محمود حسان, senior cost control engineer

محمود حسان

senior cost control engineer

SODIC

البلد
مصر - القاهرة
التعليم
ماجستير, MBA
الخبرات
19 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 5 أشهر

senior cost control engineer في SODIC
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يونيو 2016

-Undertake cost control activities for the project to ensure costs are within the project budget.
- Ensure accurate, reliable and complete project cost control systems are implemented for the budgeting, tracking, change control and forecasting of all project costs
- Set-up work breakdown and project coding structures
- Analyse variance in cost and recommend corrective actions
-prepare documentation to support scope changes in relation to budget# estimate and forecast
-prepare monthly cost report which includes actual and forecast costs for the project based on information supplied by the PMs .
-provide accurate and time "financial cost status reports, including maintaining cash

principal cost engineer (Electrical) في ECG Engineering Consultants Group S.A
  • مصر - القاهرة
  • نوفمبر 2009 إلى مايو 2016

• Prepares the preliminary cost estimates for the projects cost during the Proposal Phase as requested by the Proposal Manager.
• Prepares the preliminary cost estimates for the project during the Bases of Design (BOD) Phase, if requested, based on the released design and outline specifications. Presents/discusses these preliminary cost estimates with the Project Manager/Engineer for review before submitting to the Client. Answers the Client questions on these estimates and prepares the necessary corrections, if any, to suite Client’s budget.
• Prepares the B.O.Qs and the final cost estimates for the project, at the end of the Engineering Production Phase, based on quantities calculated by the Quantity Surveyor(s) of the Technical Disciplines from the construction drawings.
• Maintains current records of rates and prices of materials, labor and equipment by using the ECG computerized database.
• Prepares the comparison tables of tenderers prices during the tenders Evaluation Phase.
 Participated in the following projects:

- ABC Headquarters building
- Hotel and mall for Dar Al-Eshara
- EBC Egyptian banks co. Head office
- Elrehab shopping center - 9th & 10th zone
- King abdullah economic city- infrastructure TH1 & TH4 project
- Firefighting and fire alarm systems development for electrical
- Renovation and refurnishing Unileverr factory 6th October, Egypt
- Metropolitan international school-(phase-1)
- Mars Egypt site development project (SDP)
- Cairo international airport development project- tb2
- Etisalat Misr headquarters at smart village
- Medical Union Pharmaceuticals
- Administration Building # MB3
- Seasonal Flight Terminal building
- P&G Contractor Building-Building 94
- CIAF Office Building
- Childeren Cancer Hospital section at Al helal hospital in Tanta
- Cairo International airport development Project -TB2
- Egyptair aircraft maintenance facility at borg elarab airport
- Credit Agricole Bank
- Domiatec office building
- Chilled water central plant- Smart Village
- El-sewedy cables administration building
- Mantrac offices at ecg building - smart village
- Administration Building # MB4 &MB1
- Adminstration Building # MB5&6
- Cordoba Hills Aleppo- Syria
- New Giza screen building
- Barwa New Cairo
- National Bank of egypt (Garden city-Zamalek- Makram Ebaid Tower- 6th Of October -Alazhar- Elhegaz- ALobour- Ramses- Sharm Elshekh- Makram Ebaid- Cairo Plaza- Shalaten- Shereif- Abassia- World Trad center) Branches
- Holdipharma in 6th of October city
- Lycee francais de Caire- Maadi
- Three stars hotel in new cairo
- Oriana villas phase 3
- Ministry of Finance - Regional Training Center
- Sodic Company Real Estate Development Eastown Square
- King AbdulAziz Airport
- Damac Villas
- New National Eye Hospital

Quantity surveyor and tech. office (Electrical ) Engineer في Modern Management Technology (MMT)
  • مصر - القاهرة
  • يونيو 2007 إلى نوفمبر 2009

A. Technical office Engineer From 1-6-2007 To 30-9-2007 & From 1-6-2008 Until 10-2009:
Duties and Responsibility
1. Preparing tender package for the projects..
2. preparing technical submittals for materials
3. Shop drawings revision.
4. assist in Value engineering .
6. Coordination with sub contractors.

Sample for studied projects
A) Tender Projects
1. Hilton Marsa Alam
2. Revira Touristic Village in Taba
3. Hilton Sharm Dreams
4. Cairo Airotel

B) projects under execution
1. Rainbow Resort in Sharm El shiekh
2. Revira Touristic Village in Taba
3. Nile Palm Tower in Giza

B. Site Eng.: Working as site engineer From October 2007 until 30-5-2008
Duties and Responsibility
1. Execution Follow up.
2. Consultant handing over.
3. Coordination with other contractors.
4. Preparing As built drawing.
5. Sub-Contractors follow up.
Executed projects
1. Hilton Marsa Alam. From October 2007 until June 2008 (Low voltage, Low current networks & Electrical works for Main BLDG.)

Electrical Engineer في DELTA CONTRACTORS
  • مصر - القاهرة
  • ديسمبر 2004 إلى مايو 2007

.
Work Scope includes:
A. QS & Technical office From 1-12-2004 To 31-8-2005

Sample for studied projects
A) Tender Projects
1. AUC in 5th Compound
2. Gezira Hotel
3. AMARANTEE _ NILE Hotel restoration and rebuilding
4. Magaweesh Village Development
5. Roman-Greek Museum in Alex.
B) Existing Projects
1. Golf Sinai Hotel
2. Cancer Hospital in Nasr City
3. Magaweesh Village Development

B. Site Eng.: Working as site engineer on:-
1. AMARANTEE _ NILE Hotel restoration and rebuilding project
2. Magaweesh Village Development (power, fire alarm networks and electrical works for new kitchen)

الخلفية التعليمية

ماجستير, MBA
  • في Arab Academy for Science, Technology & Maritime Transport
  • أغسطس 2021

current study

دبلوم,  PRMG 090 Certified cost consultant/ Certified cost Engineer (CCC/CCE)
  • في American university in Cairo (AUC)
  • يوليو 2012

Certified cost consultant/ Certified cost Engineer (CCC/CCE) consists of 7 sections as the following: SECTION 1—COST SECTION 2—COST ESTIMATING SECTION 3—PLANNING & SCHEDULING SECTION 4—PROGRESS & COST CONTROL SECTION 5—PROJECT MANAGEMENT SECTION 6—ECONOMIC ANALYSIS SECTION 7—STATISTICS, PROBABILITY, & RISK

دبلوم, Cost management
  • في ECG academy
  • نوفمبر 2011

Cost Management course is consists of 9 sections as the following: 1- Inflation Corporate Finance & Inflation Examples 2- Law No. (5) for the year 2005 3- Project Risk Management . 4- Time value of money 5- Cash flow Estimation and risk analysis 6- Financial options to real options 7- The Basics of Capital Budgeting Evaluating Cash flows. 8- Pre- Engineering and Initiatives. 9- Initiatives and Initiators

بكالوريوس, Electrical power Engineering
  • في Shubra Faculty of Engineering
  • مايو 2004

Specialties & Skills

AutoCAD
Microsoft Office software & the Internet- Expert.
Autocad 2010

اللغات

الانجليزية
متوسط
العربية
متمرّس

العضويات

نقابة المهندسين المصريين
  • 7930/52
  • May 2004

التدريب و الشهادات

Training of Trainers (Egyptian Democratic Institute) (تدريب)
معهد التدريب:
Egyptian Democratic Institute
تاريخ الدورة:
December 2013
المدة:
40 ساعة