Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mark Anthony Aceron, Qa/qc Electrical Engineer

Mark Anthony Aceron

Qa/qc Electrical Engineer·KCCEC

Kuwait

Bachelor's degree, Electrical Engineering

Work experience

Total years of experience: 19 years, 11 months

Qa/qc Electrical Engineer

June 2019 - Present

KCCEC

Al Ahmadi, Kuwait

June 2019 - Present

Company industry:
Construction & Building
Job role:
Quality Control

Lead QA/QC Engineer-South Harbour

March 2014 - June 2019

STFA

Al Ahmadi, Kuwait

March 2014 - June 2019

Lead a group of qa/qc engineer and inspector from different field (civil, electrical &
instrumentation and mechanical).
♦ Attend weekly construction walk-through and meeting with the client &
client representative.
♦ Monitoring of daily inspection schedule and result.
♦ Preparation and close-out of NCR issued internally and issued by the client
including preparation of internal observation and observation issued by the
client.
♦ Preparation of the area handed over to other discipline and preparation of
the weekly progress report.
♦ Review of material submittals (Material Approval Request) are as per project
technical specifications and comply with KOC standards prior to final submittal to the
client.
♦ Preparation of the required QA/QC documents to be submitted to the client’s
including inspection and test plan (ITP), checklist and test report form.
♦ Review of method statement submitted by construction team prior to submittal to
the consultant and client. Ensure that the methodology of works are applicable to the
work site condition and as per manufacturer’s instruction.
♦ Responsible for quality assurance/quality control work required by the project
technical specification, KOC standards and appropriate codes and standards.
♦ Prepare and conduct material inspection with the client (SSH) and KOC
representative for the final approval of the materials being used at site by the subcontractors.
♦ Daily coordination with the client’s representative and site engineer’s to ensure
that inspections are carried out and properly documented.
♦ Preparation of daily inspection schedule (DIS) for all discipline and preparation of
inspection results to be submitted to client’s (SSH/Flour/KOC).
♦ Generate daily inspection request (IR) and prepare the required checklist and
attached the approved drawing prior to inspection. And perform the variety of
inspections to ensure the client’s requirements are being achieved.
♦ Continually carry out daily monitoring and surveillance of works at site and ensure
the installations are as per approved drawings, complied with the project technical
specification and KOC standards.
♦ Provide support and advice to the construction personnel in relation to the project
quality plan, technical project specification and standards.
♦ Maintain good record keeping of documentation and latest revision of approved
drawings at site. Ensure that the drawing at site is the latest approved drawings.
♦ Monitoring of approved material of the consultant and client and implement the
necessary material inspection at site. Ensure that the material being used at site are
as per approved materials.

Company industry:
Construction & Building
Job role:
Quality Control

Lead QA/QC E&I Engineer

November 2012 - February 2014

Danway EME LLC.

Abu Dhabi, United Arab Emirates

November 2012 - February 2014

Company industry:
Construction & Building
Job role:
Quality Control

QA/QC E&I Engineer (QM Department)

June 2010 - June 2012

Hyundai Heavy Industries Co. LTD

Kuwait

June 2010 - June 2012

Project: Sabiya Combined Cycle Power Plant (CCGT)
(Joint Venture Project of HHI & GE)
Capacity: 2000 MW Power Plants (6 units of GTG and 3 units of STG)
Location: Sabiya, Kuwait
Date: June 20, 2010 - June 19, 2012
Position: QA/QC E&I Engineer (QM Department)
Scope of Work: Directly Reporting to E&I QM Manager
♦ Responsible for quality assurance/quality control work required by the project specification, MEW standards and appropriate electrical codes and standards.
♦ Conduct daily Inspection submitted by the subcontractor and maintain Control of test results and Records, and issue Non Conformance Report if necessary.
♦ Responsible for the field installation inspection and witness the electrical test conducted at site by the subcontractor with the presence of the client representative.
♦ Ensure electrical and instrumentation works were fully complied with the client MEW procedures and standards.
♦ Prepare all the Mechanical Completion Check Report (MCCR) and complete the required documents for the Turn Over Packages (TOP)
♦ Maintain the test records of preservation report of the electrical equipment tested and monitored at site.
♦ Supervise the quality of work activities of the subcontractor at site and attend the weekly meeting of the sub-contractor.
♦ Maintaining records and latest revision of drawings, specifications, and Standards, required for Quality Assurance, Quality Control and inspection.
♦ Control, management and execution of all specified inspection activities as per inspection, specification and codes, witness procedures and tests and interpret results accurately.

Company industry:
Construction & Building
Job role:
Quality Control

QA/QC Electrical Engineer

January 2010 - April 2010

SETE Energy

Jeddah, Saudi Arabia

January 2010 - April 2010

Date: Feb 2, 2010 - April 31, 2010
Position: QA/QC Electrical Engineer
Scope of Work: Directly Reporting to Electrical Manager & Project Manager
Duties and Responsibilities
♦ Prepare the required Inspection &Test Plan, Checklist, and Site pre-commissioning and commissioning form to be used at site as per project requirements and standards..
♦ Check the proper and safe operation of machines by evaluating the running conditions and troubleshoot system problems as they arise.
♦ Prepare the electrical test result conducted at site and ensure that all testing required by the client are carried out and performed.
♦ Act as a point of contact between the client Marafiq and the vendor concerning technical issues and interface with involved functions.
♦ Ensure all in-field activities are carried out safely complying with specification and standards sets by company environmental health & Safety (EHS) guidelines and procedures.
♦ Witness testing of Hi-pot testing of MV cable 4.16kV and prepares test results including punch listing and final test result.
♦ Conduct inspection of retro-fit 4.16KV switchgear and witness all the electrical test performed at site.
♦ Responsible for the final acceptance of UPS / DC charger and battery installed including battery test (Charge and discharge test) and prepare the test result with the vendor..
♦ Conduct inspection of cable tray installed, embedded and exposed conduit, lightning and grounding installation.
♦ Control, management and execution of specified inspection activities as per inspection, specification and codes, witness procedures and tests and interpret results accurately.
♦ Prepare method of statement and risk assessment of the electrical work to ensure the safety and the procedure were followed.

Company industry:
Construction & Building
Job role:
Quality Control

QA/QC Electrical Engineer (QM Department)

April 2008 - August 2009

Hyundai Heavy Industries Co. Ltd

Jubail, Saudi Arabia

April 2008 - August 2009

Capacity: 2750 MW Power Plants
Location: Al Jubail, Kingdom of Saudi Arabia
Date: April 6, 2008 - August 31, 2009
Position: QA/QC Electrical Engineer (QM Department)
Scope of Work: Directly Reporting to E&I QM Manager

Duties and Responsibilities
♦ Supervise the testing and inspection of all motors supplied at site and verify test result if the items are in good conditions.
♦ Act as a point of contact between client Tractebel and Site Technical Adviser of GE Infra Energy concerning technical issues and interface with all involved functions
♦ Witness testing of MV cable 4.16 to 13.8KV and EHV Cable 380KV and prepares test results including punch listing and final MCCR for acceptance.
♦ Conducted installation inspection of excitation/isolation transformer, AC/DC Reactor, Station Transformer (3.0 - 5.0MVA), Auxiliary and Unit Auxiliary (57-87 MVA) and Step-up Transformer (500 -820 MVA)
♦ Witness transformer testing. (Winding resistance test, turn-ratio check, phase relation check, oil, dielectric test, transformer leak test, bucholl's relay test and auxiliary device check)
♦ Responsible for the acceptance and installation inspection of 480V NSPB and 18kV Isolated Phase Bus duct (IPB) including testing of conductors.
♦ Conducted Hi-Pot Testing of 18 kV IPB and air leak test and prepares all the test result for final acceptance of the client.
♦ Manage all quality activities at site related to Electrical works. Responsible for execution of contract quality management system at site and specific project quality control plans.
♦ Maintaining records and latest revision of all Contract Documents, Drawings, specifications, and Standards, required for Quality Assurance, Quality Control and inspection.
♦ Control, management and execution of all specified inspection activities as per inspection, specification and codes, witness procedures and tests and interpret results accurately.

Company industry:
Construction & Building
Job role:
Quality Control

Quality Control-in-Charge (Electrical Engineer)

December 2007 - March 2008

EEI Corporation

Philippines

December 2007 - March 2008

Client: Jacobs Engineering Group, Singapore (JES)
Date: December 17, 2007 - March 24, 2008
Position: Quality Control-in-Charge (Electrical Engineer)
Scope of Work: Directly Reporting to Project Manager
Duties and Responsibilities
♦ Prepares Quality Control Inspection Test Plan for all Electrical installation and testing works based on project specification and contract requirements.
♦ Documentation works of all inspections and testing conducted as required by the contract documents.
♦ Prepare the completeness of electrical test result.
♦ Verify and check material being used at site if it is complying on project specification and requirement and of client's approved type.
♦ Inspection of delivered material at site with client if it is conform to the packing list.
♦ Installation inspection of 480V- 34.5KV switchgear, dry-type transformer, ring main unit (RMU) and MCC.
♦ Responsible for in-process inspections of all electrical works if it is conform to approved drawings and specifications.
♦ Witness insulation resistance test, hi-pot test of MV cable (6.6kv -34.5kv), function test of MCC, contact resistance test, vibration test of motor, cable laying and other testing woks as required by the contract documents.
♦ Monitors and verifies cable pulling based on cable schedule including all grounding system.
♦ Responsible for the final acceptance of electrical works together with client and owner representative.
♦ Witnessed transformer tests. (Winding resistance test, turn-ratio check, phase relation check, oil, dielectric test, and bucholl's relay test)
♦ Conduct inspection of cable tray installed, embedded and exposed conduit, lightning and grounding installation.

Company industry:
General Engineering Consultancy
Job role:
Quality Control

Quality Control Engineer (Electrical /Piping)

November 2006 - December 2007

EEI Corporation

Philippines

November 2006 - December 2007

Petron Bataan Refinery, Limay, Bataan
Client: Daelim Philippines Inc., (DPI)
Date: November 2, 2006 - December 15, 2007
Position: Quality Control Engineer (Electrical /Piping)
Scope of Work: Directly Reporting to Electrical Supervisor
Electrical Works:
♦ Prepares Quality Control Inspection Test Plan for Electrical works.
♦ Documentation works of all inspections and testing conducted as required by the contract documents.
♦ Prepare the completeness of reports and documents of all electrical works.
♦ Verify and check material being used at site if it is complying on project specification and requirement and of client's approved type.
♦ Inspection of delivered material at site with client if it is conform to the packing list.
♦ Responsible for in-process inspections of all electrical works if it is conform to approve drawings and specifications.
♦ Monitors and verifies cable pulling based on cable schedule including all grounding system.
♦ Final acceptance/inspection of all electrical works together with client and owner representative
♦ Attend weekly coordination meeting together with operation and client.
Piping Works: ♦ Performed PMI using X-MET and Niton and prepares material traceability of all alloy pipes.
♦ Conduct line inspection of every test packages and prepares punch-listing including punch-clearing.
♦ Prepare the completeness of reports and documents before pressure test of every underground test package.
♦ Punch listing works of the completeness of the piping lines with regards to the corresponding test packages.
♦ Conduct line checking prior to hydrostatic testing with the necessary inspection tools and test packages.
♦ Witness hydrostatic testing, air leak testing, air blowing, and holiday testing of piping lines for the acceptance of the clients representative.

Company industry:
Construction & Building
Job role:
Quality Control

Quality Control Engineer (Piping / Welding)

April 2006 - October 2006

EEI Corporation

Philippines

April 2006 - October 2006

Client: Sankyu Construction Corporation
Date: April 6, 2006-October 25, 2006
Position: Quality Control Engineer (Piping / Welding)
Scope of Work: Directly Reporting to QC Supervisor
Duties and Responsibilities
♦ Responsible for the acceptance of Super High Pressure pipe lines (SHP) requirements which includes fit-up, welding, non-destructive test, pressure test (Hydro, pneumatic Test), and pipe internal cleaning of every spools (air blowing, foam pigging, water flushing and steam flushing)
♦ Responsible for the inspection of fit-ups and installations to the required orientations of all fabricated pipes with regards to isometric drawings, P & ID diagrams and piping plan lay-outs, including visual inspections of all welding profiles and conduct inspections of all welding materials based on the approved specifications.
♦ Prepare the completeness of reports and documents before pressure test of every test package.
♦ Punch listing works of the completeness of the piping lines with regards to the corresponding test packages.
♦ Documentation works of all inspections and testing conducted and required NDE works as required by the contract to complete the test packages documents.
♦ Witness hydrostatic testing, air leak testing, steam flushing, air blowing, and restoration of lines for the acceptance of the clients.
♦ Conduct line inspection of every test packages prior to hydro-test, pneumatic test or service test.
♦ Endorsed to NDT section of all weld joints subject for radiographic and penetrant test,

Company industry:
Construction & Building
Job role:
Quality Control

Project Electrical Engineer

April 2005 - September 2005

Camarines Norte Electric Cooperative

Philippines

April 2005 - September 2005

Company: Camarines Norte Electric Cooperative (CANORECO)
Project: System Loss Reduction
Date: April 3, 2005- September 30, 2005
Position: Project Electrical Engineer
Duties and Responsibilities
♦ Analyzed the primary distribution lines, secondary distribution lines, distribution transformer data and service drop data to develop and improve the system.
♦ Review and balance the distribution loads.
♦ Conducted consumer mapping and single line diagram of the distribution lines.
♦ Performed Sanity Check of the Whole Distribution lines.
♦ Collected and downloaded data using load logger.
♦ Assist Technical Department in preparing cost estimates and bill of material using Material Design Assembly (MADRASS)
♦ Verify and check distribution lines

Company industry:
Utilities
Job role:
Electrical Engineering

Education

University of the East

January 2003

January 2003

Bachelor's degree, Electrical Engineering

Philippines

1998-2003 Bachelor of Science in Electrical Engineering University of the East Caloocan, Metro Manila

Skills

Quality Management
Expert
Quality Management
Expert
Electrical Testing
Expert
Electrical Testing
Expert
Electrical Maintenance
Expert
Electrical Maintenance
Expert
Quality Inspection
Expert
Quality Inspection
Expert
Quality Assurance
Expert
Quality Assurance
Expert
CATHODIC PROTECTION
CATHODIC PROTECTION
ENGINEER
ENGINEER
INSPECTION
INSPECTION
ISO
ISO
QA
QA
QM
QM
QUALITY ASSURANCE
QUALITY ASSURANCE
TESTING
TESTING
WITNESS
WITNESS
Quality Management
Expert
Quality Management
Expert
Electrical Testing
Expert
Electrical Testing
Expert
Electrical Maintenance
Expert
Electrical Maintenance
Expert
Quality Inspection
Expert
Quality Inspection
Expert
Quality Assurance
Expert
Quality Assurance
Expert

Languages

English
Intermediate
Tagalog
Expert

Memberships

Life Member- IIEE-Eastern Region Chapter Saudi Arabia

Member

Training and Certifications

Certifications
Integrated Management System IMS
Jun 2009 - Jun 2009
ETAP-113 Workshop- Power System Engineering
ETAP-113 Workshop- Power System Engineering
Sep 2009 - Sep 2009