Projects Undertaken:
1.0 Position: Project Engineer
1.1 Project: Integrated Microelectronics, Inc. May 1997 ~ July 1998
Bldg.” D” Yamaha III
Bldg. “I” Yamaha IV
Scope of works:
HVAC System, Fire Protection System, Facilities Process piping System, Fire Line System, Plumbing and Sanitary System, Fuel Piping System, and Equipment Installation.
1.2 Project: LTI Ph5 Booster Pumping Station July 1998 ~ Mar. 1999
Scope of works:
Industrial and Domestic Piping System Installation,
Pump Installation
1.3 Project: LTI Ph 5 Sewage Treatment Plant
Scope of works:
Piping and Equipment Installation
1.4 Project: LTI Ph 3, 4, 5 Deepwell Pumping Stations Mar. ~ Sept. 1999
LTI Ph 5 Genset Power House
Scope of works:
Fuel Piping System, Electrical Works
2.0 Position: Project-in-charge
2.1 Project: Glorietta-Landmark Bridge way Sept. 1999 ~ Jan. 2000
Scope of works:
Architectural / Civil Works, Electro-Mechanical Works,
Fire Protection works, Sanitary and Plumbing Works
2.2 Project: Macea Pedestrianization Stage II-A Feb. 2000 ~ Mar. 2001
Sedeno Underpass
Elevated Walkways (2M)
Herrera Plaza, Paseo Plaza
Scope works:
Mechanical Ventilation, Sanitary, and Plumbing Works
2.3 Project: Procter and Gamble Phil. Inc. Mar. ~ Aug. 2001
Scope of works: Genset House Installation
Architectural, Civil, Structural, Mechanical, Piping Works,
Equipment Installation
3.0 Position: Mechanical Engineer
3.1 Project: ISUZU Pasig Showroom Aug. ~ Nov. 2001
Scope of works:
Mechanical / Piping installation
Sanitary and Plumbing Works
3.2 Project: Edward Keller Phil’s., Inc. Jan. ~ Mar. 2002
Scope of works:
Mechanical Equipment Installation and Transfer Works
Utility piping installation
3.3 Project: Salcedo Underpass April 2002
Scope of works:
Mechanical Ventilation, Sanitary, and Plumbing Works
DUTIES AND RESPONSIBILITIES
Reviewed construction drawings and specifications together with terms and conditions of the contract and reported discrepancies to the project manager prior to any actual works and establishment of the administrative requirements of the project.
Prepared schemes for the implementation of mechanical works as coordinated to all discipline involved, to include scheduling of work of timely and efficient utilization of resources.
Check and monitor work in progress to ensure compliance with approved drawings and specifications.
Prepared method statement for work simplification as required.
Managed materials and equipment delivery and usage, and controlled assigned manpower at site.
Prepared project organization and planning work schedules for mechanical works conforming to the target dates and budget.
Prepared material quantity, tools, and equipment upon delivery prior to installation.
Prepared change orders and additional works as per approved changes on the IFC drawings and RFI’s.
Prepared estimate of quantities and cost of labor needed in construction materials and equipment.
Reviewed and recommended contractor’s completed works for progress payments.
In-charge of work inspection, monitoring and ensures quality workmanship upon completion of the project.
Report, prepare, and submit weekly accomplishment reports directly to the Project Manager.
Prepared all requirements needed upon project completion / close-out contract requirements. (As-built plans, approved Shop drawings, technical submittals, start-up data, test package, etc.)
Full time supervision of construction projects.