محمد أنور, Electrical Engineer

محمد أنور

Electrical Engineer

Khatib & Alami

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, B.TECH (ELECTRICAL AND ELECTRONICS ENGINEERING
الخبرات
21 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 7 أشهر

Electrical Engineer في Khatib & Alami
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ أغسطس 2020

1. Organization : Khatib and Alami
Position : Electrical Site Engineer
Duration : September 2020 To Till Date
Project : 1) Al Faisaliah Hotel Refurbishment
2) Darraq Al-Hada Residential Compound


Responsibilities:

• Witnesses the daily inspections to ensure the works is going as per
the approved shop drawings, as per contract and applicable codes,
standards and specifications.
• Reviewing contractor-submitted shop and as-built drawings and
coordinate with the concerned departments for resolving issues and
obtaining their approval and for their comments.
• Inspection of power cables, Transformers, panel boards, Internal and
External and Façade lighting system and their control, fire alarm system,
CCTV system, Emergency power system with generator, Central battery
system, BMS system, MCC system, Access control System, Voice and
Data, Public Addressing and Audio visual system.
• Attending meetings with the contractor and sub-contractors to resolve
Interfacing problems during construction and attending the Work progress
meeting in PMC with Client.
• Inspecting Contractors Electrical Installation and Testing Activities and
providing clearance for approved works.
• Witnesses all testing, pre-commissioning, commissioning, and start-up
activities to assure contractors compliance with the approved plans and
procedures.
• Inspecting incoming material Invoices and Billing invoices for payments for
work progress submitted by contractor

Project Engineer Electrical في Saudi Aramco
  • المملكة العربية السعودية - الخبر
  • سبتمبر 2018 إلى أغسطس 2020

1. Organization : Saudi Aramco
Position : Project Engineer Electrical (SAPMT)
Duration : September 2018 To Till
Project : Marjan & Zuluf increment Projects Dept.
Aramco ID No : 8326615

Responsibilities:

Project development: preliminary engineering to detail designs to construction and the final safe turnover to proponent.

Manage General Engineering Services (GES) design contractor activities during the development of project proposal, include definition of project work scope and schedule requirements. Development of detailed estimate leading to funding appropriation and approval.

• Review the scope of work related to Electrical and Instrument Drawings and other documents as per the Aramco standards at different stages like Design Basis Scoping paper (DBSP) FEL-2, Project Proposal FEL-3, issued for bidding package (IFB) Project, Value engineering, Execution & Control and Project Closure.

• Reviewing contractor drawings and Coordinates with the concerned
departments in Aramco for obtaining their approval and closure of
their comments.
• Visiting the site along pipelines corridor to secure the Interface of Electrical, Instrument and Communication Scope.
• Utilizing the existing system to provide power for the new system or to provide the power with the solar system where there is no source available.
• Handling Issues related to Interface and Technical Query and initiating the CRM’s to get the required information.
• Executing Electrical studies like ETAP study, Cathodic protection system, Solar Vs Utility study
• Attend project weekly and monthly meetings with contractor, PMT Team and other department in Armco e.g progress status, stakeholders, design review, plot plan, value improvement and issues related to the site and drawings, Project work schedule and the drawing control list….etc
• Conducting cost benefit analysis solar Vs utility study in order to check and utilize the best source with less cost which will be profitable for the project
• Review weekly and monthly reports on the status and progress of the contracts, including project costs and potential changes.
• Working on company systems tools like CRM, EPM, E-Review system, Sharek.
• Review the interface management system provided by the contractor which includes interface secured from the different locations on the site
• Manage contractor preparation of detailed design drawings, material specifications and procurement, and/or construction bid packages.
• Review and resolve day to day contractors claims and complaints related to assigned project (Electrical) work during construction, and ensure HSE compliance
• Review, coordinate and monitor invoices (claimed vs. actual physical progress checks) and contractor's submittals.
• Be familiar with leading equipment manufacturers/ Vendors.
• Be familiar with international procedures of Projects Phases, Engineering Phases, Bidding procedure, Procurement Process, Construction Requirements, and up to date Best Practices
• Assist in managing and reviewing the project progress, i.e., planned vs actual. Review of project schedule, coordinating and monitoring the assigned project progress, and challenge below par performance of the contractor.
• Develop and preparation of contracting plan and strategy for solicitation, evaluation, and award of contract for detail engineering, procurement, and construction.
• Managing complete project deliverables from initial stage to closing including review and approval project related activities.

Senior Electrical Engineer في Projacs
  • المملكة العربية السعودية - الخبر
  • يونيو 2013 إلى أغسطس 2018

Project : 1) Al Hayatt Regency Hotel (Swailem Tower)
2) Gwayieyah Mall
3) Badiah masjid, Villa

Responsibilities:

• Witnesses the daily inspections to ensure the works is going as per
the approved shop drawings, as per contract and applicable codes,
standards and specifications.
• Reviewing contractor-submitted shop and as-built drawings, and
coordinates with the concerned departments for resolving issues and
obtaining their approval and for their comments.
• Inspection of power cables, Transformers, panel boards, Internal and
External and Façade lighting system and their control, fire alarm system,
cctv system, Emergency power system with generator, Central battery
system, BMS system, mcc system, Access control System, Voice and Data,
Public Addressing and Audio visual system.
• Attending meetings with the contractor and sub-contractors to resolve
Interfacing problems during construction and attending the Work progress
meeting in PMC with Client.
• Inspecting Contractors Electrical Installation and Testing Activities and
providing clearance for approved works.

• Witnesses all testing, pre-commissioning, commissioning, and start-up
activities to assure contractors compliance with the approved plans and
procedures.
• Inspecting incoming material Invoices and Billing invoices for payments for
work progress submitted by contractor

Electrical Engineer في Pilog Saudi International
  • المملكة العربية السعودية - ينبع
  • أبريل 2011 إلى مايو 2013

Project : Yanbu Aramco Sinopec Refining Company
(YASREF)


Responsibilities:

• Handling Electrical Work With help of Drawings
• Installation of Sub-station, Main distribution panel boards, Sub
distribution Panel boards
• Installing different types of lighting fixture with different switches and
outlets and lighting post on roads.
• Monitoring Telephone and data cable lay out and out-lets for data and
Telephone Units.
• Monitoring the installation of Addressable Fire alarm annunciator
(Repeater) panel with controls Smoke detectors, Heat detectors,
sprinkler head, Beam detectors and HVAC System(Shut down)and
Fire Fighting unit.
• Preparing of work Schedule coordinating with consultants and sub-
contractors
• Preparing of daily and weekly progress report

Electrical Engineer في Fahad A .Alblehed contracting est.
  • المملكة العربية السعودية - الرياض
  • أغسطس 2006 إلى مارس 2011

Project : Fahad villa’s and American compound

TRAINING DETAILS:

Under gone training with Current Technologies International GmbH Based on Powerline communication product in Magenwil, Switzerland.

Responsibilites :

- Installation of the powerline products using conductive and
inductive techniques.
- Installation of Medium and low voltage Head-ends,
gateways in the distribution panel using ferrites for
Signaling.
- Installation of the CPE's in costumer rooms for accessing
the Triple play (Data, voice over IP and Video on Demand).
- Installation of the IP cameras units for monitoring.
- Installation of software for monitoring the Devices as well
as IP cameras.

SITE ELECTRICAL ENGINEER في Abdul aziz Al traiki & partners Trading & contracting Ltd.( A.P.T.C )
  • المملكة العربية السعودية
  • نوفمبر 2005 إلى يوليو 2006

Client : Royal commission for Jubail and Yanbu.
project : operation and maintenance center . contract no . 691-c19.

responsibilites :

- Handling Electrical drawings with reference to shop drawings.
- installation of sub-station, Main distribution panel boards, sub distribution
panel boards .(Range of substation 1000KVA 13.8KV - 400/231v) and
Electrical cable layouts in the site and buildings.
- installing different types of lighting fixture for buildings with different
switches and outlets and lighting post on roads.
- monitoring telephone and data cable lay out in the site and buildings and
out-lets for data and telephone units.
- monitoring the installation of addressable fire alarm annunciator(repeater)
panel with controls smoke detectors, heat detectors, sprinklers head,
beam detectors and HVAC system (shutdown) and fire fighting unit.
- preparing of work schedule coordinating with consultants and sub-
contractors.
- preparing of daily and weekly progress report.

Testing Engineer في Hi-power Electrical Industries
  • الهند
  • أبريل 2004 إلى سبتمبر 2005

Work involved in Testing and QC of various ranges of Distribution transformers.

- Conducting Routine Test for transformers
15KVA, 16KVA, 25KVA, 63KVA, 100KVA
- Performing Calculation on losses involved in
short and open circuit tests
- Detection of breaking point of oil before using
in transformers
- Detection of fault and troubleshooting it
- Heat run test or temperature rise test for
transformer
- Detection of incoming material quality
- Preparing of monthly and weekly work
schedule for success and smooth execution
of job
- Reviewing of weekly/monthly progress reports

Testing Engineer في Transcon Industries
  • الهند
  • سبتمبر 2002 إلى مارس 2004

Work involved in Testing and QC of various ranges of Distribution transformers.

- Conducting Routine Test for transformers
10KVA, 16KVA, 25KVA, 63KVA
- Performing Calculation on losses involved in
short and open circuit tests
- Detection of breaking point of oil before using
in transformers
- Detection of fault and troubleshooting it
- Heat run test or temperature rise test for
transformer
- Detection of incoming material quality
- Preparing of monthly and weekly work
schedule for success and smooth execution
of job
- Reviewing of weekly/monthly progress reports

الخلفية التعليمية

بكالوريوس, B.TECH (ELECTRICAL AND ELECTRONICS ENGINEERING
  • في Kakatiya University
  • مايو 2002

COMPLETED MY B.TECH IN ELECTRICAL AND ELECTRONICS ENGINEERING IN MAY 2002

Specialties & Skills

Testing
Transformer
Progress Reports
Installation
C, Oracle 8i,AutoCAD 200,Ms office 200,SAP -Basis,Abap, MCSE,ComputerHard ware With troubleshooting.

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس
الهندية
متمرّس