Mohammed Hamed, O&M Industrial wastewater Treatment Plant Superintendent

Mohammed Hamed

O&M Industrial wastewater Treatment Plant Superintendent

Marafiq Saur

Location
Saudi Arabia - Jubail
Education
Bachelor's degree, Mechanical Engineer
Experience
19 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 0 Months

O&M Industrial wastewater Treatment Plant Superintendent at Marafiq Saur
  • Saudi Arabia - Jubail
  • My current job since May 2016

• Operation and maintenance for Industrial Treatment plant with Total Capacity 140, 000m3/day.
• Manage a team of 100 engineers and technicians including hiring, evaluating; training and development
• Manage and monitoring the Environmental, Health and Safety of the process areas
• Prepare and control yearly budget for Opex and Capex for more than ‘50MSAR’.
• Involve in reviewing the new Expansion design of additional treatment capacity of 160, 000m3/day ‘800MSAR’.
• Coordinate with all industrial customers (more than 65 large petro-chemical industries) to comply with plant Influent regulations.
• Maintain and comply with the Outfall quality in line with the Royal Commission for Jubail and Yanbu, and the Saudi Environmental Standards.
• O&M for an advanced chemical oxidation treatment system, 'FENTON', which is designed to treat hard COD.

O&M Wastewater Network Superintendent at Marafiq Saur
  • Saudi Arabia - Jubail
  • October 2014 to May 2016

Operate and maintain 1200KM pipe line for Industrial and sanitary wastewater .
Operate and maintain more than 400nos. pump and lift Stations of total Flow capacity for more than 280, 000m3/day.
Prepare and control Yearly Budget for Opex and Capex for more than 35MSAR.

Project Manager at Ghantoot Gulf Contracting Co.
  • United Arab Emirates - Dubai
  • June 2013 to September 2014

Transmission Pipe Line FEWA Project 12W/2011 DN 100013k.m& 19W/2012 DN 600 8k.m:
Procurement, specification, Design routing profile, shop drawings and getting approval from Authorities, Installing of Pipe Rack 6meter Height 500meter length, RTU system, Dewatering system, Deep Excavations Embankment, Chambers as (Flow Meter, Flow Control Valve, Air valve, Wash out and Butterfly valve ), Wrapping System, Pipe Laying, Encasement, Protection slap and Thrust Block, Road Crossing NDRC as (Thrust Boring, HDD and Microtunneling) for Pressure Line DIA 600mm & 1000mm Ductile Iron pipes & restraint pipes, preparation of pressure test and Sterilization).

Senior Project Engineer at Belhasa Project LLC
  • United Arab Emirates - Dubai
  • September 2011 to June 2013

Transmission Pipe Line FEWA Project 08W/2011 DN800 36k.m:
1. Procurement, specification and Installing of Dewatering system, Deep ‎Excavations and Embankment, (Air valve, Wash out, Butterfly valve and Flow ‎Meter Chamber), Wrapping System, Pipe Laying, Encasement, Protection slap ‎and Thrust Block, Road Crossing as HDD, Thrust Boring and Microtunneling for ‎Pressure Line DIA 600mm, 800mm & 1000mm Ductile Iron pipes & restraint ‎pipes, preparation of Pin Hole test and pressure test, pH, chlorine test and ‎Sterilization).‎
2. Plan and schedule the work and efficiently organize the Site/facilities in order to ‎meet the agreed program.‎
3. Attending regular meeting with clients and keeping them informed ‎about progress.‎
4. Preparing routing profile, shop drawings and getting approval from consultant.‎
5. Coordinate with suppliers to adjust the material order.‎
6. Reporting to the Project Manager about all work running on the site.‎
7. Preparing change order/work variation orders for additional works given by the ‎client.‎
8. Maintaining standards of safety and comply with Health, Safety & Environment ‎management system requirement.‎

Senior Project Engineer at JOG Union Engineer
  • United Arab Emirates - Ras Al Khaimah
  • July 2007 to November 2012

1.Procurement, specification, Installing & commissioning of MEP work of Ras Al Khaimah sewerage project Phase #01& #02 (pump and lift stations) Use GRP, D.I, S.S, HDPE & G.I Pipes. Project Value 200, 000, 000.00AED
2.Operate and maintenance of Generator Caterpillars (2M.W) for main pump Station in Ras Al Khaimah.
3.Mechanical installation of Surge Vessel with associated components.
4.Operation and Maintenance of Mechanical Bar Screen for main pump station of Ras Al Khaimah
5.Plumbing works - Installation & commissioning for several Projects including the Ras Al Khaimah Corniche project.
6.Installation of HDPE pipes as part of the infrastructure works for Yasmine Village project.
7.Skilled in using SAP system as project manager, for the issue of internal, external orders & Quotations.
8.Installation of pumping station (capacity 100 kW) for the Ras Al Khaimah sewerage treatment plant.
9.Installation of lifting station for the Saif hospital (RAK) (Capacity 13.5 kW).
10.Procurement, specification and Installing of MEP Pump Stations Al Marjan Island #3 &#4 including (Odour Control Unit, Self Priming Pumps(75K.w &75l/s), Prime Generators Closed Type(400&250KVA), Mono Rail Crane(2Ton), GRP and Carbon Steel Pipes, Control Panel, Instrumentation System, Fire Fighting and Fire Alarm System, Earthing System and Cabling System.
11.Procurement, specification and Installing of Dewatering system, Deep Excavations, Air valve chamber, Wash out Chamber, Gate valve chamber, Pressure Lines, Wrapping tape and Sleeves isolation DIA 600mm, & 800 mm Ductile Iron pipes & restraint pipes, preparation of pressure test pH & chlorine test for Di pipes) for FEWA 8W/2011 water line in UQA city.
12.Attending regular meeting with clients and consultants and keeping them informed about progress.
13.Coordinate with suppliers to adjust the material order.
Reporting to the Project Manager about all work running on the site.
14.Maintaining standards of safety and comply with Health, Safety & Environment management system requirement.

Maintenance Engineering at NEEASAE Company
  • Egypt - Alexandria
  • June 2003 to July 2005

Maintenance Engineer in Glass Factory, Periodic and Preventive Maintenance, Planning and Execution.

Education

Bachelor's degree, Mechanical Engineer
  • at B.Sc. Faculty of Engineering Alexandria University 5 years
  • June 2003

Summer Training in Alexandria Shipyard.

Specialties & Skills

Infrastructure Projects
Pump Stations
Project Engineering
Maintenance Engineering
Computers
SAP System
able to plan and prioritise, work to deadlines and under pressure.
able to solve problems using both logic and creative/innovative approaches.
cost/value-conscious and aware of the necessary social, cultural, environmental, health and safety.
Autocad
primavera
Team Management and Leadership

Languages

English
Expert
Arabic
Native Speaker

Memberships

Engineers Association
  • Member
  • June 2003
Saudi Council of Engineers
  • Professional
  • October 2014
TUV SUD Middle East
  • ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007
  • August 2016

Training and Certifications

Internal Auditor Training (Training)
Training Institute:
TUV SUD Middle East
Date Attended:
August 2016
Duration:
24 hours
Project Managements (Training)
Training Institute:
GLOMACS
Date Attended:
September 2016
Duration:
40 hours
Water & Wastewater Industry (Training)
Training Institute:
Endress+Hauser
Date Attended:
October 2015
Duration:
40 hours
Integrated Management System (IMS) (Training)
Training Institute:
Marafiq Training Center
Date Attended:
November 2014
Duration:
40 hours
Business Management and Public Relations (Training)
Training Institute:
International Computer Center
Date Attended:
November 2003
ICDL (Training)
Training Institute:
Arab Academy for Science, Technology & Maritime Transport
Date Attended:
September 2005
Installing of HDPE pipes (Training)
Training Institute:
Georg Fischer
Date Attended:
August 2009

Hobbies

  • Reading, sports and swimming
    Table tennis with interest the scientific books