MEP Project Manager
Arabtec Construction LLC
Total years of experience :20 years, 10 Months
Tasks:
• MEP/ELV subcontractors Pre-qualification, approval & submittal
• MEP/ ELV Value Engineering Proposal/ review
• Design & Shop-drawing / RFI submittal/Approval review & Verification
• Material Submittal review, procurement and Delivery on site
• MEP Subcontractors Management (Progress control & achievements)
• Supervision/control MEP/ELV Installations, Testing/Commissioning:
Electrical & ELV:
1. Switchgear installation, cabling termination, testing/Commissioning
2. Wiring & cabling for final DBs & final Circuitry (Power & Lighting)
3. Bus-Bar Riser system installation, testing & commissioning
4. Energy Meters (kWhr Meter) installation and Commissioning.
5. Fire Alarm & Public Address Design, Installations & Commissioning.
6. Central Battery System for Emergency
7. Security Systems (CCTV, Access Control) Design, test/ Commissioning
8. BMS, HVAC Control, KNX Automation & Light Control systems
9. DATA & Telephone Structured Cabling design Installation.
Mechanical (HVAC & Plumbing)
1. HVAC ducts, FCU installation, Chilled Water systems, etc.
2. Fire-Fighting System installations including the FHR Cabinets riser, Sprinkler System, Fire Pump and FM200 for Telecom Rooms
3. Water Supply & Drainage System
• SPECs, List of Approved Material review and compliance assurance
• BOQ & Payment Certificate, billing reviews and Variation Order Control
• Authorities Handing Over: (Electricity, Water utility Providers, Telecom, Civil Defense and Municipality Permits & Completion Certificates)
Projects:
Martyrs’ Families Villas Project, 100 Villas - UAE
A. Low Current Systems Solutions (KNX Controls, CCTV, Building Automation, Access Control, Fire Alarm, Public Address, SMATV, Structured Cabling, )
• Business development, marketing, planning and sales team management.
• Brand selection, business case study and procurement.
• KNX controls design, programming, and system integration
B. MEP/ELV Supervision & Consultancy
• Generate and follow up MEP/ELV contractors progress, execution quality control
• Payment certification
• MEP meeting management
• Material Technical submittal Offer study.
• Value engineering studies initiative.
Tasks:
• MEP/ELV subcontractors Pre-qualification r, approval & submittal
• MEP/ ELV Value Engineering Proposal/ review
• Shop-drawing / RFI submittal/Approval
• Material Submittal/Approval
• MEP Subcontractors Management (Progress control & achievements)
• Supervision/control MEP/ELV Installations, Testing/Commissioning:
Electrical & ELV:
1. Switchgear installation, cabling termination, testing/Commissioning
2. Wiring & cabling for final DBs & final Circuitry (Power & Lighting)
3. Bus-Bar Riser system installation, testing & commissioning
4. Energy Meters (kWhr Meter) installation and Commissioning.
5. Fire Alarm & Public Address Design, Installations & Commissioning.
6. Central Battery System for Emergency
7. Security Systems (CCTV, Access Control) Design, test/ Commissioning
8. BMS, HVAC Control, KNX Automation & Light Control systems
9. DATA & Telephone Structured Cabling design Installation.
Mechanical:
1. AC ducts, FCU installation, Chilled Water systems, etc.
2. Fire-Fighting System installations including the FHR Cabinets riser, Sprinkler System, Fire Pump and FM200 for Telecom Rooms
3. Water Supply & Drainage System
• SPECs, List of Approved Material review and compliance assurance
• BOQ & Payment Certificate, billing reviews and Variation Order Control
• Authorities Handing Over: (Electricity, Water utility Providers, Telecom, Civil Defense and Municipality Permits & Completion Certificates)
A- AC mains Power Engineer following:
1. Generate and Approve Electrical Designs, MDBs, Load Schedules, Single Line diagrams for Electrical installations inside the GSM site (BSC, BTS and Micro sites) in addition to all types of electrical installatiosn inside the Shelters.
2. Sites inspections prior to DEWA inspection to make sure that all installations are as per DEWA Requirments, in addition to attending DEWA sites inspections.
3. Handle all progress Power meetings & high level reporting using Exel (with Subcontractors, with Operator, and higher Meetings with Authorities (espicially DEWA)
4. Raising Commercial Change Requests for Extra-work (Variation Orders) for Power installtions for customer(dU) approval, Cabling from DEWA power source to the site and any work, then request for PO (Purchase Order) for subcontractors against Extra-work POs received from Customer. And finally Chasing customer for signing the PAT, PAC and FAC documenst for Extra-work (CR) POs.
5. Raising Technical Change Requests for dU Operations approvals in order to achieve the power changes within shelters for on-Air sites.
B- DC Power Engineer following:
1. DC Power installation for Core sites
2. DC Power calculations as per the DC power consumptions
3. determine the heat dissipation for DC equipments
• Electrical Design Engineering
• Local Authorities Coordination
Achievement:
1. Obtain Final Authorities Permits for 50+ Projects
2. Produce Technical Manual for Authorities Approvals Procedure
Tasks:
• Being a Project coordination eng. responsible for distributing labors, material on site( procurement, comparing suppliers, material requisition as per project SPECs)
• submittals of materials, shop drawings, proposals for consultant approval
• implement shop drawings as per project SPECs & DEWA/ADDC/AADC regulation
• labors productivity on site follow up & arrangement as per project PIP, assure that the excution on site is as per Athorities requirements.
• assure that the fire alarm system subcontractor excution on site is as per Civil defense requirement
• Being responsible for monthly payment submittals
• cost estimation and and procurement for electrical work high rise buildings
Project:
1. Discovery Gardens (33 BLDGs: G+7 Residential)
2. International City Project (34 BLDGs: G+4 Residential)
Tasks:
• Site Electrical Engineer Duties
Project:
1. Burkush Villas /Royal Court buildings
2. Private Offices (Royal Court Buildings)