Civil Inspector
AL-AMR GROUP CO
Total years of experience :9 years, 4 Months
TREATMENT IMPLEMENTATION OF CONNECTIONS IN RIYADH AL MUZAHMIYAH.
ACADEMIC DATA
KHATIB & ALAMI
PROJECT
1- Elevated Water Tank (Base Structure / Super Structure)
2- Drinking Water Pipeline (Base Structure / Super Structure)
MAJIL ENGINEERING CONSULTANT
PROJECT
1- ELEVATED WATER TANK
2- SEWAGE PIPELINE 200mm, 150mm
(Base Structure / Super Structure)
KARKON PVT LTD ENGINEERING AND CONSTRUCTORS
PROJECT
1- DUCTILE PIPELINE 300mm, 400mm
Osha
Iosh General Industry Safety & Health
General Industry Safety & Health 2015
2015
The Project of completing the reuse of Wastewater Treatment
implementation of connections in Riyadh Al Muzahimiyah .
Managing construction projects.
Responsible for the inspection of all kind of civil work (Base structure & Super
Structure and finishing works)
Report to the Senior Engineer with respect to daily progress and activities
Responsible for the implementation of the Company’s quality plan within his
contracts, covering both the implementation and the follow-up.
Control measurement of contractors work and check of quantities and cross
sections.
Ensure site safety requirements
During the execution of the project, checking that the contractor is performing its
works with approved documentation (Shop drawings, Materials, Subcontractors,
Method of Statement, Quality Plan, formats, etc).
Preparing Compressive strength of concrete test (Cube test) and verifying test result.
Verifying Daily, Weekly and Monthly Report submitted by the contractor.
Verifying the MIR’s submitted by the contractor
Sketch for different types of structural work by using Auto Cad software Verifying
contractors’ monthly bill.
Consultant On Project
Elevated Water Tank.
Responsibility
Check approved drawing.
Check excavation according to Specification.
Check Main wholes and IC.
Check sub Base layers.
Check asphalting of excavation.
Responsible for Concrete reinforcement concrete
& also valves & incasement.
Responsible for Daily, Weekly, Monthly Report.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Responsible for Site Safety.
Responsible for Check Pipe.
Responsible for Excavation according to specification.
Check work approved Drawing.
Responsibility for Sub Base Backfilling.
Responsible of GTC & Sand Cone Method.
Responsible of Compression Test 7 Days, 14 Days, & 28 Days.
Responsible of Chamber Construction.
Responsible of daily, Weekly, and Monthly report.
Responsible for aspalting of Excavation, MC1, RC2
& asphalting Test.
courses: Technical Board Peshawar
from 15 year I am working with consultant engineering companies in Saudi Arabia