Work Experience

Total years of experience :18 years, 5 Months

Project Interface manager at Asyad Internation Company co Ltd
  • Saudi Arabia - Dammam
  • My current job since August 2021

Project Name : Saudi Aramco, Rastunara Refinary. Emergency Steam turbine replacement ( BI-10-00163)

Understand the project requirements and scope executing to meet the management goal with client
satisfaction within agreed time limits.
• Ensure and execute the deliverables as per approved Quality and Safety plan.
• Involve the Project schedule and explain the important assumption & Constrains to Project stack
holders.
• Manage project coordination with ARAMCO PMTC/ Respective vendor and all concerned
authorities.
• Participate and leading weekly EPC, Procurement, and quality meetings as per the contractor
obligations,
• Ensure and monitor the proper communications with all the stakeholders’ requirements
• Taking necessary actions to meet project agreed deliverables.
• Involving scope changes and monitoring subsequent analysis.
• Involving commercial official negotiations with stake holders
• Coordinating, supervising with project team, vendors, manufacture, and suppliers frequently to meet
Project objective
• Secure and verify the available resources,
• Provide cost effective solution for design issues& review and check design drawing and Contracted
document.
• Ensuring project reports meets the contractual obligations,

Project lead Engineer / Project Manager(Aramco Approved) at Asyad International Co ltd
  • Saudi Arabia - Jizan
  • March 2019 to February 2021

Project Name : Saudi Aramco Jizan Refinery Emergency Substation # 452

the Project schedule and Explain the important assumption & Constrains to Project team
 Manage project coordination with ARAMCO PMTC/ Respective vendor and all concerned authorities.
 Prepare the Project schedule and Explain the important assumption & Constrains to Project team
 Prepare the Invoices a based on agreed Project Perspectives.
 Supervise the Testing and Commission team, Provide configuration input to testing Engineers.
 Implement the different vendors interfacing signals & Ensure the Compatible Date Communication Protocols
 Supervise & Given input for Energizations Packages & SPDT (Spare Parts Data Package)
 Coordinating and supervising the project team and ensure the work complies with project requirements.  Provide cost effective solution for design issues& review and check design drawing and Contracted document.
 Coordinate with respective Civil, Electrical, Instrument, Telecom & HVAC team to execution, material issues, drawing issues, testing of cables & equipment’s.  Execution & field technical issues resolving with discuss & coordination with Aramco PMTC team.
 Establish Method of statements, Technical Queries, Field change issues.  Check and approve composite drawings and Review Contractor’s qualification. Review and comments of site reports, respond to Contractor’s queries.  Review and Approve shop & as built drawings with project color coding notification respond to project manager memo and clarification.  Attend coordination meeting and issue monthly report & Monitoring and analyze project schedule & resources  Assist and approve the testing & commissioning and test results.  Assist to Supervise for MV, LV & control cable laying, route, trench excavation, testing & up to backfilling & termination activities.  Coordinate with safety team to getting Permit to work & to ensure site safety concerns to resolve to avoid any delay in construction activities.  Coordinate with design team to provide & get to Project team to received concerns drawing to carry out execution activities.  Coordinate with design team to resolve outstanding design issues of Lay out drawings, cable schedules, SLD, conduit & trenching layouts, equipment’s foundation drawings etc...  Assist to Prepare all the kind of test reports formats and Final Hand over documents

Electrical Engineer/ Incharge, QC Inspector (Aramco Approved) at POSCO E&C
  • Saudi Arabia - Jubail
  • December 2015 to February 2019

Project : Saudi Aramco Sulfur Rail Car Loading Facilities

Surveillance Inspection will be carried out on daily basis for ongoing activities work in all area at site to avoid reworks.
3
 Internal inspection will be carried out prior to offer client inspection for avoid any violation.
 Responsible to Submit Request for Inspections (RFIs) as per applicable ITP and Check list and test reports.
 Responsible to prepare & submit offered inspection test reports & respective activities checklist for costumer endorsement for acceptance.
 Coordination with subcontractor & Client to assure respective offered inspection acceptance with compliance of standard requirements.
 Responsible to inspect the ongoing site activities and material receiving inspections as per applicable customer requirements.
 Responsible to issue the INCRs if found any discrepancy as per applicable customer and applicable Standards requirements.
 Responsible to prepare all the inspection test results and maintain the quality relevant documents.
 Carried out Inspections of Underground & above ground cable routes as per approved drawings.
 Conduct inspection of cable pulling routes as per approved Schedules.
 Responsible to witness Continuity, IR& Hi-Pot test of LV & MV cables.
 Conducted inspection for LV, MV & HV cable Glanding, Termination, Splicing & testing. (Up to 33KV)
 Installation inspection and Solo Run Testing of LV and MV Motors.
 Installation inspections for the LV & MV Switchgears, MCCs, Panel Boards, Lighting Panels, Transformers and motors.
 Awareness of Electrical Hazardous area classification and responsible to conduct the installation and testing activities inspections in hazardous and nonhazardous location.
 Installation inspection of convenience outlets, welding receptacles, switches.
 Carry out Inspection of grounding cable laying, and cad welding activities.
 Conducted inspection of installation of grounding rods, grounding Bus-bars and concrete pits & testing activities.
 Carried out inspection of lighting System installation & testing.
 Carried out Inspection of HVAC related equipment’s Installation & testing (Chemical Filter Unit, Air Handling Unit, Exhaust fans, Bleed fans
 Carried out Inspection of Battery chargers, Battery systems and UPS system
 Carried out Installation Inspection of Lightning Protection system & testing.
 To ensure all work, tests and inspections undertaken by Contractor is in accordance with the Specifications/Contract Requirements and signs the relevant Test Certificates.
 Conduct in-process inspection for installation of MOV & testing.
 Responsible for the preparation for the Electrical Power Energization packages of respective system and maintain all the documents.
 Verify & closing MCC punch list with coordination of client.

Aisstant manager at Kotec automotives (P) Ltd
  • India - Chennai
  • January 2015 to December 2015

Understand the scope of work as per the approved WMS and Project charter.
* Prepare the purchase request based on approved project management plan.
* Co-ordinate with the customer and vendor for technical aspects.
* Manage and control procurement contract.
* Ensure the availability of resource and require resource.
* List out the activities of the project.
* Prepare the schedule as per project constraints and assumptions
* Monitoring the schedule variance and find the root cause and take corrective action.
* Prepare the change order according to site modification and additional scope requirement.
* Coordinating and supervising the project team and ensure the work complies with project
requirements.
* Provide cost effective solution for design issues& review and check design drawing and Contracted
document.
* Execution & field technical issues resolving with discuss & coordination with Contractor.
* Establish Method of statements, Technical Queries, Field change issues.
* Check and approve composite drawings and Review Contractor’s qualification.
Review and comments of site reports, respond to Contractor’s queries.
5
* Review and Approve shop & as built drawings with project color coding notification
respond to

Assistant Manager at Kotec Automotived (P) Ltd
  • India - Pune
  • June 2012 to August 2014

Understand the scope of work as per the approved WMS and Project charter.
* Prepare the purchase request based on approved project management plan.
* Co-ordinate with the customer and vendor for technical aspects.
* Manage and control procurement contract.
* Ensure the availability of resource and require resource.
* List out the activities of the project.
* Prepare the schedule as per project constraints and assumptions
* Monitoring the schedule variance and find the root cause and take corrective action.
* Prepare the change order according to site modification and additional scope requirement.
* Coordinating and supervising the project team and ensure the work complies with project
requirements.
* Provide cost effective solution for design issues& review and check design drawing and Contracted
document.
* Execution & field technical issues resolving with discuss & coordination with Contractor.
* Establish Method of statements, Technical Queries, Field change issues.
* Check and approve composite drawings and Review Contractor’s qualification.
Review and comments of site reports, respond to Contractor’s queries.
* Review and Approve shop & as built drawings with project color coding notification
respond to

Electrical Engineer at Dongyang Construction Pvt Ltd
  • India - Pune
  • September 2011 to April 2012

Identify the requirements as per approved plan
* Ensure the resource availability earlier then the schedule.
* Prepare all construction work related documents such as JSA- job safety Analysis.
* Prepare the Work method statement & procedure
* Prepare the sequence the of activities
* Manage and control all the Electrical Construction activities. Installation of Electrical equipment’s as
per approved IFC Drawings such as mentioned below
Generator circuit breaker
4.18. 6.6, 11, 13.8, 22, 33 KV switchgears
Generator step up transformers
All kind of instruments installation and testing works (PIT, LIT, FIT TIT&AIT)
Emergency diesel generator
Fire Alarm system
Lighting System
* Manage and control of all cable pulling activities as per standard and project approved
specification.
HV cables, MV cables LV cables and Control Cables
All the kind of instrument cables which are operate 24V (4mA-20mA)
Different kinds of Valves such us Control valves, shunt down valves.

Electrical QC Inspector at samchang Electro Mechanical Company Ltd
  • United Arab Emirates - Abu Dhabi
  • June 2008 to August 2011

• Surveillance Inspection will be carried out on daily basis for ongoing activities work in all area at site to avoid reworks.
• Internal inspection will be carried out prior to offer client inspection for avoid any violation.
• Responsible to Submit Request for Inspections (RFIs) as per applicable ITP and Check list and test reports.
• Responsible to prepare & submit offered inspection test reports & respective activities checklist for contractor endorsement for acceptance.
• Coordination with contractor & Client to assure respective offered inspection acceptance with compliance of standard requirements.

Electrical Supervisor at Samchang Electro Mechanical Company Ltd
  • Kuwait - Al Ahmadi
  • April 2007 to May 2008

EPC : SK Construction & Engineering. AL- Ahmadi, Kuwait
Location : Al- Mangaf, Kuwait
Duties & Responsibilities
* Manage and control of Electrical activities.
* Installation of HSBT ( High Speed Bus Transfer )
* Installation of Cathodic protection for fuel oil tanks and underground gas pipes
* Laying of HV, LV & Control cables
* Installation of cable tray
* Cable termination of HV &LV switchgear
* Splicing of cable
* Earthing cable laying & Thermit welding
* MICS cables glanding & termination
* Coordination with various departments.
* Trouble shooting
* Analyzing faults
* Preparing As- build drawings
With M/s Tafe power source, Maraimalai nager, Chennai, Tamilnadu India

Electrical Supervisor at Tafe Power Source
  • India - Chennai
  • December 2004 to January 2007

* Prepare the monthly schedule for preventive maintenance.
* Manage and control of operation measurement device calibration.
* Participate the quality control plan.
* Maintain the down time of production.
* Prepare the daily activities list for the team members
* Reporting to management any unexpected issue happened and investigate
* Submit the improvement plan for approval for the management.
* Prepare the shutdown schedule.
* Ensure availability of spare for critical equipment’s.

Education

Bachelor's degree, Electrical and Electronics Engineering
  • at Sapthagiri College of Engineering
  • May 2015

Passed with First class

Diploma, Electrical and Electronics Engineering
  • at Laxmi Narayana Polytechnic College
  • May 2004

First class with Honors

Specialties & Skills

Quality
AutoCAD
MS Office tools
CABLING
GRAPHIC DESIGN
PROGRAMMING
PROJECT MANAGEMENT
SUPERVISORY SKILLS
CALIBRATION
OIL PAINTING

Languages

English
Expert
Hindi
Expert

Hobbies

  • Reading