Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Mohamed Hosny, Lead Mechanical Construction engineer

Mohamed Hosny

Lead Mechanical Construction engineer·Target Engineering and Construction

United Arab Emirates

Bachelor's degree, mechanical Engineering

Work experience

Total years of experience: 14 years, 10 months

Lead Mechanical Construction engineer

January 2025 - Present

Target Engineering and Construction

Abu Dhabi, United Arab Emirates

January 2025 - Present

Target Engineering and Construction - EPC Contract- UAE, Abu Dhabi
Position: Lead Mechanical Construction Engineer
Project Name: Revamping of polyolefins Units PE4 and PE5
Project Owner: Abu Dhabi Polymers Company (Borouge)
Location: UAE- Abu Dhabi
Project Description: PE4 and PE5 Revamp project shall enable an increase in production capacity by a further 200 KTA.
Project Scope covers Process areas in Brownfield, modification/ replacement of existing mechanical equipment (Reactors, Pumps, Heat exchangers, Hydro cyclone etc.) and resizing of piping systems with tie in connection with the existing systems, provision of new Ethylene compressor package the related auxiliaries systems at PE41/ PE42, purification and product areas

Duties:
− Co-ordination the project interfaces with the Owner and Engineering subcontractor and other contractors.
− Co-ordinate with engineering/procurement team to complete the relative deliverables within its timeline.
− Manage and plan the mechanical construction activities including ( piping, mechanical equipment and steel structure) including interface scheduling for tie-in connections with existing plant.
− Ensure implementation of HSE administrative procedures according to ADNOC WMS (Work Management System) and PTW (Permit to Work) procedures.
− Ensure work execution according to issue for construction drawing, installation manuals and technical documents as per applicable standards and project specifications.
− Ensure conduction the related work inspection as per approved ITP.
− Review / Validating the IFC documents is in line with the project scope of work and specifications.
− Review method statement and risk assessment with its related control measures for construction activity.
− Participate in the risk assessment for shutdown/ isolation activities with the End User operation team.
− Deal troubles occurred during erection according to deviation between Actual Site and design plan.
− Raising site technical queries and initiating field modifications
− Preparing Pressure test package with marked up P&ID and related contents.
− Participation in the construction completion package walk down with clients.

Company industry:
Accounting
Job role:
Oil and Gas

Lead Mechanical Construction Engineer

January 2023 - January 2025

Target Engineering and Construction

Abu Dhabi, United Arab Emirates

January 2023 - January 2025

Target Engineering and Construction - EPC Contract- UAE, Abu Dhabi
Position: Lead Mechanical Construction Engineer
Project Name: Ruwais Fire Water Network Upgrade (NGL & SGP)
Project Owner: AGP (ADNOC GAS PROCESSING)
Location: UAE- Abu Dhabi
Project Description: Ruwais Fire Water Network Upgrade for ADNOC natural gas liquefaction and sulfur granulation plant. The project scope includes engineering, procurement, fabrication, construction, inspection, transportation to the site, installation, testing, pre-commissioning, and commissioning of the facilities. The goal is to overcome frequent failures and improve the integrity, reliability, and maintainability of the fire water network, thereby enhancing the availability of plant operations. This includes the demolition/installation of firewater pumps and the replacement/resizing of pipe sizes according to the hydraulic and velocity study.

Duties:
− Ensure implementation of HSE administrative procedures according to ADNOC WMS (Work Management System) and PTW (Permit to Work) procedures.
− Ensure work execution according to issue for construction drawing, installation manuals and technical documents as per applicable standards and project specifications.
− Review / Validating the IFC documents is in line with the project scope of work and specifications.
− Manage and plan AG/UG piping, mechanical and civil construction activities, including interface scheduling for tie-in connections with existing plant.
− Review method statement and risk assessment with its related control measures for construction activity.
− Participate in the risk assessment for shutdown/ isolation activities with the End User operation team.
− Deal troubles occurred during erection according to deviation between Actual Site and design plan.
− Raising site technical queries and initiating field modifications
− Preparing Pressure test package with marked up P&ID and related contents.
− Participation in the construction completion package walk down with clients.
Pre-commissioning activity
− System conformity & integrity checks
− Pressure test / Post-test component reinstatement activities.
− Lining up the piping system and service leak test

Company industry:
Oil & Gas
Job role:
Oil and Gas

Lead Mechanical Construction Engineer

June 2019 - January 2023

Elsewedy Power ESP

Dubai, United Arab Emirates

June 2019 - January 2023

Elsewedy Power ESP - EPC Contract- UAE, Dubai
Position: Lead Mechanical Construction Engineer
Project Name: Aweer Power Station ‘H’ Phase Iv 815 MW
Project Owner: Dewa (DUBAI ELECTRICITY & WATER AUTHORITY)
Project Consultant: EDF (ELECTRICITÉ DE FRANCE)
Location: UAE- Dubai
Project Description: Elsewedy Power, in joint venture with Siemens, served as the EPC contractor for a simple cycle power plant with a capacity of 815 MW. The project consisted of three SGT5-4000F gas turbines, along with related auxiliaries and balance of plant mechanical systems, including fuel gas, compressed air, closed cooling, service water, demineralized water, and fuel oil. The mechanical works also included tie-ins with the existing plant for fuel gas, diesel fuel oil, and demineralized water.

Duties:
− ensure work execution according to issue for construction drawing, installation manuals and technical documents as per applicable standards and project specifications.
− ensure implementation of HSE administrative procedure according to HSE management plan
− Review method statement and risk assessment for construction activity submitted by subcontractor.
− Supervising and managing subcontractor scope of work Gas turbine (auxiliaries and piping activities) of power block (3XGasTurbine270 MW- SGT5-4000F)
− Supervising subcontractors piping activities of BOP (balance of plant) including interfaces and TIE IN connection with Existing plant.
− Prepare weekly / monthly progress reports, developing subcontractor’s progress according to project schedule.
− Review subcontractors monthly progress invoices.
− Planning of erection sequence as per site conditions.
− Deal troubles occurred during erection according to deviation between Actual Site and design plan.
− Raising site technical queries and initiating field modifications, establishing communications with OEM / Engineering discipline to resolve field issues.
− Cross checking and updating Isometrics, site as built works with P&ID.
− Preparing Pressure test package with marked up P&ID and related contents.
− Participation in the construction completion package walk down with client.

Pre-commissioning activity
− System conformity & integrity checks
− Gas Turbine Oil flushing.
− Pressure test/ Post-test component reinstatement/ Leak test.

Company industry:
Construction & Building
Job role:
Construction and Building

Senior Mechanical Construction Engineer

April 2016 - June 2019

Elsewedy Electric PSP

Beni Suef, Egypt

April 2016 - June 2019

Elsewedy Electric PSP - EPC Contract- Egypt
Position: Senior Mechanical Construction Engineer
Project Name: BENI SUEF 4800 MW COMBINED CYCLE POWER PLANT (FAST TRACK)
Project Owner: UPPER EGYPT ELECTRICITY PRODUCTION COMPANY
Location: Egypt- Beni Suef
Project Description: Elsewedy Electric, in joint venture with Siemens, served as the EPC contractor for a combined cycle power plant with a capacity of 4800 MW. The plant consists of eight SGT5-8000H gas turbines (400 MW each), eight vertical heat recovery steam generators (HRSG) manufactured by Nem, four Siemens SST-5000 steam turbines (400 MW each), and the related auxiliaries and balance of plant mechanical systems, including fuel gas, compressed air, closed cooling, service water, demineralized water, and fuel oil.

Duties:
− Responsible for construction mechanical drawings according to applicable standards, specifications and review method statement and risk assessment for construction activity.
− Supervising and managing subcontractor scope of work for all piping activity fabrication and erection of power block piping of module 4 (2XGasTurbine400 MW - SGT5-8000H), two boilers (VERTICAL HEAT RECOVERY STEAM GENERATION).
− Reviews inspection reports, delivery schedules, installation manuals and technical documents.
− Cross checking and updating Isometrics with Plan & P&ID drawings.
− Supervision of subcontractor's activities developing progress according to project schedule.
− Planning of erection sequence as per site conditions.
− Prepare technical reports (i.e., Non-conformance reports, RFI, Field change document…etc.).
− Deal troubles occurred during erection according to deviation between Actual Site and design plan.
− Establish communications with Design to resolve field problems.
− static equipment erection of generator auxiliary's skids and gas turbine skids
− Supervise overhead crane with capacities (200, 140, 80 ton) installation for turbine building.

Pre-commissioning activity
− System conformity & integrity checks
− Water flushing, Air blowing.
− Pressure test, Post-test component reinstatement of piping systems and Leak test.

Company industry:
Construction & Building
Job role:
Construction and Building

Mechanical Construction Engineer

May 2015 - April 2016

ELSEWEDY ELECTRIC

Damanhur, Egypt

May 2015 - April 2016

Elsewedy Electric PSP - EPC Contract- Egypt
Position: Mechanical Construction Engineer
Project Name: ELMAHMOUDIA 330 MW SIMPLE POWER PLANT (FAST TRACK)
Project Owner: MIDDLE DELTA ELECTRICITY PRODUCTION COMPANY
Location: Egypt- Mahmoudia
Project Description: Elsewedy Electric served as the EPC contractor for a simple cycle power plant with a capacity of 330 MW, consisting of two Ansaldo Energia AE94.2 gas turbines, along with related auxiliaries and balance of plant mechanical systems, including fuel gas, compressed air, closed cooling, service water, demineralized water, and fuel oil.

Duties:
− Responsible for construction mechanical drawings according to applicable standards, specifications, and method statements.
− Supervising all piping activity fabrication and erection of BOP above and underground power piping (Gas turbine 162 MW).
− Cross checking Isometrics with Plan & P&ID drawings.
− Supervision of subcontractor’s activities developing progress according to schedule
− Reviews the project schedule, progress for the mechanical system.
− Planning of erection sequence as per site conditions.
− Deal troubles occurred during fabrication and/or erection according to deviation between Actual Site and design plan.
− Raising site technical queries and initiating field modifications.
− Updating piping isometrics to as-built status.
Pre-commissioning activity
− System conformity & integrity checks
− Water flushing, Air blowing, Pressure test, Leak test.

Company industry:
General Engineering Consultancy
Job role:
Construction and Building

MECHANICAL CONSTRUCTION ENGINEER

February 2015 - May 2015

MEGA CONSTRUCTION AND INDUSTRIES

Damietta, Egypt

February 2015 - May 2015

AND RESPONSIBILITIES:
•Responsible for construction mechanical drawings according to applicable standards, specifications and method statement.
•Supervising all piping activity fabrication and erection of BOP above and underground power piping (Gas turbine 162 MW).
•Supervising plant and building firefighting systems (hydrant, sprinklers, tanks cooling ring).
•Cross checking Isometrics with Plan & P&ID drawings.
•Supervision of subcontractors activities developing progress according to schedule
•Reviews the project schedule, progress for mechanical system
•Planning of erection sequence as per site conditions.
•Deal troubles occurred during fabrication and/or erection according to deviation between Actual Site and design plan
•Raising site technical queries and initiating field modifications.
•Updating piping isometrics to as-built status.
•Piping systems hand over to the owner.
Pre-commissioning activity
•System conformity & integrity checks
•Water flushing, Air blowing,
•Pressure test. Leak test

Company industry:
Construction & Building
Job role:
Engineering

MECHANICAL CONSTRUCTION ENGINEER

December 2013 - February 2015

MARIOUT ENGINEERING AND CONSTRUCTION

Suez, Egypt

December 2013 - February 2015

AND RESPONSIBILITIES:
•Supervising all pipe line activity fabrication and erection of BOP process piping of various materials as (CS, SS, , ALLOY, GRE, HDPE, ……etc
•Responsible for construction drawings according to applicable standards, specifications and method statement.
•Supervision of subcontractors activities developing progress according to schedule
•Reviews the project schedule, progress for all piping system
•Cross checking Isometrics with Plan & P&ID drawings.
•Materials receiving and inspection of piping materials
•Planning of erection sequence as per site conditions.
•Establishes communications with Design to resolve field problems.
•Review and prepare shop drawing and carrying out welding map
•Raising site technical queries and initiating field modifications.
•Updating piping isometrics to as-built status

Pre-commissioning activity
•System conformity & integrity checks
•Water flushing, Air blowing,
•Hydro testing. Leak test

Company industry:
Construction & Building
Job role:
Engineering

PIPING ENGINEER

December 2012 - December 2013

ALhussam Contracting

Suez, Egypt

December 2012 - December 2013

AND RESPONSIBILITIES:
•Supervising all pipe line activity fabrication and erection of steam reformer and product gas heater and co2 removal process unit
•Reviews the project schedule, progress for all piping system
•Materials receiving and inspection of piping materials
•Planning of erection sequence as per site conditions.
•Installation of pipe support, spring hangers and spring support
•Deal troubles occurred during fabrication and/or erection according to deviation between Actual Site and design plan
•Establishes communications with Design to resolve field problems.
•Review and prepare shop drawing and carrying out welding map
•Raising site technical queries and initiating field modifications.
•Updating piping isometrics to as-built status
•Evaluate additional work as manpower, as built inch or as built weight
•Reports weekly installed bill of quantities and prepare monthly invoice.

Company industry:
Civil Engineering
Job role:
Engineering

construction engineer

May 2012 - December 2012

Boston structures engineering& contracting (QATAR

Doha, Qatar

May 2012 - December 2012

• supervise Fabrication and erection of secondary steel substructure for cladding panels
• Plant steel structure work Fabrication and erection of main steel
• Responsible for construction drawings and studies the contract documents and applicable standards or specifications works as per approved drawings and methods and safety rules.
• Deal troubles occurred during fabrication and/or erection according to deviation between Actual Site and design plan
• Provides technical assistance to the Superintendent and keeps them informed on matters relating to quality control.
• Reports weekly installed quantities to the Cost Engineer and prepare monthly invoice.
• manage manpower, tools, equipment, consumables materials and supplies
• Planning of erection sequence as per site conditions.
• Reviews the project schedule, progress as built drawing

Company industry:
Construction & Building
Job role:
Mechanical Engineering

piping engineer

September 2011 - May 2012

• ALHUSSAM CONTRACTING (EGYPT)

Port Said, Egypt

September 2011 - May 2012

• fabrication and erection of large and small bore stainless steel pipes
• Materials receiving inspection of piping materials
• Check progress for all piping system. As built drawing for piping
• Coordinating Shop testing activities

Company industry:
Construction & Building
Job role:
Mechanical Engineering

Education

Faculty of engineering Alexandria University

June 2011

June 2011

Bachelor's degree, mechanical Engineering

Egypt

GPA (percentage): 65%

GPA (percentage): 65%

Skills

AutoCAD

Expert

MATLAB

Expert

MS Project

Expert

Office Work

Expert

Construction Drawings

Expert

CUSTOMER RELATIONS

Expert

DELIVERY

Expert

FAST

Expert

GRAPHIC DESIGN

Expert

MATERIALS MANAGEMENT

Expert

MECHANICAL

Expert

PAINT SHOP PRO

Expert

PROGRESS

Expert

RECEIVING

Expert

RFI

Expert

AutoCAD

Expert

MATLAB

Expert

MS Project

Expert

Office Work

Expert

Construction Drawings

Expert

Languages

Arabic

Expert

English

Expert

Training and Certifications

Certifications
project mangement professional
Jun 2019

Hobbies and interests

foot ball, news shows