mohamed noby hassab el naby, Section Engineer

mohamed noby hassab el naby

Section Engineer

Consolidated Contractors Company - Other Locations

Location
Egypt
Education
Bachelor's degree, civil engineer
Experience
11 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 8 Months

Section Engineer at Consolidated Contractors Company - Other Locations
  • Egypt - Cairo
  • My current job since January 2023

Project:- Telecom Egypt New Headquarters plot (21B1-22B1).

https://www.elgabalyarchitects.com/projects/telecom-egypt-we-headquarters-new-capital/


Owner :-Egyptian General Intelligence

Site Area 23397.92 m2

Total Built Area 74406 m2

Total Estimated Cost 2 billion LE



Main Consultant :- GEBAL Consultant
https://www.elgabalyarchitects.com/

Architecture Consultant:- EL GABALY ARCHITECTS. https://www.elgabalyarchitects.com/

Structure Consultant:- AACE Amr Abdelrahman Consultant Engineers. https://aaceconsultants.com/project/wetelecom-headquarters/

Softscape Consultant :-ÖKO PLAN Landscaping
https://www.oekoplan.com/projects/
Project's info

Location NEW CAPITAL
https://idsc.gov.eg/Upload/DocumentLibrary/Attachment_A/5902/10-Egypt%E2%80%99s%20New%20Administrative%20Capital%20City%20(1).pdf


https://www.linkedin.com/in/mohamed-nouby-a89092137

Construction Engineer at Hassan Allam Construction
  • Egypt - Marsa Matruh
  • September 2020 to December 2022

* Dabaa Nuclear Power Planet (DNPP)

Owner:- (Egyptian Nuclear Power Plant Authority), https://nppa.gov.eg/#gsc.tab=0

Engineer: -ECG (https://www.ecgsa.com/), Egypt.

El-Dabaa, Egypt

Location: -In the vicinity of the town of El-Alamein, Egypt

Type of reactor: - VVER-1200

Number of Power Units: - 4

Total Estimated Cost 1 billion USD

General Designer: - Atomenergoproekt, JSC

General Contractor: - JSC AtomStroyExport

Project Manager: - ASE Rosatom
https://ase-ec.ru/en/projects/el-dabaa/

supervise the implementation of; -

-civil activity (Excavation, foundation, embedded plates& anchors, pedestals, Tanks)

- Infrastructure networks (Sewer, Storm, Water supply, Fire Fighting &Irrigation)

- Roads.

-Steel Structure Erection of metal sectors (Frames, Arches, Ladders, Beams, Girders, Pannels)

-Gantry Crane (Backfilling crushed, Compacting, Sleepers, Rails)

- Sandwich Pannels.

Senior Site Engineer at Hassan Allam Construction
  • Egypt - Al Alamayn
  • September 2019 to September 2020

Costal Towers Plot LD00 -Core & Shell Project.
https://img.mhuc.gov.eg/images/697a62cd-9aa0-41fe-9d7c-17e4e7804ca3.pdf

(Tower A, B )Podium (4th Floor) + (42) typical floor

Engineer: -ECG (https://www.ecgsa.com/), Egypt.

Project Manager: -New Urban Communities Authorities, http://www.newcities.gov.eg/Default.aspx

Total Estimated Cost 0.75 billion

- Deep Foundation (Piles), Rafts, Columns, RC Walls,

Cores, Traditional Slabs, Post Tension Slabs)

-Facades (Stick Curtain Wall System, Fiber Cement Board Cladding, Marble Cladding)

https://www.hassanallam.com/construction/group-profile/project-details/Alamien-Towers-

Senior site engineer at Hassan Allam Construction
  • Egypt - Al Alamayn
  • September 2017 to September 2019

Egyptian Presidential Palace: -

Owner: - Egypt's General Intelligence Service
https://www.presidency.eg/ar/%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D8%A7%D9%84%D9%82%D9%88%D9%85%D9%8A%D8%A9/

Engineering: - Elgabaly
https://www.elgabalyarchitects.com/

Project Management: - Ministry of Housing, Utilities &Urban Communities

Total Estimated Cost 0.25 billion LE

(Construction, Fully Finish& Infrastructure) Project.

@ New Alamein City -Marssa Matrouh - Egypt)

Site Engineer at SIAC Holding. JV. Arabtec.
  • Egypt - Cairo
  • October 2016 to September 2017

SECON Nile Towers Project.

https://www.siac.com.eg/?q=experience-sectors/building/secon-nile-towers-hilton

Owner: -Saudi Egyptian Construction Company (SECON), Egypt


Engineer:
-Space Consultants (Dr. Medhat Dorra), Egypt.
https://spaceconsultants.com/

-EHAF Consultant
https://www.ehaf.com/project/secon-nile-towers-egypt

Project Manager: -Hill International, USA, Egypt.
https://www.hillintl.com/project/secon-nile-towers/

Description
Turnkey construction of 2 towers.
The towers are composed of 3 common basements, a common ground floor and 22 floors. Total built-up area is 105, 000m2. The first tower is a 5 stars hotel (Hilton) comprises 256 rooms.
The second tower is a residential tower comprises 114 hotel apartments. Contract includes civil works, architectural works, finishing works, MEP works & landscaping.

The contractor is JV comprises Arabtec 55% (leader) and SIAC 45%.

The contract is on re-measure basis.

Site Engineer - QC Engineer at Aal Hokash Construction
  • Saudi Arabia - Najran
  • October 2015 to October 2016

Yadama Secondary School
http://www.e-najran.gov.sa/NajranCities.html

Owner: Ministry Of Education
https://www.my.gov.sa/wps/portal/snp/agencies/AC163
ُ
Engineering :- Educational Buildings Authority

https://www.moe.gov.sa/en/Pages/default.aspx

Construction, Turnkey, Fully Finish & Infrastructure Project.

Quality Control Engineer at Arabin Construction Company .ACC
  • Egypt - Cairo
  • September 2014 to October 2015

MIVIDA Compound .
https://www.emaarmisr.com/ar/our-communities/mivida/

PKJ88 -Infrastructure Project For:-
PKJ67+PKJ68 https://www.emaarmisr.com/ar/properties/greensii/

Owner :- EMAAR Misr

Engineering :- ACE, EHAF, ABCG
https://ace-mb.com/
https://www.ehaf.com/
http://www.activebrains.net/tourist.htm

Site Engineer at Arabian Construction Company . ACC
  • Egypt - Cairo
  • September 2012 to September 2014

Nile Rirze Carlton Hotel.
https://www.ritzcarlton.com/en/hotels/cairz-the-nile-ritz-carlton-cairo/overview/

https://www.hillintl.com/project/the-nile-ritz-carlton/
Renovation Project.

Owner:- Misr Hotel
https://www.misrhotels.com.eg/

Engineering:- EHAF Consultant
https://www.ehaf.com/project/nile-ritz-egypt

Project Management :-
Hill International
https://www.hillintl.com/project/the-nile-ritz-carlton/

The project is to bring about total renovation for

the existing (former Nile Hilton) building to

incorporate the standards of Ritz Carlton as to

operate the 64, 000 m2 hotel and its 331 rooms,

swimming pool, water features, Spa, and Casino.

scope of work includes:

Architectural interior and exterior finishes.

Landscape (excluding related mechanical and electrical works).

Swimming pools and water features.

Architectural supervision over spa and casino

Signage.

Installation of Furniture, Fixture and Equipment

as per the books provided by ID consultant.

Education

Bachelor's degree, civil engineer
  • at Aswan University
  • June 2012

Civil departement Courses Highway Structure Steel structure Sanitry Raods Navigatoin Concrete Transportation Infrastructure Water supply Construction Design

Specialties & Skills

Steel Structures
Foundations
Consultant Coordination
Infrastructure
Construction
computer windows , word . exel , autucad 2d, sap 200.
AUTOCAD 2D
Civil 3d
Project Mangement
Shop Drawing
structural
project supervision
Construction
civil engineer
Site Engineering
Microsoft Office
Production
Management
Civil Engineering
AutoCAD
Engineering
Testing
Project Management
Installation
Maintenance Engineering
Project Work
Quality Assurance
Project Planning
Engineering Management
Project Estimation
planning
materials
procurement
ms project
residential
primavera
construction design
quantity surveying
project execution
plan execution
surveying
on site
structural engineers
problem solving
primavera p6

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.



Languages

English
Expert

Memberships

Resalaa
  • Support Engineer
  • March 2013
Egyptian Engineers Syndicate
  • Member of the General Assembly
  • August 2012

Training and Certifications

Cvil 3d (Training)
Training Institute:
Cad Master Academy
Date Attended:
March 2017
Duration:
48 hours
PMP (Training)
Training Institute:
Ain Shams univercity
Date Attended:
September 2017
Duration:
350 hours

Hobbies

  • Reading
    224book