1-Develop and implement a facility management program including preventative maintenance and life-cycle requirements
2- Ensure compliance with health and safety standards and industry codes
3- Allocate and manage facility space for maximum efficiency and coordinate intra-office moves
4- Plan and manage facility central services such as floors secretaries, reception, House keeping, catering, waste disposal and parking
5- Implement best practice processes to increase efficiency
6- Obtain quotes and tenders from vendors and suppliers and negotiate contracts to optimize delivery and cost saving
7- Manage and review service contracts to ensure facility management needs are being met
8- Check completed work by contractors and vendors 9- Verify payment and invoicing match contract pricing
10- Generate and present regular reports and reviews of facility-related budgets, finances, contracts, expenditures and purchases
11- Develop and implement cost reduction initiatives 12- Advise on and monitor energy efficiency
13- Respond to facility and equipment alarms and system failures.

senior store services specialist في azadea
  • مصر - القاهرة
  • فبراير 2016 إلى نوفمبر 2017

1-Ensure proper maintenance of office and stores on daily basis in assigned areas as requested by the hierarchy and in compliance with departmental and company policies and procedures.
2- Inspect problematic areas, make recommendations, coordinate and/or conduct repair, improvements, installation and maintenance.
3- Inspect workmanship of installations in order to ensure conformity to plans and specifications on facility maintenance projects
4- Support the development of facilities policies, procedures and processes and establish best practices methodology (such as in energy management) in order to maintain retail chain and supporting functions
5- Manage schedules and all maintenance works and provide support to the stores in the back office
6-Assist in the management of the maintenance team and contractors
7-Prepare progress reports on facilities maintenance projects

facility manager في arabian group for trading and distribution
  • مصر - القاهرة
  • يونيو 2015 إلى فبراير 2016

1-Preparing documents to put out tenders for contractors;
2-Project management and supervising and coordinating work of contractors;
3-Investigating availability and suitability of options for new premises;
3-Calculating and comparing costs for required goods or services to achieve maximum value for money;
4-Planning for future development in line with strategic business objectives;
5-Managing and leading change to ensure minimum disruption to core activities;
6-Directing, coordinating and planning essential central services such as reception, security, maintenance, mail, archiving, cleaning, catering, waste disposal and recycling;
7-Ensuring the building meets health and safety requirements and that facilities comply with legislation;
8-Keeping staff safe;
9-Planning best allocation and utilization of space and resources for new buildings, or re-organizing current premises;
10-Checking that agreed work by staff or contractors has been completed satisfactorily and following up on any deficiencies;
11-Coordinating and leading one or more teams to cover various areas of responsibility;
12-Using performance management techniques to monitor and demonstrate achievement of agreed service levels and to lead on improvement;
13-Responding appropriately to emergencies or urgent issues as they arise and dealing with the consequences.

MEP maintenance project manager for QNB buildings في egypro fme
  • مصر - القاهرة
  • ديسمبر 2014 إلى يونيو 2015

Performed all Maintenance and Repairs for 10 highest Headquarters Buildings inside and out with 180, 000 square feet of Commercial space.
1-Completed tasks on time and within budget resulting in strengthening Management to owner relationships.
2-Created and maintained Preventive Maintenance Schedule to perform regular checkups so as to avoid breakdown and disrepair.
3-Maintained and repaired all MEP fixtures ensuring they were in working order at all times.
4-maintained all Civil works inside the buildings like floors, carpentry, ..etc.

electrical facility engineer في egypro
  • مصر - القاهرة
  • نوفمبر 2013 إلى ديسمبر 2014

in charge with all electrical works at Vodafone 6th October building this includes the following:
1-Ensure efficient use of all resources of the plant
2-Active participation in strategic planning and development
3-Analyze and evaluate various vendor offers, sub-contractors services, etc., to help get the best deal
4-Oversee the maintenance and functioning of various equipment and machines includes generators, UPS, voltage regulators, substations, … etc
5-Responsible for facilities in Vodafone data center, switches
6-Arrange for regular preventive maintenance

Team leader في Orascom trading
  • مصر - القاهرة
  • أغسطس 2011 إلى أكتوبر 2013

Responsible for the diesel generators which Supply Mobinil EGYPT sites with electricity this includes:
1- Routine periodic preventive maintenance for generators. (150 site around cairo)
2- Corrective maintenance on a per case basis provided around the clock for the aforementioned systems and equipment with very limited response time.
3- Electrical technical support for control of generator & ATS
4- Team leader for installation & maintenance team of generators

الخلفية التعليمية

ماجستير, electrical engineering
  • في Faculty of engineering cairo university
  • يناير 2019
دبلوم عالي, power stations and electrical network
  • في faculty of engineering ain sham university
  • يناير 2015

post graduate diploma from faculty of engineering ain shams university from power and electrical machines department in power stations and electrical network

دبلوم, FE (fundemental of engineering)
  • في ncees (the National Council of Examiners for Engineering and Surveying)
  • أكتوبر 2012

The FE exam is typically the first step in the process leading to the P.E. license. It is designed for students who are close to finishing an undergraduate engineering degree. The exam lasts 8 hours and is administered in April and October. the link for more information: http://ncees.org/exams/fe-exam/

بكالوريوس, electrci power and machines
  • في هندسة القاهرة
  • نوفمبر 2011

Specialties & Skills

Project Engineering
Maintenance Engineering
Power Engineering
Power Analysis
Electrical Engineering
all power systems analysis program as ETAP
autocad
plc programs

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Certified Energy Manager (الشهادة)
تاريخ الدورة:
April 2019
(الشهادة)
تاريخ الدورة:
August 2007
صالحة لغاية:
August 2007
(الشهادة)
تاريخ الدورة:
July 2007
صالحة لغاية:
August 2007
(الشهادة)
تاريخ الدورة:
March 2011
صالحة لغاية:
April 2011
اجادة برمجة الPLC (الشهادة)
تاريخ الدورة:
February 2011
صالحة لغاية:
March 2011