مجموع سنوات الخبرة :46 years, 9 أشهر

FM Engineer في Merck Sharp and Dohme
  • المملكة المتحدة
  • أشغل هذه الوظيفة منذ يناير 1998

FM Engineer (Jan 2004 - Present)

Site Services Department absorbed into the Engineering Department. Role changed to Facilities Management (FM) Engineer. Main responsibility is the management of a FM company to provide the maintenance and development of the site utilities, cleaning, catering and security. I also have responsibility for the operation and maintenance of two 2.05 MW Wind Turbines, via a third party contractor.

Also I manage major projects on site. Projects carried out recently included:
o Design, installation and commissioning of an Automated Crane System (£1.9m).
o Design, installation and commissioning of an Automated Guided Vehicle System

Maintenance Engineer (Jan. 1998 - Jan. 2004)

Based in the Site Services Department. Responsibilities included direct line management of eight maintenance technicians (mechanical and electrical) maintenance and development of the site utilities, HVAC, fire systems and site wide energy management.

Mechanical Engineer في SCA Hygiene
  • المملكة المتحدة
  • فبراير 1992 إلى يناير 1998

First role was to provide technical support to the Household Products Division. Projects carried out included:
o Installation and commissioning of metal detection equipment.
o Upgrade of a kitchen towel printing machine.

In 1995 I was transferred to the Site Services department, where I managed a small team of maintenance personnel, including a supervisor. Responsibilities included the maintenance and development of site utilities, HVAC, fire systems and site wide energy reduction programme.

Project Engineer في Armstrong World Industries
  • المملكة المتحدة
  • فبراير 1989 إلى فبراير 1992

Worked in Technical Services Department, responsibilities included preparing engineering proposals, with costs, to support a capital investment programme. Design, specification, installation and commissioning of equipment. Projects carried out included:
o Rotary Press
o Paint Mixing Facility
o Production Line (£1m)
o Dust Extraction System (£500k)

Project Engineer في Norstead Engineering Services
  • المملكة المتحدة
  • أكتوبر 1987 إلى فبراير 1989

Worked in Plant and Maintenance Department, responsibilities included project management of a variety of projects:
o Design and costing of a new plant layout for Cape Insulation
o Renewal of heating and hot water pipework for HMYCC Castington
o M&E installation for a new polymer processing plant

Graduate Engineer في Swan Hunter Shipbuilders
  • المملكة المتحدة
  • أغسطس 1977 إلى أكتوبر 1987

Indentured Technical Apprenticeship. Worked in Drawing Office, Design Office and Operations Control Department.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Newcastle Upon Tyne Polytechnic
  • مايو 1987

2nd Class 1st Division Honours

Specialties & Skills

Engineering
Facility Management
Maintenance Engineering
Maintenance Management
Mechanical Aptitude
Six Sigma - Yellow Belt

اللغات

الاسبانية
متوسط

العضويات

Institution of Mechanical Engineers
  • Member
  • May 1991