by the proponent organizations.
• Gathered relevant reference drawing from Technical Library and Saudi Aramco Drawing Management System.
• Visited project regularly and involved in Tie-in feasibility studies.
• Cadding and updating of Equipment GA's / Piping GA's / Isometrics, supports, Bill of Materials.
• Worked with Saudi Aramco Drawing Management System and coordinated with the Network Administrator for Drawing Submittal & Cancellation, Issue revision numbers/ transferring electronic files and scanning certified drawings and Mylar drawings for DMS.
• Conducted field survey and reflected "AS-BUILT" conditions to existing reference drawing vectoring and edited Raster drawing such PIDs, ILDs, PFDs, VoDs etc. to Saudi Aramco CADD System using Intergraph Microstation and I/RAS B software and Material selection including stock numbers.
Earlier Experience
Piping drawings for Manufacturing Chemical Process Instruments, Valves, Level Gauges, Level Switches, Level Transmitters, for Petrochemical Industries
Creating drawings for Tank, Vessels, Nozzle orientation, and Chemical Process instruments