Mohammad tariq, Senior Pipeline Engineer

Mohammad tariq

Senior Pipeline Engineer

DODSAL & COMPANY

Location
Saudi Arabia - Yanbu
Education
Master's degree, Pipeline Engg
Experience
13 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 2 Months

Senior Pipeline Engineer at DODSAL & COMPANY
  • Saudi Arabia - Eastern Province
  • My current job since December 2014

Loop-2 and 56” KAEC Pipeline Project, KSA
Project Description: This project involves the following:
* EWG-2 pipeline Section III is approximately 191 km; KM 65.00 to Rabigh-II Pipeline is approximately 156 km.
and KM 142.00 to KAEC Pipeline is approximately 11.5 KM major facilities and equipment include;
* Scraper Launcher and Receiver
* Mainline valve stations
* Jump over from existing pipeline
* Hot Tapping
* Providing new Burn Pits for scraper traps and valve stations
* New RTU shall be provided for communication
Responsibility:
* Working as a Lead engineer- Pipeline
* Coordination with engineering sub- contractor
* Construction Support
* Resolving site queries
* Resolving interface issue with other contractors.
* Package preparation for obtaining the approvals from Interface departments
* Handling change order
* Discussion with Client on technical issues.

Senior Pipeline Engineer at SNC Lavalin
  • India
  • April 2014 to November 2014
Pipeline Engineer at JP Kenny
  • United Arab Emirates
  • November 2010 to October 2011

7. Project - Insalah Southern Gas Fields Project - Algeria
Project Description: This project involves the following pipeline configurations:
* Detail engineering for the development of four gas fields development which includes extensive use of wide
range of materials which includes both Sour and Non-sour service. The project covers various diameters like
16”, 24” and 32 inch and various Scraper launching and receiving facilities.
Responsibility:
* Material Specification, Technical Bids, Vendor Drawing Reviews for Long lead items for Pipeline
* General arrangement drawings, Station approach drawings, Alignment sheet, Isometrics.
8. Project - Supply of Gas to New Al Ain cement Plant for Arkan, UAE
Project Description: This project involves the following pipeline configurations:
* FEED and Detailed Engineering for 20” Sales Gas pipeline of 50km length with Block valves station &
terminal facilities at both ends of the pipeline
Responsibility:
* Material Specification, Technical Bids, Vendor Drawing Reviews for Long lead items for Pipeline
* Stress Analysis
* General arrangement drawings, Station approach drawings, Alignment sheet, Isometrics.
* Material Take Off
9. Project - Crude Oil Export Facility Reconstruction Project, IRAQ
Project Description: This project involves the following pipeline configurations:
* Pre-bid Engineering for new 48" pipeline, two valve station platforms and one SPM buoy. The loading line is
anticipated to be 48" diameter and approximately 71km long in total length, in which 8km of length on the
onshore block and 63km is at the offshore block.
Responsibility:
* Preliminary Pipeline Mechanical Design Calculation
* Material Specification, General arrangement drawings and Material Take Off

Pipeline Engineer at Jacobs Zate
  • Saudi Arabia
  • November 2011 to April 2011
Pipeline Engineer at Worley Parsons
  • Oman
  • November 2008 to November 2010
Project at MAKAREM EWT Project, British Petroleum (BP)
  • January 2010 to

This project involves the following pipeline configurations:
* Individual Wellheads (6 Nos.). 10” Flow Lines from the individual wellheads routed to the Compression
Facility through a 20” Flow line Header. A 12” export gas pipeline for transporting compressed gas from the
Sweet gas compression facility to BP Receiving facilities. A 4” gross liquid pipeline for transporting gross
liquids (condensate/water) from the Sweet gas compression facility to BP Receiving facilities.
Responsibility:
* Stress Analysis
* Plot plans, General arrangement drawings, Station approach drawings, Alignment sheet, Isometrics.
* Material Take Off
* Construction supports
* Study performed on CAESAR II 5.0 for the High Temperature Pipelines to control the expansion and
stresses on pipeline.
11. Project - FEED + DD for 12 inch Gas Pipeline from SNGTP to QAPS, Oman
Project Description: The project consists of
MOHAMMAD TARIQ
Senior Engineer- Pipelines
(Oil & Gas Industry)
Resume
DATED : 20 MAY, 2017 Page 4
* A 21 km, 12” 600# gas pipeline from the manifold on SOGL at SNGTP to QAPS for supplying fuel gas to a
new power plant under execution. at SNGTP with permanent pig trap facility.
Responsibility:
* Route Selection and Site visits
* Design Review meetings, Hazop and QRA meetings
* Mechanical Design calculation of Pipelines
* Material Specification, Technical Bids, Vendor Drawing Review for Long lead items for Pipeline
* Stress Analysis
* Plot plans, General arrangement drawings, Station approach drawings, Alignment sheet, Isometrics
* Material Take Off
* Construction supports
12. Project - Nimr Sludge Pits System Upgrade - FEED/ DD, Oman
Project Description: The project consists of
* To transfer the oil via new 6 inch - CL 300# CS PE-Lined, 3.5 km long Pipeline with Permanent Pig traps
facility to get rid of many trucks that are transferring the oil from Nimr Sludge Pit to NRPS, and to resolve
many HSE and operational problems.
Responsibility:
* Route Selection and Site visits
* Design Review meetings, Hazop and QRA meetings
* Mechanical Design calculation of Pipelines
* Material Specification, Technical Bids, Vendor Drawing Review for Long lead items for Pipeline
* Stress Analysis
* Plot plans, General arrangement drawings, Station approach drawings, Alignment sheet, Isometrics.
13. Project - Replacement of the kicker line at Sahmah Pig Receiver, Oman
Project Description: The project consists of
* During the regular routine inspection on the MOL-7 Hubara - Sahama (Km 140 approx) Receiver it was
noticed that the thickness of kicker line is reduced due to corrosion and hence it is required to be replaced.
Existing kicker line to be replaced by new kicker line along with new valve and drain line required for the
Kicker line. Supports design for the Kicker line and drain line.
Responsibility:
* Site visits
* Material Specifications, Technical Bid Analysis, and Vendor Drawing Reviews
* Stress Analysis
* Plot plans, General arrangement drawings, Station approach drawings, Alignment sheet, Isometrics
14. Project - BUDOUR NE Phase 3B Development Facilities FEED/DD, Oman
Project Description: The detailed scope of the pig trap / pipeline replacement project is as follows.
* Install a new 10”, 21 km, and 600# with 3.0mm CA, 95 bars, and CS pipeline from Budour NE to Birba
Gathering Station (BGS).
Responsibility:
* Vendor Drawing Reviews for Long lead items for Pipeline and Stress Analysis

Education

Master's degree, Pipeline Engg
  • at University of Petroleum and Energy Studies
  • April 2008

(

Bachelor's degree, Mechanical Engg
  • at Uttar Pradesh Technical University
  • April 2006

EDUCATION COURSE Board/University Year Class

Specialties & Skills

APPROACH
COMPUTER ASSOCIATES PAQUETES
CUSTOMER RELATIONS
ENGINEERING
GRAPHIC DESIGN
MECHANICAL DESIGN
MEETING FACILITATION
OIL PAINTING

Languages

English
Expert
Hindi
Expert
Urdu
Expert