Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Md Hossain, Project Engineer

Md Hossain

Project Engineer·Saudi Aramco

United States

Master's degree, Mechanical Engineering

Work experience

Total years of experience: 18 years, 4 months

Project Engineer

August 2013 - October 2020

Saudi Aramco

Dhahran Al Janoub, Saudi Arabia

August 2013 - October 2020

• Managed multiple simultaneous projects pertaining to Oil and Gas facilities throughout the entire life cycles - initiation, planning, execution, monitoring, and closeout, in cross-functional environments on time and within budget.
• Guided the project team while achieving project objectives and balancing project constraints.
• Developed Scope of Work (SoW), managed feed studies, prepared project proposal packages.
• Spearheaded bidding processes, selected qualified contractor based on technical and commercial evaluations, and led contract negotiations.
• Developed project execution plan, project milestone dates, contracting strategy, procurement and construction plans.
• Sourced and evaluated potential equipment suppliers. Performed due diligence of vendors and negotiated terms of contract.
• Led and facilitated project risk assessment, identified potential problems and resolved them before they are materialized.
• Managed and balanced conflicting stakeholder expectations in relation to project requirements and ensured successful outcomes.
• Managed Lump Sum Turn Key (LSTK) contractor by effective communication, and monitoring KPIs such as engineering, procurement, and construction progresses.
• Orchestrated innovative ideas to resolve complex technical and constructability challenges and implemented them.
• Developed need-based project change orders, detailed scope, estimated cost, and negotiated prices with contractors.
• Trained young engineers with company procedure and project management methodology.

Company industry:
Oil & Gas
Job role:
Oil and Gas

Pipeline Integrity Engieer

May 2011 - August 2013

BP

Texas, United States

May 2011 - August 2013

• Developed and maintained Pipeline Integrity Management System (PIMS) for BP Assets.
• Developed Integrity Management Plan (IMP) for pipeline, risers, and subsea equipment
• Performed rigorous and systematic identification of threats to pipeline integrity from concept selection through to decommissioning.
• Established common approach to continuous assessment and management of the risks resulting from identified threats through application of mitigation measures to reduce or eliminate risks.
• Provided technical expertise to acquire and analyze appropriate inspection data throughout the pipeline life to demonstrate its fitness-for-purpose.
• Continuously reviewed and revised company best practices to ensure compliance with the latest regulations and industry standards.
• Identified and applied new technologies in pipeline construction and operation to improve project execution efficiency and enhance pipeline integrity.
• Identified sensitivity to the unique environmental and social impacts that result from construction and operation of pipelines.
• Interfaced with technical disciplines such as corrosion, structure and piping to develop mitigation strategy.
• Led risk-based inspection (RBI) workshop to identify risk of ‘active’ and ‘potential’ Damage Mechanisms (DMs), then to assess and rank failure probability and consequence.

Company industry:
Oil & Gas
Job role:
Engineering

Pipeline Engineer

August 2005 - May 2011

Technip

Texas, United States

August 2005 - May 2011

• Calculated pipe diameter and pipeline wall thickness based on design pressure, temperature and flowrate.
• Selected appropriate pipe material based on API grade.
• Prepared design basis documents for new pipeline and subsea structures.
• Performed fatigue calculation for pipelines subjected to cyclic loading.
• Developed FE model for offshore pipeline analysis - lateral buckling of HT/HP flowlines.
• Performed vortex induced vibration (VIV), and On-bottom stability analyses.
• Performed structural design calculations for pipeline structures such as Jumper and PLET.
• Developed installation sequence of subsea pipeline and structures.
• Composed pipeline design reports for clients.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Finite Element Analyst

July 2002 - August 2005

National Oil Well Varco

Texas, United States

July 2002 - August 2005

• Performed conceptual and detailed engineering design of ram type Blowout Preventer (BOP), Drilling Riser, Riser Tensioner, and Continuous Circulation System.
• Performed stress analysis of BOP, Drilling Risers, and Riser Tensioners.
• Conducted failure and fatigue analysis of pressure equipment and prepared technical reports.
• Simulated BOP’s multi ram rubber seal mechanism using finite element to verify sealing capabilities and performance under high pressure/temperature.
• Developed testing procedures of BOP and Riser Tensioners for successful product development.
• Provided technical support to sales, marketing, and manufacturing.
• Performed Design check of new products against API 16A, 8C, 16R and ASME pressure Vessel Codes.

Company industry:
Manufacturing
Job role:
Engineering

Finite Element Analyst

July 2002 - August 2005

National Oil Well Varco

Texas, United States

July 2002 - August 2005

• Performed conceptual and detailed engineering design of ram type Blowout Preventer (BOP), Drilling Riser, Riser Tensioner, and Continuous Circulation System.
• Performed stress analysis of BOP, Drilling Risers, and Riser Tensioners.
• Conducted failure and fatigue analysis of pressure equipment and prepared technical reports.
• Simulated BOP’s multi ram rubber seal mechanism using finite element to verify sealing capabilities and performance under high pressure/temperature.
• Developed testing procedures of BOP and Riser Tensioners for successful product development.
• Provided technical support to sales, marketing, and manufacturing.
• Performed Design check of new products against API 16A, 8C, 16R and ASME pressure Vessel Codes.

Company industry:
Manufacturing
Job role:
Engineering

Education

Wichita State University

December 2001

December 2001

Master's degree, Mechanical Engineering

United States

GPA 3.75
View attachment

Skills

Engineering
Expert
Engineering
Expert
Oil & Gas
Expert
Oil & Gas
Expert
Project Management
Expert
Project Management
Expert
Finite Element Analysis
Expert
Finite Element Analysis
Expert
Pipeline Engineering
Expert
Pipeline Engineering
Expert
Abaqus
Expert
Abaqus
Expert
Ansys
Intermediate
Ansys
Intermediate
Engineering
Expert
Engineering
Expert

Languages

English
Expert
Bengali
Native Speaker