Mohamed Fadzil Zainal Aabidin, Construction Supervisor

Mohamed Fadzil Zainal Aabidin

Construction Supervisor

Saudi Petrochemical Company

Location
Malaysia
Education
High school or equivalent,
Experience
26 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 0 Months

Construction Supervisor at Saudi Petrochemical Company
  • Saudi Arabia - Jubail
  • April 2010 to March 2018

April 2010 - March 2018 Construction Supervisor
Saudi Petrochemical Company (Sadaf) Al-Jubail, Saudi Arabia
• Reporting to the Construction Group Leader and Project Development Department Manager
• Project supervision and management
• Liaise with engineers, vendors, contractors.
• In charge of site safety
• Review and coordinating approval for Job Safety Analysis (JSA)
• Review and coordinating approval for Lifting Procedures
• Review and coordinating approval for WPS
• Review and coordinating approval for materials
• Authorized personnel, material & equipment receiving
• Authorized Work Permit Issuer & Receiver
• Authorized to work in Pipeline Corridor
• Coordinating ID application for contractor's personnel
• Coordinating Safety Orientation, Fire-watch & Standby-man briefing and qualification for contractor's personnel
• Coordinating approval of Riggers, Mobile Equipment (cranes, trucks, etc)
• Coordinating approval for contractor's electrical equipment & tools
• Supervision/coordination of Safety Officers and QA/QC inspectors
• Training of new employees
Projects involved: • Plant-wide concrete rehabilitation
• 500m 24" ethane pipeline inclusive of filtration units
• 1, 000m 8" HDPE pipeline in Sadaf's Salt Plant
• Installation of analyzers and platforms for exhaust stacks
• Replacement-in-kind (RIK) 200MT exchanger
• RIK HERIT exchangers
• Installation of 2 unit of Alpha Laval brine sludge decanters
• RIK 100MT exchanger
• RIK 50MT eductor
• Catholyte headers (FRP pipes) changeout
• RIK of 2X24" transfer lines for MTBE plant
• RIK of 120MT Heat exchanger for EDC plant

Familiarization of Codes & Standards: • API 510 • API Guides for the inspection of Refinery Equipment
• ASME Section I • ASME Section V
• ASME Section VIII • ASME Section IX
• ANSI B16.5 • ANSI B16.5
• Sadaf Welding Procedures • Shell Oil Company Procedures

at Negotiable
  • January 2011 to December 2011

Bonus 4 months (2011)
Paid overtime work. Rate: 1.5 (weekdays) 2.0 (week-ends)

Expecting: Negotiable

Present: Extendable 2 year contract. Family status/package (4 children) inclusive of medical & education coverage and company provided flight tickets once a year. 5-day week, normal shift. Turn-around; 12-hour shift.

Expecting: Similar or rotation (negotiable)

Project Superintendent at Broadgate Engineering (M) Sdn Bhd
  • January 2001 to December 2009

Jan 2001 - Dec 2009 Project Superintendent
Broadgate Engineering (M) Sdn Bhd Selangor, Malaysia
• Reporting to the Managing Director
• Project management
• Plan and execute restructuring of operational procedures and practices to improve the efficiency and output quality of the project teams.
• Supervision of Construction Supervisors
• Business Development
Projects involved: Pipeline construction, underground utility detection/mapping, route planning, horizontal directional drilling planning, design and calculation for various Gas Malaysia's Natural Gas Distribution System (NGDS) projects such as: 1. NGDS to Bukit Kemuning, Shah Alam, Selangor, Malaysia
2. NGDS to Kulim, Kedah, Malaysia
3. NGDS to Bangi, Selangor, Malaysia
4. NGDS to Kajang, Selangor, Malaysia
5. NGDS to Port Klang, Selangor, Malaysia
6. NGDS to Bulit Rambai & Tangga Batu, Melaka, Malaysia
7. NGDS to Pasir Gudang, Johor, Malaysia
8. NGDS to Prai, Penang, Malaysia
9. NGDS to Parit Buntar, Perak, Malaysia

Project Manager at NGDS to Taiping
  • January 1996 to December 2000

10. NGDS to Taiping, Perak, Malaysia
Jan 1996 - Dec 2000 Project Manager
Empire Prospect Sdn Bhd Penang, Malaysia

* Responsible in setting-up the Horizontal Directional Drilling Section.
* Equipment, parts and materials procurement.
* Hiring and training of new recruits.
* Business development.
* Liaison with clients and relevant government agencies.
Projects involved: * Telekom Malaysia cabling works in Malim Nawar.
* Celcom fibre optic network for Langkawi.
* Time-Telekom optic network in Arau, Perlis.
* TNB project for Kepala Batas TUDM base.
* Celcom optic network project in Bangi and Nilai.

(1) Construction Superintendent at Pi-Gas Engineering Sdn Bhd
  • January 1994 to December 1995

Jan 1994 - Dec 1995
Pi-Gas Engineering Sdn Bhd Selangor, Malaysia
(1) Construction Superintendent
• Reporting to the Construction Manager and the Managing Director.
• Supervising a group of Construction Supervisors consisting of 3 Australian Supervisors and 3 local Supervisors and a QC Supervisor.
• Liaison with government agencies, local authorities and utility companies.
• Attend meetings with Client.
• Coordinate site paperwork.
• Work site safety.

Projects involved: * NGDS to Gardenia Sdn Bhd, Shah Alam.
* NGDS to Shah Alam Phase II.
* NGDS to Kluang.
* NGDS to Prestige Ceramics, Puchong.

(2) Directional Drilling Supervisor
* Responsible in setting-up the Directional Drilling section.
* In-charge of operation and maintenance of the drilling rig.
* Prepare relevant approvals and documentations.
* Marketing.
Projects involved: * NGDS to Kluang, Johor: ➢ 5 drills, average length: 90 meters.
➢ Three river crossings, two road crossings.

* NGDS to Puchong, Selangor: ➢ 8 drills, average length: 120 meters.
➢ Four river crossings and four road crossings.

Construction Supervisor at Gas Malaysia Sdn Bhd
  • January 1992 to December 1993

Jan 1992 - Dec 1993 Construction Supervisor
Gas Malaysia Sdn Bhd Selangor, Malaysia
• Review, comment and verify contractor's project specifications, procedures and drawings.
• Witness, inspect and verify construction activities.
• Reporting to the Project Manager on schedule and progress.
• WPS, WQT, WPQT witnessing and acceptance inclusive of NDT.
• Liaison with local authorities

Projects involved: Pipeline: * NGDS to HICOM Industrial Estate, Shah Alam.
* NGDS to MCM Sdn Bhd, Shah Alam.
* NGDS to Associated Tiles Works & Best Tile Works, Klang.
* NGDS to Chungwa Picture Tubes, Shah Alam.


Metering Stations: • Engineering and fabrication of District Stations and customers' metering stations.

26 years


Race: Malay
Religion: Islam (Sunni)
National Identity Card No.:
Passport No.: A19338770
Height: 1.83 m
Weight: 85 kg


Present: SAR 20, 000/month (basic)
SAR 5, 000/month (accommodation allowance)
SAR 1, 000/month (transport allowance)

Education

High school or equivalent,
  • at Reliability Expert Center
  • May 2012

May 2012 SABIC/Reliability Expert Center, Jubail Root Cause Analysis Team Leader Course

Diploma, Natural Gas Pipeline Engineering
  • January 1992

Jan. 1992 Tokyo Gas Tsurumi Training Centre, Tokyo, Japan Certificate In Natural Gas Pipeline Engineering

Diploma, Mechanical
  • August 1986

Dec. '85 - Aug. '86 Esso Production Malaysia Inc. Technical Training Centre Kuala Terengganu, Terengganu, Malaysia Offshore Maintenance (Mechanical) Specialist Certificate First Aid Certificate Water Survival Certificate Fire-fighting (Search & Rescue) Certificate

Diploma, Mechanical Engineering
  • at Ungku Omar Polytechnic
  • June 1984

Education/Courses June 1984 Certificate (OND) in Mechanical Engineering, Ungku Omar Polytechnic, Ipoh, Perak, Malaysia

Specialties & Skills

Government
Government Agencies
Installation
Materials
BUSINESS DEVELOPMENT
GAS DISTRIBUTION
HORIZONTAL
MAPPING
NATURAL
PIPELINE
PIPELINE CONSTRUCTION
RESTRUCTURING
UNDERGROUND UTILITY

Languages

Malay
Beginner