Construction Manager
Allied Vision Electromechanical Works LLC
Total years of experience :4 years, 9 Months
REPDO Round2 Jeddah 300 MWAC solar project, located in the South of Jeddah / KSA.
Handled (Construction / QC & QA / Materials) for Solar Projects MW Scale.
Worked on the budget and managed financial matters of the project.
Led a team of 4 engineers and 45 labors and supervisors .
REPDO Round2 Jeddah 300 MWAC solar project, located in South of Jeddah / KSA.
Baynouna 200 MW\AC solar energy project located in Amman / Jordan .
Checked the activities and materials in the project & made sure it’s according to the drawings & the standards.
worked as the owner consultant in 1 MW Photovoltaic Power Plant Al-Saloon Al-Akhdar Sweets Located in Al Mafraq / Jordan.
50MW Photovoltaic Power Plant - Al-Mafraq / Jordan
Doing all of the tests for the cables and joints ( megaring / continuity )
Pulling the (MV / LV / DC ) Underground and Air cables.
Reading the drawings & tables and make sure that all of the connections is according to the drawings.
Connect the 4MW power stations the control and power cables.
Working with the punch list and all of the finishing of the project.
Design and Installation of Solar systems (PV Systems)
Ensuring the efficiency of the solar system
Maintenance for the Generation Units
i worked In Nepco In the substation
هندسة مختصة بتعلم كيفية توليد الكهرباء من خلال محطات التوليد ونقلها خلال محطات التحويل وأبراج نقل الكهرباء(الضغط العالي), وتوزيعها على المحطات الفرعية ومن ثم إلى المنازل والمصانع والأحمال بمختلف أنواعها وصيانة المعدات والإلات وتشغيلها