Work Experience

Total years of experience :35 years, 0 Months

power network operation specialist at WSP at NCC Kuwait
  • Kuwait - Hawali
  • My current job since May 2017

- Responsible for operating the electrical system in more efficient, secured and reliable way.
- Conduct network analysis for contingency and load flow study for different load and system configuration scenarios daily and seasonally.
- Update the EMS NA application by coordinating with the supplier to fix issue update parameter and doubted result and keeping record of all activities for reference and further issue.
- Analyze contingency, propose reconfiguration of power system to improve the system security, and conducted power flow analysis of Kuwait power network using NA spectrum 4 Siemens.
- Update the economic despatch (Unit commitment tool, JROS) to comply with the current power and water plants, power and water network and the tool functioning specification.
- Update the primary energy power curve (PEP curve) of generation and desalination units in the JROS model of spectrum.
- Utilize the load forecast and JROS (Unit commitment) tool of the Spectrum to generate optimum daily despatch plan to achieve to most optimum generation scenario to meet the forecasted load demand, required spinning reserve and meet the system security.
- Prepare backcast case and analyze the deviation from the daily plan to generate the required optimum plan for next day and calculate the extra operation cost caused by that deviation.
- Keeping record of daily plan, actual and the deviation analysis of the daily despatch for future analysis and for achieving.
- Develop power plant communication protocol for declaration and collecting data, and develop procedure to produce optimal daily/weekly despatch plan using unit’s commitment model and updating those procedure for better system operation and compliance with the related code.
- Prepare weekly/yearly power generation planning, estimation of fuel requirement, the best fuel allocation to meet the forecasted demand, required spinning reserve and the system security and comply with the related code.
- Conduct power-trading activity when required using the available tool (UC).
- Communicate with the Control Room Operators to implement the generation plan and maintain the system frequency and voltages within the prescribed limits for safe and stable operation and most efficient operation of the system.
- Coordinate and communicate with the tool supplier for EMS, AGC for update and improvements the performance to comply with the best system operation and engineering practice.
- Analyze major incident, report to the manager the necessary recommendations for better system operation, and avoid the reoccurrence.
- Manage and collect the operational data to simplify the required analysis for better performance and yearly analysis and advise real time engineers for better data recording.
- Coordinate and share knowledge with colleagues for better system operation.
- arrange for all switching operations on the Electrical System being monitored by NCC / DCCs and co-ordinate such works with other CCs / TEN / EDN and Power Stations for operational or maintenance purposes.
- Establish in coordination with the operation planning expert engineer the restoration procedures for different scenarios those might result in partial or complete black outs.
- Checking, compilation and preparation of all information needed for the proper, secure and reliable operation of the power network.
- Approval to the requested emergency shut down programs for the network and power plants.
- Keeping the records pertaining to system operation.

senior electrical Engineer at elecorp electromechanical
  • United Arab Emirates - Abu Dhabi
  • My current job since April 2016

- Burj Khalifa Dubai performing electrical inspection and auditing mission, for Dash inspectorate, contractor is Farnek total facilities management, study testing, analyses PPM activities and report recommendation Inspect installation of Ungears, compact switchgear 11KV Splice Switch ABB, CHWP, Motor .VDF, Generators etc. and on the maintenance of electrical installation.

- Utilize software effectively i.e. AutoCAD, SIMARIS Siemens for Cable/Bus bar selection, voltage drop, short circuit, load flow and protection setting coordination for MV/LV, selecting size of transformer, switchgear, MCC protection criteria. And Using ETAP demo.
- Using Dialux Evo for lighting, 3 importing file from AutoCAD, street lighting, and fixture selection.
- Electrical Designing: Electrical load calculation, Preparation of Preliminary design report, Sizing & Selection of Electrical equipment on design basis, preparation of Lighting layout, cable tray layout, cable schedule, Equipment layout, Preparation of HT, LT & LV Scheme, SLD, Earthing layout.

- Submit estimation including the scope. Prepare task schedule of electrical work. Assign staff.
- Prepare CPI, prepare period-by-period basis of Earned Value, Planned Value, and Actual Costs.
- MEP Estimation: Preparing Project Costing, Estimation & Planning for Electrical, .
- MEP Drawings Coordination: Coordination for Tender Drawings, maintain records for revisions, Quality auditing, checking of work done as per drawings, approval of shop drawings.
- Estimation and redesign of multistory building in Abu Dhabi. Mubarak almansoory Building, Tanat consultant al Rabya contractor. binary tech.
- Supervise the MEP work ensure its compliance with the scope and code.
- Participate in the commissioning of Marriott hotel Abu Dhabi. Hassan Murad.
- Perform electrical design in Dubai. MSM consultant.
- Review design, study drawing and perform estimation of V.F.D 4.5 MW of two motors of Blade Balance Test project. Elecorp.
- Prepare shop drawing/design, coordination drawing and detail drawing of electromechanical work, Get approval from consultant and authority as required.
- Estimate surge compressors of Swaihan pumping station.E12GCSS.
- Make electrical design, light design and estimation of Banyas club. Elecorp.
- Estimate, Fire damper in LDC Transco. E12GCSS.
- Follow up MV pumping station in Fujairah using online Maximo through Transco.
- Make estimation of electromechanical work
- Review scope. Spec of materials and drawing. Request material price and analyze the vendor’s price and spec.

senior electrical engineer,expansion planning and power plant expert at Abu dhabi water and electricity authority
  • United Arab Emirates - Abu Dhabi
  • July 2010 to April 2016

- Support and inspect site test of electromechanical work ensuring its compliance with the scope, method of statement and meet the code.
- Review the BOP of plant and the impact of the configuration of emergency diesel generator, Aux .415V-11 KV system on the plant reliability and related buildings..
- Review the scope of work and contract documents, Review and Prepare of method statements, procedures and routines where required to meet the contacted procedure and document.
- Prepare long term plan AIS of power and water considering constrain, ensuring capacity meet the security, GCCIA, ENG code, including fuel estimation, plant modelling.
- Prepare budget, annual information system AIS for seven years planning for power and water expansion planning and trading. Calculate Energy, fuel, daily/Monthly/yearly.
- Pricing the energy and Water (bulk supply tariff) .perform dashboard for multiple scenarios.
- Analyze and utilize technical and business performance of generation and desalination and prepare benchmark of efficiency and cost.
- Reviewing and analyzing daily/monthly/yearly energy consumption and prepare KPIs and prioritize and trigger actions.
- Trace out Meters mapping, calculate net energy, energy consumption of equipment, and gross energy and compare the value with the contractual value.
- supervise power plant commissioning, performance, NDC and reliabilities test of GTs, STs and plant ensure it meet the scope and the PWPA with contract and transmission code quality, requesting accomplishment when required.
- Active participation for Site, testing & pre-commissioning test.
- Checking the Inspection& Test reports submitted by the third party or contractors.
- owner engineer of cable AC voltage test of main insulation of MV/HV.
- Power plant commissioning, testing, and analyzing the power plant performance, NDC test. Reliabilities test, plant. Conventional 1600 MW 100 MIGD Shwaihat S2, Shwaihat S31600 MW, Shams 1 solar plant (SP 100MW) plants, Desalination system, cooling pumps, sea water intake, fuel system and emission, electrical 415-400KV system.
- Achievement:
• 40M$ fuel saving yearly by correct sector opinion about winter mode of operation of FAPCO plant 2200 MW 130 MIGD Gas Turbine GT26 for Transco-ADWEC Abu Dhabi, correctness is confirmed in Dec 2015, documented.
• Fix the methodology of fuel calculation and the bulk supply tariff SMP calculation implementing
• Implementing Unit commitment in long term analysis achieving a practical output.
• Study the impact of NPP on water production in winter up to year 2030 and report capability.
• Prepare performance data, power /water units, and plant configuration and operation mode.
• Calculate the benefit (cost saving) by combining the generation between EMAL - ADWEA.
• Perform fuel /energy allocation cost study for power and water of four methodologies.
• Perform Feasibility study of MED. vs RO calculating cost different.
• Support and commented on Pöyry engineering 2014 in the assessment of LDC Transco economic dispatch.
• Drive and analyses the performance data of units and plant, study scope of work, analyses the design condition, technical limit of units, performance characteristic, heat rate of Siemens, GE machine, Alstom, reviewing operational modes and prepare, correct performance parameters

Generation planning Engineer, economic dispatch(manager at Transco
  • United Arab Emirates - Abu Dhabi
  • February 2006 to July 2010

- Support the test of the electromechanical facility in the control Building: power, light, emergency diesel engine, DC system, Batteries bank, UPS, DC ATS and LV switchgear and control circuit prepare and report near miss.
- Prepare and Review BOP, SLD of MV/HV aux on plant reliability and Support the new power plant. Commissioning.
- Directing the Economic dispatch of whole system, power and water daily dispatch, LDC Transco Abu Dhabi documented.
- Prepare generation schedule and Unit shutdown hourly basis to achieve optimization and comply with the security and code of Abu Dhabi and area ENG code.
- Direct the generation and desalination outage plan daily/yearly wise complying with the security code, optimization goal and transmission code.
- Coordinating with the transmission 400-132 kV system’s outage engineer to comply with the security and optimization mission.
- Supporting and advise, Senior, production shift engineer in contingencies and advice to increase the output availability of power to restore security requirement and under frequency status.
- Support in black outage restoration procedure preparation, ensuring that the designated plants/units are always available in case black start or major plant trip needed.
- Ensure available reserve, primary, secondary and tertiary meet the co code and interconnection
- Ensure that the transmission outage not effecting the security /reliability of plant and system.
Achievement:
• 6% fuel saving yearly wise (billions of DHS gas - liquid fuel) by Directing the Economic dispatch of whole system, power and water daily dispatch, LDC Transco Abu Dhabi documented
• Direct and successfully implement the unit commitment Siemens module in daily despatch power and water hourly basis, on call 24 hours seven days a week, achieve EDL online use; UC is a module installed in 2004 implemented in 2007 LDC Transco Abu Dhabi.
• Review design of HV, LV, control, protection scheme, Analyze major trip of the plant CCGT: TWA1, TWB2, SASN and TWB3 and Aux impact on plant reliability with IWPP and with stakeholder and advice to avoid it reoccurrence.
• Manage the utilization of fuel utilization (Fuel gas, Diesel and crude oil) complying with the quota using UC error is 10/1300. Distribute load to maintain gas pressure, estimate daily/ weekly/yearly fuel.
• Approve critical transmission line outage 400 kV in summer for emergency purpose for maintenance issue ensure that the system remain secured in case of island case, documented.

Electrical commissioning -maintenance Engineer and workshop Manager at Bainounah power Co
  • United Arab Emirates - Abu Dhabi
  • March 1994 to February 2006

-- Direct electrical maintenance of Power plant of 20 GTs, boilers, STs, distillers and associated BOP: 415v-132 KV switchgear, MCC AC/DC, Protection circuits, Generators, transformers, LV/HV motors, Batteries bank, UPS, calling system, fuel skids and gas reducing station and huge area of building and street light.
- Direct workshop, Supervise and support the Maintenance of LV/HV Motors, motor rewinding, pumps, welding machine, compressor, and repairs of all electrical equipment in field.
- Direct staffs, direct spare part, Monitor all work carried within the electrical discipline ensuring safety and code are met continual and efficient operation.
- Manages development of maintenance operating plan including objectives, goals and actions, Maintain the expenditures for cost control and comply with the budget.
- Participates in budget preparation.
- Coordinate with plants ‘operation, mechanical and instrument sections.
- Support plants ‘operation, mechanical and instrument sections to achieve appropriate maintenance plan and shortening the outage time. Turbine mechanical maintenance and I&C .
- Support I&C instrument maintenance, Mark V (turbine controller), sensor, and transmitter calibration.
- Witness the alignment of Gas turbine Generators and water pumps alignment, inspection and replacement of mechanical part.
- Prepare PM-predictive-reliability maintenance plan, safety plan.
- Using (CMMMS) MAXIMO in daily work.
- Perform condition monitoring plan of the equipment.
- Generate work orders, assign orders priorities and that emergency troubleshooting.
- Development of detailed design, protection and control schemes Reinstall and test interlock circuit of 11-33-132 kV switchgear. . Topping up the purification of GIS.
- Review Vendor’s quotations, prepare technical quotation evaluation and recommend the final technically acceptable Vendor.
- Develop specifications and prepare material requisitions for LV &MV electrical switchgear, UPS, MCC, power transformers.
- Attending meeting for analyzing and to explain any critical failure.
- Develop fault-finding procedures, Ensures that maintenance technicians are adequately trained, equipped, and motivated.
- Provide technical support in troubleshooting complex failures in electrical equipment and prepare KPIs analysis.
- Periodically perform testing of protection relay in whole system and upgrade to multifunction relay.
- supervise the test of 132 KV cable of 400 kV .- Review Calculation of the current rating, IEC 60287.and Short Circuit Current Carrying Capacity. Witness the Sheath Voltage Limiter Verification Test, Cross Bonding Performance Test.
- Overview the cable trench and termination of MV/HV.
- Reinstall Test and commissioning MCC, motor protection MV/LV .dismantle and assemble, test 11kv switchgear, and perform point to point test.
- Manage the MEP maintenance of huge area of building, office, store and workshop service and street light.

- Achievement:
• Direct and provided an engineering maintenance planning, prioritize work order, direct staffs, which result an adoption of new cost-saving, and improve power plant availability and for huge area of building and street lighting .415-132 KV.
• Modify the protection scheme of GTs. Performed black start test of all GTs and island bus bar synchronization.
• Carry out black startup of power plant after blackout year 2001 as backup.
• Calibrate thermal image of transformers, all type of plant transducer and check old energy meter.
• Fix total summation MW of old and new0-20 mA and 4-20 mA Transducer:
• Fix the low insulation status of 12 motors, 6.6 kV motors of Boilers, saving 250 K $.
• Modify rotor earth fault relay control to achieve continuous checking.
• Found reason behind over temperature alarm of 8 Generator transformers.
• Redesign the 33kv synchro-check circuits and protection scheme and Fix snag list items of EPC.
• Rejected 33 kV ABB interrupter.

Project Electrical Manager at Al Bushra contracting
  • United Arab Emirates - Abu Dhabi
  • May 1989 to March 1994

-- Manage , supervises, testing, commissioning of the electromechanical works of 10 projects, multistory building, villas and schools in Abu Dhabi from the Estimation till closing.
- Prepare electrical design, shop drawing and Get approval from consultant and authority..
- Review Vendor’s quotations, prepare technical quotation evaluation and recommend the final technically acceptable Vendor.
- Inspect materials and spare ensure compliance with the spec and suitable in desired location.
- Manage staffs, six crews attend meeting, supervise the job, and coordinate with stockholder.
- Problem solving. Prepare monthly performance report.
- Make estimation of electromechanical work, Prepare method of statement and tender document.
- Prepare shop drawing/design and detail drawing of electrical work fire alarm, TV system, Intercom and telephone, Get approval from consultant and authority.
- Review scope. Spec and drawing. Estimate labor cost.
- Estimate, ensure estimation cost of project is reasonable and the projected cost is effectively minimized.
- Submit estimation including the scope. Prepare task schedule of electrical work. Assign staff.
- Prepare CPI, prepare period-by-period basis of Earned Value, Planned Value, and Actual Costs report of project.
- Request material quotation, check the spec of material .negotiate with vendor, Select vendor, Submit MAR material request for approval.
- Prepare methods of statement of installation, commissioning, testing and risk assessments as required. Get approval and acceptance of tasks.
- Request MAR, Inspect and get approval for receptions Prepare Safety plan, direct /Witness activities of work and staff support when required. Solve problem if required.
- Perform partial test and get approval and acceptance.
- Prepare monthly report, get acceptance. Report to the company owner
- Perform complete test of the project, get acceptance, fix snag if there are.
- Prepare as built drawing, Get approval, Request the power co for providing supply perform final report. Submit the operation /maintenance manual.
- manage these projects till closing, perform document ::
• Shaikh Saqr Bin Nasser Alnuoaimi, 18 typical.
• Mohamad AL QAZ building. 18 typical.
• Abu Dhabi commercial Bank residential building; bus bar riser. 18 typical.
• Abdul alrahim AlFahim. MDB form 4 Dorman. 18 typical.
• Hamad almansoory. Bus bar riser. MDB form 4 Dorman. 18 typical.
• Five typical: Four buildings HH Khaliah committee in Madinat zayed. two project.
• Two villas in al Bateen. Ajnadeen school extension. PWD. Perform electrical design in Dubai.
• Participate in Marriott hotel Witness commissioning.

Education

Bachelor's degree, electrical power and machines
  • at beirut arab university
  • September 1987

Specialties & Skills

Power Systems
Maintenance
Construction
Water Efficiency
PowerPlant
Unit commitment
autocal
expansion planning power and water plant and network
power plant

Languages

Arabic
Native Speaker
English
Expert

Memberships

lebanese engineering association
  • member
  • April 1988

Training and Certifications

SEE CV (Training)
Training Institute:
SEE CV
Duration:
10000 hours

Hobbies

  • swimming