Works Unit Director
Seaal (society of algeria water)
Total years of experience :14 years, 5 Months
1- Realization of new sanitation and drinking water connections paid by subscribers
2- Realization of extensions for the benefit of external establishments whose characteristics are
2.5Km in DN 160 HDPE and 800 ML in DN 400 PVC while respecting the execution deadlines
3- Monitoring the availability of all means for carrying out major works
4- Elaboration of intervention schedules on the feeders in collaboration with the production
departments
5- Monitoring compliance with health and safety conditions by respecting the number of
managerial safety visits to various work sites
1- In charge of the management of a multidisciplinary team whose objective is to meet the
challenge of the indicators drawn up by the general management, namely:
2- Optimization of physical losses of the drinking water network as part of the ENF project
3- Management of the project for the regulation of the chain of heights supply network in the west
of the city of Algiers with the assistance of experts from the suez environnement, this project
consisted of installing 39 regulation valves as well as the realization of their shelters, we were in
charge of the planning, the supply of the special parts, the follow-up of the evolution of the
realizations in reference of the planning to elaborate on the software MS-PROJECT
4- Connection of drinking water networks as part of the provision of services for the benefit of
establishments and external organizations
5- Valuation of the work by making attachments for the benefit of our customers, whether internal
or external, for all types of services provided
6- Monitoring of performance indicators and balancing the activities of the intervention teams
according to the achievement of the objectives set
7- 7- Continuous improvement in the optimization of human and material resources for better
responsiveness in day-to-day management
1- Renewal works of drinking water networks and connections by internal teams in the perimeter
of Algiers and Tipaza
2- Contribution to improving the performance of the drinking water network in Algiers and Tipaza,
with the installation of several pressure stabilizers, modulation valve and althemetric valves
3- Installation and renewal of strategic valves as part of the sectorization of the drinking water
network
4- Repair of large diameter leaks in the drinking water production network
5- Realization of extensions paid by subscribers
6- Management of intervention teams for the repair of leaks greater than 300 mm in the context
of on-call and emergency
In charge of the operation of the sanitation network in the perimeter of Algiers, namely:
2- Follow-up of the systematic clogging campaign of the sanitation network b- Development of the
preventive program for cleaning, whether manual or hydrodynamic, according to the fouling
rate results
3- Study the cases of rupture of the sanitation network according to multi-criteria tables for a
renewal plan for the sanitation networks and connections
4- Raising of manholes in the curative and preventive framework for possible cleaning, with the
use of resin rehabilitation technique
5- e- Management of two teams made up of drivers, team leaders and cleaning agents
6- f- Participation in the consultation and call for tenders of subcontractors for the management
of renewals of the sanitation network
7- g- Team management for the programming and dispatching of hydro cleaning trucks
8- h- Development of monthly dashboard
9- Participation in the meeting with the heads of the water management, the heads of the daïra
and the presidents of the popular assembly
10- j- Elimination of several black spots in the region of Algiers, which arise in the winter period
11- k- Follow-up of customer complaints with the X7 software, and their support