senior project controls and planning engineer
al ayuni
Total years of experience :15 years, 8 Months
project ISG new campus 300 million riyals project in khobar for american and british students school construction
Bidding & Tendering Technical and Planning Support Engineer
KAP 5 is 9 billion interior ministry officers buildings project in saudi arabia
i prepare baseline time schedule of project
i prepare earned value analysis like SPI, CPI of project
i prepare time impact analysis of project for extension of time and impact on cost
1. Ensure Project Controls systems and tools are properly used across the Project and that Project Execution Requirements (PERs) are adhered to.
2. Deliver timely, accurate and integrated Project Controls information that facilitates a clear understanding of the performance of the Infrastructure Project and its component projects in relation to planned targets.
3. Ensure data integrity is maintained through the lifecycle of the Project.
4. Provide management with clear visibility of performance, and the implications and movements of cost integrated schedules and change as the project and its projects progress by maintaining the baselines and audit trails for deliverables and other documentation.
5. Provide Earned Value Management (EVM) across the Project, using Earned Value Analysis (EVA) tools and methodologies to develop, track and interpret earned value metrics, perform variance analyses, and cost forecasting. 6. Manage the collection and maintenance of all information that supports the reporting of progress, measures achievement, and exception and variances against planned performance / expected benefits in KPIs and business cases.
7. Promote, through word and action, a single integrated team culture that values openness and transparency, and ensures data integrity is maintained throughout the lifecycle of the Project.
1- King Abdul Aziz internation airport cargo terminal extension project jeddah saudi arabia.
2- A saud consultant project for Um al Qurah university construction
400 Million SAR university project
planning
monitoring
controlling
costing
estimation
earned value analysis
coordination between construction departments
consultant
SAUDI ARCHIRODON GROUP NV
(Greek Company) Jeddah Saudi Arabia
POSITION: Planning Engineer (Regional Projects)
PROJECTS:
Jeddah South Thermal Power plant Package 1 & 3 (2013)
Saudi Archirodon Ltd. has been awarded the contract for Jeddah South Thermal power plant package 1 & 3, intake Pump House structure (offshore) & Hundred Buildings in year 2013 in South Jeddah Saudi Arabia by the Hyundai Heavy industries Co. Ltd. The main elements of Project are Earth Works, Dewatering, Shoring, Pump House structure, Equipment installation, Buildings, Underground works.
Shoaiba II CCPP Power Plant
Turnkey project for design, supply, construction and commissioning of a 3 x 350 MW power plant (Phase 1) and 2x350 MW additional power units (Phase 2) involving civil, industrial and electro-mechanical works, buildings, offshore facilities, services,
Yanbu Export Refinery Package SP7
Saudi Archirodon Ltd. has been awarded the contract for upgrading the existing NGL Terminal Facilities at Yanbu Export Refinery in Saudi Arabia by the Saudi Arabian Oil Company (Saudi Aramco).
Doubling Railways Project Riyadh to Damam (445KM)
Saudi Archirodon Ltd. has been awarded the contract for Railways project from Riyadh to Damam Saudi Arabia by the Saudi Railways Organization (SRO). The main elements of Project are Earth Works, Track works, Bridges, Box Culverts.
DUTIES:
• Prepare base line plan and its resource loading using PrimaveraP6
• Preparation of Tender Plans
• Prepare Level-4 plan on Primavera P6 with resource loading for project
• Set up database for monitoring weekly progress for Engineering / Procurement / Construction Phases.
• Prepare Earned schedule analysis report to calculate the SPI, SV for the project
• Preparations of two week look ahead schedules / Predecessors & Successors Activity reports.
• Establishing Weightings, Preparation of S-Curves & Project Progress Measurement and Monitoring System for Engineering, Procurement & Construction.
• Engineering / Procurement Man hours / Construction Level of Effort / Manpower Loading & Resources Estimation.
• Prepare Critical Path Analysis for Projects using Computerized Scheduling Systems, including interaction with various discipline groups to develop an Achievable Project Schedule.
• Analyze contractor - submitted construction schedules, clarify issues with contractor when required and develop Contract Master Schedules (CMS).
• Assist in maintaining and improving Planning Systems & Procedures / Formats.
• Assist in effective Presentation of Planning & Forecast Information.
• Preparing estimation sheets, Quotation, invoices
• Progress Reporting Procedures and Preparation of Weekly / Monthly progress
• Attend Weekly Project Progress Review Meeting and appraise Project Progress status and highlight Bottle - Necks / Critical areas.
• Interdisciplinary Co - ordination & Regular Follow up with Engineering / Procurement / Construction Teams / Contractors for feedback on Project Progress Status.
• Interface with Lead Engineers to ensure most efficient operational methodologies are used.
• Collect and analyze past project performance and experience for optimization of future project estimates and schedules
Project : Shah Gas Development Project-SGD Package East-2, ABU DHABI UAE
Client : AL-HOSAN GAS, ENI-SAIPEM
Employer : DESCON Engineering Ltd. AUH
Duration : 21June 2011 -07May 2012
Man Hours : 07 Million MH in DESCON scope
Planning Engineer (Plant Overall Construction)
•Prepare base line plan and its resource loading using PrimaveraP6
•Prepare Level-4 plan on Primavera P6 with resource loading for project
•Prepare productivity, efficiency & progress for project
•Prepare the Daily Diary, Weekly & Monthly Project site reports
•Prepare Project coordination & controlling reports
Project : Integrated Gas Development Project- IGD HABSHAN 5 ABU DHABI UAE
Client : GASCO, JGC JV
Employer : DESCON Engineering Ltd. AUH
Duration : 22 May 2010 - 20JUNE 2011
Man Hours : 8.9 Million MH in DESCON Scope
Planning Engineer (Plant EPC Buildings)
•Prepare Level-4 plan with resource levelling and preparing reports for project using planning Primavera P3 software
•Prepare Look Ahead Plans for Porject site controlling
•Prepare Work front availability for Project
•Prepare feasibility Report for Project
•Prepare the Daily Diary, Weekly & Monthly Project site Reports
*Prepare Estimation sheets, quotations & invoices for the project
*Prepare Estimation sheets, invoices for project
May 2009 - May 2010 Eden Housing Ltd. Lahore Pakistan
POSITION: Planning Engineer (Infrastructure)
PROJECT: Eden Gardens Project 700-Houses Including Infrastructure, Ring Road, Feroz Pur Road, Lahore Pakistan
DUTIES:
• Preparation of project baseline and level 4 schedules with
Complete resource loading and leveling using primavera P3
• Distribute daily, weekly and monthly targets to site supervisors
• Preparation of look ahead schedules, daily, weekly and monthly reports for project
• Plan out the daily job for supervisors as per work front availability
• Monitor and analyze various aspects of progress of all activities on daily basis
• Preparation of s-curves, histograms for project presentation and briefing
• Overall control and review of project documents and drawings and prepare technical queries
• Preparation of material requirement plans and provide information to project manager regarding material utilization and milestones of procurement
Project : CCPP 225 MW Power Plants, Bhikki sheikhupura Pakistan
Client : HALMORE POWER Generation Company Ltd. UK
Employer: DESCON Engineering Ltd. & JV JGC Pakistan
Duration: 02 Sep 2008 to 12May 2009
Man Hours: 07 Million MH
Area Planner ( Plant EPC Buildings)
• Prepare Level-4 plan with resource levelling and preparing reports for project using planning Primavera P3 software
• Prepare Look Ahead Plans for Porject site controlling and working as per
• the work front availability
• Prepare the Daily Diary, Weekly & Monthly Project site Reports
• Raise, solve and follow up site related Technical queries and issues
• Plan out the Daily job on supervisor level as per the work front availability.
• Monitor and Analysis various aspects of progress of all activities on daily basis
• Progress Monitoring on Descon house software PROCeSs
Bsc. Civil Engineer