QA/QC electrical engineer
saudi benladen group
Total years of experience :16 years, 2 Months
Ensure all electrical works implementing according to approved drawings and project technical specifications.
• Monitor and inspection of material received at site with approved submittal.
• Prepare ITP for different electrical works.
• Prepare QA/QC weekly report.
• Weekly and monthly meetings are conducting regarding quality for client satisfaction.
• Preparation of lighting and power design
• Preparation of voltage drop and short circuit calculations
• Preparation of panel schedule calculations
• Sizing of cables, transformer and generator
• Quantity surveying to prepare BOQ
• Pricing of BOQ
• Inspection to all electrical activities on site
• Review and approve As Built drawings
• Issue Site observation , site instruction and NCR
Read carefully the bid documents.
• Quantity survey (Electrical items).
• Check the design drawings and specifications compatibility with the requirements.
• Visit construction site to study access, availability of utilities, etc
• Determine materials needed.
• Estimating the cost of the material by getting price quotations from suppliers
and/or subcontractors.
• Comparing the received offers.
• Break down and estimate the cost related to the project.
• prepare financial and technical envelopes
Responsible for implementations and monitoring of electrical works at site such as (LV cables, lighting poles, pillars and earthing system)
• Manages directly and provide engineering and technical supports to all the electrical work groups at site
• Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups.
• Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
• Ensures that all site works are done according to all applicable quality standards.
• Read carefully the bid documents.
• Quantity survey (Electrical items)
• Check the design drawings and specifications compatibility with the requirements
• Visit construction site to study access, availability of utilities, etc
• Determine materials needed
• Estimating the cost of the material by getting price quotations from suppliers
and/or subcontractors.
• Comparing the received offers.
• Break down and estimate the cost related to the project
• prepare financial and technical envelopes
• Installation of Motor Control Center
Thesis title: Modeling and transient analysis of capacitor switching connected to electrical wind turbine system using simulink software
Cumulative grade: Good Fourth year grade : Very Good Graduation project: Electrical Design for Hyper One Graduation project grade : Excellent Project outline • Design of single line diagram • Feeding system selection • Voltage drop calculations for cables • Voltage drop calculations for bus bars • Short circuit calculations for cables • Power factor corrections calculations • Design of distribution boards • Design of lighting and sockets • Short circuit calculations for bus bars • Design of fire alarm • Grounding • Load estimation
project: Electrical Design for hyper one