SENIOR SURVEYING MANAGER
HAMZA ASSOCIATES
مجموع سنوات الخبرة :23 years, 7 أشهر
"FROM february2013 TILL NOW"
COMPANY:HAMZA ASSOCIATES
Position:- SENIOR SURVEYING MANAGER
PROJECT: - Upgrading of Cairo / Alexandria/Matrouh desert Road Freeway Standard Stage 1
• Check the data and drawing before starting.
• Making profiles and Cross-section for the road and also profile for water &sewar&storm eta.
• Making shop Drawing.
• Preparing progress reports on the weekly and monthly basis and submitting it to the owner
"FROM OCTOBER 2010 TILL february2013 "
COMPANY:-MZECH "Egyptian CONSULTANT HOUSE
Position: SENIOR SURVEYING MANAGER
Duties and Responsibilities: • Checking out all traverse points and control points of Allegria project ( 1200 villas)
• Managing a team of surveying engineers
• Reviewing all quantities of earth works in contractors interim payments
• Making as-built for all activities (plot area - set back - fences - utilities - ..etc) in Allegria projects.
• Coordinating with other subcontractors working onsite such as roads works, infrastructure works and electrical works)
• Attending weekly meeting with owner to discuss the executed and the planned weekly progress of works
• Preparing progress reports on the weekly and monthly basis and submitting it to the owner
"FROM JUNE 2007 TILL JUNE 2010"
COMPANY: - Al-Rajhi Construction L.L.C. (Dubai)
Position: - SURVEY MANAGAR
• Coaching the surveyor's team on to accomplish the Project successfully according to
The specifications &time.
• Check the data and drawing before starting.
• Management the equipment of instruments each surveyor.
• Make filling list of instrument with the certificate of calibration.
• And also making help for each department in construction.
• Calculation CUT and Fill Earth Work
• Making profiles and Cross-section for the road and also profile for water &sewar&storm eta.
• Making shop Drawing.
"FROM JUNE 2006 JUNE 2007 "
COMPANY: - SAMSUNG CONST.
Position: - Surveying Manger (Head of the Surveying Department)
PROJECT: - AUC in Egypt.
Estimated cost: - $400 million USD.
Responsibilities:-
• Check the Control point of the Project,
• Making many groups each group contains from one engineer and four surveyors.
• Making up date for drawing with the engineer and surveyors.
• Make filling list of instrument with the certificate of calibration.
• Coaching the surveyor's team on to accomplish the Project successfully according to the specification, on time.
• Making setting out and leveling for OGL, before starting excavation.
• Contact with consultant.
• Leading construction team through managing site activities. Coordinate various projects resources (Manpower, material, sub-contractors and Suppliers), to accomplish the job on time.
• Making as built and drawing after as built.
• Marking and setting out location of Bookwork.
• Check the Plaster &Ceramic &tiles and Painting.
• Making bending list for steel fixer
"FROM May 2004 to JUNE 2006 "
COMPANY: - M. A. Karafi & Sons (West Africa- GAMBIA)
Position: Chief Surveying Engineer
PROJECT: - Sheraton Gambia hotel
Estimated cost: - $60 million USD.
Joined the project as an acting Site agent and achieved remarkable improvements in production, quality, and safety, leading a staff of 3 engineers, 5 formans, and total of 320 labuors.
Responsibilities:-
• Check the Control point of Project,
• Making many groups each group contains from one engineer and four surveyors.
• Making up date for drawing with the engineer and surveyors.
• Make filling list of instrument with the certificate of calibration.
• Making as built and drawing after as built.
• Marking and setting out location of Bookwork.
• Check the Plaster &Ceramic &tiles and Painting.
• Making bending list for steel fixer
• Coaching the surveyor's team on to accomplish the Project successfully according to the specification, on time.
• Leading construction team through managing site activities. Coordinate
Various project resources (Manpower, material, sub-contractors and
Suppliers), to accomplish the job on time.
"FROM May 2001 to May 2004 "
COMPANY: - Hyundai Engineering Construction co. Ltd
Position: Chief Surveying Engineer
PROJECT: - Four seasons Hotel at Nile Plaza
Estimated cost: - $550 million USD.
Responsibilities:-
• Check the Control point of Project,
• Making many groups each group contains from one engineer and four surveyors.
• Making up date for drawing with the engineer and surveyors.
• Make filling list of instrument with the certificate of calibration.
• Coaching the surveyor's team on to accomplish the Project successfully according to the specification, on time.
• Making setting out and leveling for ogl. Before starting excavation.
• Contact with consultant.
• Marking all parathion above slab that is for finishing.
"FROM June 1997 to May 2001 "
COMPANY: - Arabian International Company (AIC)
Position: - Senior Surveying Engineer
PROJECTS: -
• Raids tow power Station in Tunisia
• Power Station Boot 3&4 side Krir with Bechtel Egypt
• Sol Elite Hotel Sharm El-sheikh. Egypt
• Extension of Ghazala hotel sharm El-sheikh. Egypt
• Staff House sol Elite sharm El-sheikh. Egypt
• Staff House Holiday in sharm El-sheikh. Egypt
Responsibilities:-
• Making up date for drawing with the engineer and surveyors.
• Check the Control point of Project
• Making many groups each group contains from one engineer and four surveyors.
• Make filling list of instrument with the certificate of calibration.
• Coaching the surveyor's team on to accomplish the Project successfully according to the specification, on time.
• Making setting out and leveling for ogl. Before starting excavation.
• Contact with consultant.
• Marking all partisan above slab that is for finishing
• Inspection and supervise concrete works on site.
Following up construction activities. (*) updating schedule and monitoring the
Progress. (*) Managing project resources on/off site. (*) review and modify
• Concrete mix component. (*) Operate fresh concrete plant and site tests
• Making setting out and leveling for ogl. Before starting excavation.
• Contact with consultant.
• Marking all partisan above slab that is for finishing
• Making as built and drawing after as built.
• Marking and setting out location of Bookwork.
• Check the Plaster &Ceramic &tiles and Painting.
• Making bending list for steel fixer
• Inspection and supervise concrete works on site.
Following up construction activities. (*) updating schedule and monitoring the
Progress. (*) Managing project resources on/off site. (*) review and modify
Concrete mix component. (*) Operate fresh concrete plant and site tests.
"FROM June 1995 to May 1997 "
COMPANY: - Siac Company
Position: - Chief Surveying Engineer
PROJECT: -
• Under Ground Metro Khalafawy Station.
"FROM february2013 TILL NOW"
COMPANY:HAMZA ASSOCIATES
Position:- SENIOR SURVEYING MANAGER
PROJECT: - Upgrading of Cairo / Alexandria/Matrouh desert Road Freeway Standard Stage 1
• Making profiles and Cross-section for the road and also profile for water &sewar&storm eta.
• Making shop Drawing.
• Preparing progress reports on the weekly and monthly basis and submitting it to the owner
"FROM OCTOBER 2010 TILL february2013 "
COMPANY:-MZECH "Egyptian CONSULTANT HOUSE
Position: SENIOR SURVEYING MANAGER
• Coaching the surveyor's team on to accomplish the Project successfully according to
The specifications &time.
• Check the data and drawing before starting.
• Management the equipment of instruments each surveyor.
• Make filling list of instrument with the certificate of calibration.
• And also making help for each department in construction.
• Calculation CUT and Fill Earth Work
• Making profiles and Cross-section for the road and also profile for water &sewar&storm eta.
• Making shop Drawing.
"FROM May 2001 to May 2004 "
COMPANY: - Hyundai Engineering Construction co. Ltd
Position: Chief Surveying Engineer
PROJECT: - Four seasons Hotel at Nile Plaza
Estimated cost: - $550 million USD.
Responsibilities:-
• Check the Control point of Project,
• Making many groups each group contains from one engineer and four surveyors.
• Making up date for drawing with the engineer and surveyors.
• Make filling list of instrument with the certificate of calibration.
• Coaching the surveyor's team on to accomplish the Project successfully according to the specification, on time.
• Making setting out and leveling for ogl. Before starting excavation.
• Contact with consultant.
• Marking all parathion above slab that is for finishing.
"FROM June 1997 to May 2001 "
COMPANY: - Arabian International Company (AIC)
Position: - Senior Surveying Engineer
PROJECTS: -
• Raids tow power Station in Tunisia
• Power Station Boot 3&4 side Krir with Bechtel Egypt
• Sol Elite Hotel Sharm El-sheikh. Egypt
• Extension of Ghazala hotel sharm El-sheikh. Egypt
• Staff House sol Elite sharm El-sheikh. Egypt
• Staff House Holiday in sharm El-sheikh. Egypt
Responsibilities:-
• Making up date for drawing with the engineer and surveyors.
• Check the Control point of Project
• Making many groups each group contains from one engineer and four surveyors.
• Make filling list of instrument with the certificate of calibration.
• Coaching the surveyor's team on to accomplish the Project successfully according to the specification, on time.
• Making setting out and leveling for ogl. Before starting excavation.
• Contact with consultant.
• Marking all partisan above slab that is for finishing
• Inspection and supervise concrete works on site.
Following up construction activities. (*) updating schedule and monitoring the
Progress. (*) Managing project resources on/off site. (*) review and modify
• Concrete mix component. (*) Operate fresh concrete plant and site tests
• Making setting out and leveling for ogl. Before starting excavation.
• Contact with consultant.
• Marking all partisan above slab that is for finishing
• Making as built and drawing after as built.
• Marking and setting out location of Bookwork.
• Check the Plaster &Ceramic &tiles and Painting.
• Making bending list for steel fixer
• Inspection and supervise concrete works on site.
Following up construction activities. (*) updating schedule and monitoring the
Progress. (*) Managing project resources on/off site. (*) review and modify
Concrete mix component. (*) Operate fresh concrete plant and site tests.
"FROM June 1995 to May 1997 "
COMPANY: - Siac Company
Position: - Chief Surveying Engineer
PROJECT: -
• Under Ground Metro Khalafawy Station.
• Arco-Steel built-in Factory in Sadat City.
• Kuwait Tower Group in Zamalek.
• Egyption Central Bank in Middle of City.
"FROM April 1991 to June 1995 "
COMPANY: - Megicon Company
Position: - Survey Engineer
PROJECT: -
• Sub station in Tebben.
• Sub station in Sharkia.
• Power - Station in Arish.
• Repair of High Dam gates.
"FROM June 1988 to Jan. 1990 "
Civil Engineer in Cairo City Council.
B.SC. in Civil Engineering Zagazig University May 1987. Faculty of Engineer in Shoubra.