Section Engineer
Consolidated Contractors Company - Other Locations
Total years of experience :11 years, 8 Months
Project:- Telecom Egypt New Headquarters plot (21B1-22B1).
https://www.elgabalyarchitects.com/projects/telecom-egypt-we-headquarters-new-capital/
Owner :-Egyptian General Intelligence
Site Area 23397.92 m2
Total Built Area 74406 m2
Total Estimated Cost 2 billion LE
Main Consultant :- GEBAL Consultant
https://www.elgabalyarchitects.com/
Architecture Consultant:- EL GABALY ARCHITECTS. https://www.elgabalyarchitects.com/
Structure Consultant:- AACE Amr Abdelrahman Consultant Engineers. https://aaceconsultants.com/project/wetelecom-headquarters/
Softscape Consultant :-ÖKO PLAN Landscaping
https://www.oekoplan.com/projects/
Project's info
Location NEW CAPITAL
https://idsc.gov.eg/Upload/DocumentLibrary/Attachment_A/5902/10-Egypt%E2%80%99s%20New%20Administrative%20Capital%20City%20(1).pdf
https://www.linkedin.com/in/mohamed-nouby-a89092137
* Dabaa Nuclear Power Planet (DNPP)
Owner:- (Egyptian Nuclear Power Plant Authority), https://nppa.gov.eg/#gsc.tab=0
Engineer: -ECG (https://www.ecgsa.com/), Egypt.
El-Dabaa, Egypt
Location: -In the vicinity of the town of El-Alamein, Egypt
Type of reactor: - VVER-1200
Number of Power Units: - 4
Total Estimated Cost 1 billion USD
General Designer: - Atomenergoproekt, JSC
General Contractor: - JSC AtomStroyExport
Project Manager: - ASE Rosatom
https://ase-ec.ru/en/projects/el-dabaa/
supervise the implementation of; -
-civil activity (Excavation, foundation, embedded plates& anchors, pedestals, Tanks)
- Infrastructure networks (Sewer, Storm, Water supply, Fire Fighting &Irrigation)
- Roads.
-Steel Structure Erection of metal sectors (Frames, Arches, Ladders, Beams, Girders, Pannels)
-Gantry Crane (Backfilling crushed, Compacting, Sleepers, Rails)
- Sandwich Pannels.
Costal Towers Plot LD00 -Core & Shell Project.
https://img.mhuc.gov.eg/images/697a62cd-9aa0-41fe-9d7c-17e4e7804ca3.pdf
(Tower A, B )Podium (4th Floor) + (42) typical floor
Engineer: -ECG (https://www.ecgsa.com/), Egypt.
Project Manager: -New Urban Communities Authorities, http://www.newcities.gov.eg/Default.aspx
Total Estimated Cost 0.75 billion
- Deep Foundation (Piles), Rafts, Columns, RC Walls,
Cores, Traditional Slabs, Post Tension Slabs)
-Facades (Stick Curtain Wall System, Fiber Cement Board Cladding, Marble Cladding)
https://www.hassanallam.com/construction/group-profile/project-details/Alamien-Towers-
Egyptian Presidential Palace: -
Owner: - Egypt's General Intelligence Service
https://www.presidency.eg/ar/%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D8%A7%D9%84%D9%82%D9%88%D9%85%D9%8A%D8%A9/
Engineering: - Elgabaly
https://www.elgabalyarchitects.com/
Project Management: - Ministry of Housing, Utilities &Urban Communities
Total Estimated Cost 0.25 billion LE
(Construction, Fully Finish& Infrastructure) Project.
@ New Alamein City -Marssa Matrouh - Egypt)
SECON Nile Towers Project.
https://www.siac.com.eg/?q=experience-sectors/building/secon-nile-towers-hilton
Owner: -Saudi Egyptian Construction Company (SECON), Egypt
Engineer:
-Space Consultants (Dr. Medhat Dorra), Egypt.
https://spaceconsultants.com/
-EHAF Consultant
https://www.ehaf.com/project/secon-nile-towers-egypt
Project Manager: -Hill International, USA, Egypt.
https://www.hillintl.com/project/secon-nile-towers/
Description
Turnkey construction of 2 towers.
The towers are composed of 3 common basements, a common ground floor and 22 floors. Total built-up area is 105, 000m2. The first tower is a 5 stars hotel (Hilton) comprises 256 rooms.
The second tower is a residential tower comprises 114 hotel apartments. Contract includes civil works, architectural works, finishing works, MEP works & landscaping.
The contractor is JV comprises Arabtec 55% (leader) and SIAC 45%.
The contract is on re-measure basis.
Yadama Secondary School
http://www.e-najran.gov.sa/NajranCities.html
Owner: Ministry Of Education
https://www.my.gov.sa/wps/portal/snp/agencies/AC163
ُ
Engineering :- Educational Buildings Authority
https://www.moe.gov.sa/en/Pages/default.aspx
Construction, Turnkey, Fully Finish & Infrastructure Project.
MIVIDA Compound .
https://www.emaarmisr.com/ar/our-communities/mivida/
PKJ88 -Infrastructure Project For:-
PKJ67+PKJ68 https://www.emaarmisr.com/ar/properties/greensii/
Owner :- EMAAR Misr
Engineering :- ACE, EHAF, ABCG
https://ace-mb.com/
https://www.ehaf.com/
http://www.activebrains.net/tourist.htm
Nile Rirze Carlton Hotel.
https://www.ritzcarlton.com/en/hotels/cairz-the-nile-ritz-carlton-cairo/overview/
https://www.hillintl.com/project/the-nile-ritz-carlton/
Renovation Project.
Owner:- Misr Hotel
https://www.misrhotels.com.eg/
Engineering:- EHAF Consultant
https://www.ehaf.com/project/nile-ritz-egypt
Project Management :-
Hill International
https://www.hillintl.com/project/the-nile-ritz-carlton/
The project is to bring about total renovation for
the existing (former Nile Hilton) building to
incorporate the standards of Ritz Carlton as to
operate the 64, 000 m2 hotel and its 331 rooms,
swimming pool, water features, Spa, and Casino.
scope of work includes:
Architectural interior and exterior finishes.
Landscape (excluding related mechanical and electrical works).
Swimming pools and water features.
Architectural supervision over spa and casino
Signage.
Installation of Furniture, Fixture and Equipment
as per the books provided by ID consultant.
Civil departement Courses Highway Structure Steel structure Sanitry Raods Navigatoin Concrete Transportation Infrastructure Water supply Construction Design
URL removed due to policy violation. Please contact support for further information.