Total Years of Experience: 17 Years, 0 Months
March 2018
To December 2020
Lead Civil Design Coordinator
at Ge Grid Solutions
Location :
United Arab Emirates - Dubai
400/132kV Canal Gardens Substation with Client - DEWA & Consultant - Energo (TED Code - 2004)
N-14324.1 Provision of New 500MVA, 400/220/33kV at Mussafah Grid station Client - Transco / Consultant - EDF
Responsible for Civil and Structural Design, Review & Coordination with Primary Engineering, Civil design Consultant & MEP discipline, internal cross-functional teams for substation projects
N-14324.1 Provision of New 500MVA, 400/220/33kV at Mussafah Grid station Client - Transco / Consultant - EDF
Responsible for Civil and Structural Design, Review & Coordination with Primary Engineering, Civil design Consultant & MEP discipline, internal cross-functional teams for substation projects
January 2016
To January 2018
Lead Civil Design Coordinator
at GE Power Grid
Location :
Saudi Arabia
Balgaran Package (132/33kV 4nos Substations plus Remote end works with Client - NG (South) Saudi Arabia.
Jizan Aramco (132/33kV 2nos Substations Jizan region-14months) with Client - Aramco & NG (South) Saudi
Arabia.
• Avoided Stone Column recommendations in geotechnical report .
• Provided road base layers and gain 3 months for Soil investigation.
• Finalized the framing system in equipment layout to reduce further time consumption by design consultant.
• 400kV S/S plot Boundary wall depth reduced on 2 sides to enhance profit margin on civil works.
• On time delivery - Achieved Sales target for design and site execution.
Page 2 of 3
Key Achievements:
• Execution of structures in existing live substations.
• Challenging to fix arrangement of Gantry, GIB, outdoor foundations, trenches in existing live 380kV substations.
• Made special foundation arrangements for extension of Swgr bldg due to existing power cable / control cables on the
extension path.
• Successfully completed these critical works at site without time and cost impact
Lead Civil Design-
Jizan Aramco (132/33kV 2nos Substations Jizan region-14months) with Client - Aramco & NG (South) Saudi
Arabia.
• Avoided Stone Column recommendations in geotechnical report .
• Provided road base layers and gain 3 months for Soil investigation.
• Finalized the framing system in equipment layout to reduce further time consumption by design consultant.
• 400kV S/S plot Boundary wall depth reduced on 2 sides to enhance profit margin on civil works.
• On time delivery - Achieved Sales target for design and site execution.
Page 2 of 3
Key Achievements:
• Execution of structures in existing live substations.
• Challenging to fix arrangement of Gantry, GIB, outdoor foundations, trenches in existing live 380kV substations.
• Made special foundation arrangements for extension of Swgr bldg due to existing power cable / control cables on the
extension path.
• Successfully completed these critical works at site without time and cost impact
Lead Civil Design-
January 2012
To January 2015
Design Co-ordinator
at Alstom Power Grid
Location :
United Arab Emirates
400/132/33kV BAB & 220kV ASAB with TRANSCO Abu Dhabi
Key Achievements:
• Water proofing membrane excluded for the basement wall.
Key Achievements:
• Water proofing membrane excluded for the basement wall.
January 2011
To January 2012
Civil Design Engineer
at Alstom Power Grid
Location :
Saudi Arabia
110/13.8kV, 132/13.8kV - Power Factor Correction for 44nos Substations (Switchgear/GIS Building Extensions
and Capacitor foundations on existing substations) with National Grid (South) KSA
and Capacitor foundations on existing substations) with National Grid (South) KSA
January 2009
To January 2011
Material Co-Ordinator
at Areva T&D
Location :
United Arab Emirates
January 2004
To January 2009
Design Coordinator
at ETA