shift engineer
PARCO
Total years of experience :21 years, 3 Months
Shift Engineer (Operations) Utilities plant
Currently I'm working on utilities plant. It consists of COGEN system with 03 gas turbines of 10MW each manufactured by GE and associated 03 HRSG's of 50 tons/hr of steam generation capacity each. Moreover, unit has demineralization plant (cation/anion exchanger), Intrument and plant air compressors. And cooling water sytem.
Sep2006-Dec 2007 Shell Gas Limited Faisalabad
Shift Engineer (Operations)
My responsibility was that of a site incharge and HSE Engineer. My prime responsibility was to fulfill daily production target for which I had to plan & arrange resources & co-coordinating with marketing dept. At day end, all the stocks, sales, had to be reconciled. I was also responsible for implementing, monitoring HSE related matter
Feb 2005-Aug 2006 Pepsi Co Limited (Riaz Bottlers) Lahore
Shift Engineer ( RO plant/ Utilities) Experience 1.5 Years I was assigned a project of erecting, installing and commissioning of their new RO/ water treatment (Designed throughput= 350 m3/hr) and mineral water plant (Aqua Fina) . The plant comprised of state of the art 03 Berkefeld RO systems, Sand (Flocculation) & carbon Filtration units, Zeolite Softener, Chillers, water Turbine system, Chemical dosing units, Cooling towers, mineral dosing unit and Ozone reactor. All the plant was operated through single dcs screen After successful completion of the project, I took shift charge and operated plant effectively & supervised the maintenance activities. Spare parts for the facility were also ordered by me. Chemical consumption monitoring, ordering & forecasting was also my responsibility. Logging shift activity was also my routine. Supervising and control of water treatment lab was also assured by me.
Mar 2003- Feb2005 ICI- ppta Limited Karachi
Trainee Shift Engineer (Petrochemical Operations) Experience 2 years
* I started off my career from Imperial Chemical Industries (ICI-PPTA), ( a member of ICI worldwide group) . It is the leading Multi-National Company in Pakistan with state of the art, $ 480Million huge petrochemical complex. First year, I got training on of the oxidation plant along with comprehensive training on site safety procedures, study and understanding of plant process using operational modules and plant PFD's with extensive on plant training. The plant had following units; Reactor, crystallizers, Rotary filters, Dryer and a 24 MW Air compressor. I was also rigorously taught about the permit to work system. In the 2nd year of my training I was responsible to take care of all the shift activities. Also, I've worked there on DCS and ASPEN process explorer. Equipment handover for maintenance, Job supervision was also my responsibility.
* Chemical Engineering 1998-2002 I.C.E.T Punjab University Lahore Overall aggregate 77.8% * F.Sc
1993-1996 Crescent Model Higher Secondary School Lahore 74.272% * Matriculation
1991.1993 Crescent Model Higher Secondary School Lahore 82.7% Computer Skill M.S. Excel, Word, Power point and sound knowledge of usages and application of internet, Microsoft Visio, Aspen Process explorer, JDE, Maximo. Trainings I've gone through following training programs Team building, goal setting, effective communication, supervisory skills HSE Skills I've good experience in practical implementation of PTW system, developing and implementing site safety procedures, Safe systems of work on equipment and machinery, decontamination procedures, hotwork, vessel entry, Emergency handling, Near miss reporting and investigating accidents and prevention techniques. Hazard identification and eliminating risks using MSDS, safety audits, was also part of my job. I've gone through dupont STOP series and scored 93% in tests conducted of 8 units.