Road pavement material testing, Method statement & material submittal reviewing, auditing third party laboratories & suppliers, concrete plants, aggregate stockpiles, aggregate stabilizer plants, conducting plant trial mix of asphalt, concrete, subgrade and aggregate base material, carrying out site inspection & preparing defect root cause analysis.
• Inspections of materials received at site/laydown, stockpile area, stabilizer plants, asphalt plants and ensures that materials to be used and stored shall conform to contract plans and specifications.
• Inspection for receiving of road works related materials and its Handling, Storage and Preservation.
• Supervising and executing projects with emphasis on quality control, engineering, planning, and coordination of interfaces.
• Coordinate with the client representatives to ensure that inspections are carried out expediently.
• Reviewing Method statement, Material Submittals, ITP and Mix Designs related to road pavement works.
• Preparing Materials Frequency Testing Summary and maintaining its log.
• Conducting quality audit inspection for asphalt plants, aggregate stabilizer plants, concrete plants and third party main & site laboratories.
• Sampling & testing of backfill, sub-grade, aggregate base, asphalt, prime coat, tack coat, road marking material.
• Comprising in road works material testing in laboratories and at site.
• Prepare surveillance report/observation note for any discrepancies occurred on site and forwarding it to QA/QC Manager and Construction Team and ensuring for its timely rectification.
• Follow up effective corrective actions on non conformities.
• Prepare and raise Non Conformance Report (NCR) for activities/materials not complying with the standards.
• Understanding and implementation of ISO, ASTM, BS, BS-EN, QCS, ACI, Ashghal Interim Notes.
• Attending pavement quality meetings, preparing weekly and monthly reports, preparing audit reports and its documentation.
• Handling all matters pertaining to Materials submittal, preparation of Request for Inspection (RFI’s) for getting approvals for materials & on site activities, preparing weekly and monthly quality control reports.
• Coordinating with consultants in day-to-day activities.
• Responsible for ensuring full implementation of QA/QC procedure and policy.
• Preparing NCR’s, Punch List (Snag), and M0’s (Reserve List) for work done by sub-contractors.
• Reporting any deficiencies in work to QA/QC Site Manager and following up for the same on completion.
• Maintaining records for RFI (Request for Information) and RFC (Request for Clarification) raised and received from client and forwarding to the QC team.
• Preparing ITP’s required as per the ITP matrix provided by the QA/QC Manager for client approval.
• Provide the field construction organization with the approved Site Quality Plan, Inspection and Test Plan (ITP’s) Method Statement to be implemented on site.
• Prepare surveillance report/observation note for any discrepancies occurred on site and forwarding it to QA/QC Manager and Construction Team and ensuring for its timely rectification.
• Prepare and raise Non Conformance Report (NCR) for activities/materials not complying with the standards.
• Follow up effective corrective actions on non conformities.
• Inspection for receiving of Civil, Architectural finishing and Structural materials and its Handling, Storage and Preservation.
• Coordinate with the client representatives to ensure that inspections are carried out expediently.
• Reviewing, preparing and submitting Method statement, JSA and STA received from construction team for client approval.
• Preparing Materials Receiving Inspection and maintaining its log.
• Raising INR (Inspection Notification Request) for materials received on site and getting approval for the same.
• Co-ordinating with procurement department to ensure that materials used on site are approved from client and having relevant test certificates and M&DS (Material and Data Submittal) as per specifications and standards of the project.
• Review the calibration status of any test equipment being utilized on the project ensuring the equipment is within calibration prior to use.
• Maintaining records for RFI (Request for Information) and RFC (Request for Clarification) raised and received from client and forwarding to the QC team.
• Preparing ITP’s required as per the ITP matrix provided by the QA/QC Manager for client approval.
• Provide the field construction organization with the approved Site Quality Plan, Inspection and Test Plan (ITP’s) Method Statement to be implemented on site.
• Prepare surveillance report/observation note for any discrepancies occurred on site and forwarding it to QA/QC Manager and Construction Team and ensuring for its timely rectification.
• Prepare and raise Non Conformance Report (NCR) for activities/materials not complying with the standards.
• Follow up effective corrective actions on non conformities.
• Understanding and implementation of ASTM, ACI, SAUDI BUILDING CODE.
Work execution of civil & architectural finishing works.
• Handling of civil, architectural finishing works.
• Preparing material purchase order and follow-up of material delivery to site in timely manner.
• Monitoring the collection of material samples and testing on materials
• Laying down work procedures to ensure that quality of construction is maintained at all times.
• Continuous monitoring of all activities and reporting for variances.
• Preparation of Quality Reports and Records - weekly, monthly
• Scheduling concreting for site activities, getting approval and arranging concrete for the same.
• Executed architectural interior works as per the approved drawings.
• Executed fit-out works as per the approved drawings
• Execution of Architectural/civil and structural works like Dry wall partitions, internal finishing’s like gypsum ceilings, bulk heads, grid ceilings, drop heads
• Executed MEP works for the open ceiling system.
The company’s main line of business is Construction of high Rise Residential buildings, Shopping Mall, Office Towers, Metro rail & Infrastructure. This comes under the top 10 contracting company in its region. Company involved in a construction of a 7 storey Shopping Mall approximate area of 1, 12, 000 sq.mtr including 11 multiplex screens and play nation court with a 3000 ton structural steel. BRIGADE GATEWAY project that covers a 40000 acres with 14 blocks of 1800 flats each blocks constructed 18 storey, 32 storey North Star office tower, Brigade school of 3 storey’s, Columbia Asia Hospital Block, G+14 storey Sheraton 7 star International Hotel, 7 storey Multi level car parking and Club with lake.
Duties & Responsibilities
Office / Field work:-
Execution of concrete works, Shuttering works
Execution of structural steel fabrication and erection works.
Execution of all finishing works like block work, plastering, IPS flooring.
Preparing petty contractor’s bill.
Quantity surveying and site surveying.
Preparing Bar Bending Schedules (BBS) and executing and checking reinforcement works.
Checking all site construction activities by referring to approved drawings, specifications and standards.
Diploma In Civil Engineering