Total Years of Experience: 6 Years, 5 Months
January 2023
To Present
Sr. Piping Engineer
at Technip Energies Pvt Ltd.
Location :
India - Chennai
Project Name -QNFE (North Field East Onshore LNG Facilities) Customer - Qatar gas Operating Company Ltd Responsibility - Managed Waste Water Treating and Pipe Rack Areas. Led team of 7 to prepare piping layouts as per P&ID. Preparing the Piping studies to freeze piping layout of LB & SB, Critical & Non critical lines (Pumps, Verical vessels, Basins, Exhangers, Drum Screen, Pipe rack and chemical area). Checking the P&ID notes and requirements, Capturing the holds & highlighting them to the project teams. Checking the Valve accessibility & maintainability space & obstructions in movement zones and walkways & handling space. Prepared Workfront to my team to meet the weekly deliverable targets to meet the weekly schedule. Reviewing and commenting the Vendor Drawings/MDS. Preparation of Nozzle orientation drawings for vertical vessels. Providing the Priliminary inputs to civil & structural department (fixing the width, tiers elevations and anchor bay locations). Collaborated with electrical, structural and site teams to ensure smooth operations. Reviewing the 3D model on daily basis checking the Clash checking. Checking of IFC isometrics for final issuance. Participating in 90% model review, and incorporating client comments.
Engaged daily 3D reviews for clash checks & addressed client comments
Feb-22 Jan-23
Nov-19 Jan-22
Engaged daily 3D reviews for clash checks & addressed client comments
Feb-22 Jan-23
Nov-19 Jan-22
February 2022
To January 2023
Sr. Piping Engineer (Asst. Manager)
at Larsen and Toubro Chyoda Ltd.
Location :
India - Vadodara
Project Name -PFCCU HRRL (Petrochemical Fluidized Catalytic Cracking Unit from HRRL) Customer - HPCL Responsibility - 3D modelling of piping layout inside Super the Tech strucure dimensions 54m X 24m X 25m TS-08/TS-07. Preparing the Piping studies to freeze piping layout of LB & SB, Critical & Non critical lines. 3D modeling of stress critical lines based stress inputs. Checking the Valve accessibility & maintainability space & obstructions in movement zones and walkways & handling space. Preparation and extraction of IFC isometrics for final issuance. Reviewing and commenting vendor drawings/MDS. Coordinated with multiple departments to ensure seamless project execution. Incorporated client feedback from 90% model reviews for optimum res ults.
November 2019
To February 2022
Piping Engineer
at Saipem India Projects (Pvt.) Ltd
Location :
India - Chennai
Project Name -NLNG CT T-7 (Nigeria Liquefied Natural Gas) Customer - Nigeria LNG Responsibility - Preparing 3D model of equipment layout (vertical vessels, pumps, exchangers & Columns). 3D modelling of Columns, nozzle along with tray orientations. Extraction and preparation of Nozzle orientation drawings. Preparing the Piping studies to freeze piping layout of LB & SB, Critical & Non critical lines (vertical vessels, pumps, exchangers, Columnsand pipe rack). 3D modeling of stress critical lines based on stress inputs. 3D modelling special supports Cryogenics, Spring hangers supports Providing the Priliminary inputs to civil & structural department (fixing the width, tiers elevations and anchor bay locations) Preparation of 3D model of Vertical Columns segmented platforms. Reviewing and commenting vendor Drawings/MDS. Collaborated with electrical, structural and site teams to ensure smooth operations. Checking the Valve accessibility & maintainability space & obstructions in movement zones and walkways & handling space. Participating in 90% model review, and incorporating client comment Engaged in daily 3D model reviews for clash checks and addressed client feedback
Share on Facebook
Share on Twitter
Share Via Email