MEP coordinator
Six construct
Total years of experience :17 years, 5 Months
Review of all material submittals and shop drawings and follow up the approval with the consultant.
Reading electrical design specifications and technical drawings.
Making sure all electrical engineering projects are fit for purpose.
Follow up and make sure all design release implemented on shop drawings.
Preparation of Electrical procedures for installation test & commissioning.
Organizing routine servicing schedules.
Preparation of all program schedules.
Leading a team of engineers for successful completion of the project.
Site coordination with inter departments clients/owner, consultant.
Timely and successful implementation of project targets and values, achievements as the pre planned program.
Project planning and management from inception (design) to testing and commissioning
Liaison with clients, consultants and local authority for effective implementation of project activities to the highest standards and to the utmost satisfaction of the management.
Monitoring program, shop drawing and material submittals.
Review and approval of designs, drawings, standard and specifications, B.O.Q s, work.
Liaison with other depts. and local authorities (Electricity and Water authority,
CCAD) is world-class healthcare and one of the largest and most respected hospitals in UAE, along with comprehensive diagnostic facilities and treatments, will ensure that Cleveland Clinic Abu Dhabi provides the very best in medical care for the UAE and the region.
leading team of MEP engineers for all MEP final fix activities such as lighting, power, ELV, HVAC and sanitary ware
-Coordinating with the Road and Transport Authority (RTA), Consultants, and Subcontractors for E&M Over ground Stations.
-Reviewed E&M, Architectural, Structural Drawings and Specifications.
- Site Inspection and Monitoring of E&M over ground Metro-rail Station.
- Coordinating the daily activities of project staff, construction trades and subcontractors, and taking corrective action to keep the project on time for all the following systems
Working Field: -
Supervision and inspection the following works:
A - The power distribution system:-
Design and executing control circuits for production machines.
Install and adjust the setting of variable frequency drive such as ABB, Control Technique.
Working with wieshaupt burners all versions.
Earthling and Lightning Protection System.
from the department