Mohammed Ali Rabie, Senior Engineer (Mechanical)

Mohammed Ali Rabie

Senior Engineer (Mechanical)

COMBINED GROUP CONTRACTING CO

Location
Kuwait
Education
Bachelor's degree, Mechanical Engineering
Experience
17 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 6 Months

Senior Engineer (Mechanical) at COMBINED GROUP CONTRACTING CO
  • Kuwait - Al Ahmadi
  • My current job since May 2021

Analyze the project plan, scope baseline, and specifications to determine
the project schedule, including calculating time requirements and
sequencing project elements.
Monitor and maintain the project schedule by closely tracking project
progress, coordinating activities, and proactively resolving any issues or
delays.
Ensure effective coordination between project engineering design and
construction activities, facilitating smooth communication and
collaboration to meet project objectives.
Solve technical problems that arise during the project execution, promptly
addressing technical queries and ensuring timely resolution to minimize
disruptions.
Prepare regular progress reports, including daily, weekly, and monthly
reports, presenting them to the Kuwait Oil Company (KOC) and Project
Manager to keep them informed about project status.
Develop comprehensive method statements, work procedures, and time
schedules for mechanical activities, ensuring compliance with project
requirements and industry standards.
Create and update the Progress Measurement System (PMS), S-Curves,
and Resources Histogram, providing accurate and up-to-date visual
representations of project progress and resource allocation.
Serve as the representative of the company in meetings with KOC, subcontractors,
and other stakeholders, actively participating in discussions
and effectively conveying project updates and requirements.
Lead meetings as necessary and record minutes to document key
decisions, action items, and agreements for future reference and
accountability.
Collaborate with senior engineers and project participants to identify and
implement more efficient project methods, leveraging expertise and
experience to optimize project outcomes and maintain profitability.

Maintenance Engineer at Integral Services Co(ISCO), Kuwait
  • Kuwait - Al Ahmadi
  • October 2017 to April 2021

Conducted comprehensive maintenance activities on equipment and
systems at Kuwait Oil Company's (KOC) West Onshore Oil & Gas Facilities,
ensuring their optimal performance and reliability.
Developed and implemented maintenance plans and strategies to achieve
maximum plant uptime and sustainable production, in compliance with the
Maintenance Reference Plan and industry standards.
Prepared a 5-year plan for upcoming shutdowns, coordinating with various
stakeholders to schedule and execute maintenance activities efficiently.
Led the formulation and execution of mechanical static equipment
maintenance plans, optimizing resource utilization to achieve costeffective
plant availability and reliability.
Oversaw the preparation of shutdown schedules using MS Project,
ensuring accurate resource loading and timely completion of maintenance
activities.
Monitored progress and reported on a daily basis, providing regular
updates to the controlling team, KOC, and the Project Manager.
Prepared comprehensive completion reports upon job finalization.
Prepared Management of Change (MOC) packages, ensuring compliance
with company standards and effectively executing job tasks at the site.
Provided technical expertise to plant personnel, troubleshooting failures,
evaluating equipment durability, and recommending appropriate repairs
and maintenance interventions.
Conducted root cause analysis (RCA) for equipment failures, identifying
underlying issues and implementing corrective measures to prevent
recurrence.

Maintenance Engineer at HOT Engineering & Construction Co, Kuwait
  • Kuwait - Al Ahmadi
  • March 2015 to October 2017

Developed a comprehensive 5-year plan for upcoming shutdowns across
the entire West Kuwait facilities, strategically scheduling maintenance
activities to optimize plant availability and reliability.
Led and drove the formulation and execution of the Mechanical Static
equipment maintenance plan, ensuring effective resource utilization and
cost-effective operations.
Provided direction in the development of the Mechanical Static equipment
maintenance implementation strategy, aiming to maximize plant uptime
and ensure sustainable production while adhering to the Maintenance
Reference Plan.
Prepared detailed PM shutdown schedules using MS Project, considering
resource availability and efficiently managing resource loading for smooth
execution of maintenance activities.
Monitored project progress on a daily basis, tracking milestones and
preparing comprehensive reports to provide timely updates to KOC and
the Project Manager.
Prepared management of change (MOC) packages, finalizing bill of
materials according to company standards, and overseeing the successful
execution of jobs at the site.
Provided technical expertise to plant personnel, offering guidance on
troubleshooting failures, conducting repairs, and assessing equipment
durability and conditions.
Conducted root cause analysis (RCA) to identify the underlying causes of
equipment failures, enabling implementation of corrective measures.
Prepared regular progress reports as required, delivering detailed updates
to the controlling team at KOC and the Project Manager to ensure
effective communication and project management.

Piping Engineer at HOT Engineering & Construction
  • Kuwait
  • August 2014 to March 2015

Wara pressure maintenance project, Kuwait Oil Company(KOC)
Project description:\[Construction of water treatment plant for using in oil industry as the
pressurized treated water is injected into oil wells to increase production\]

Monitored and ensured timely progress in assigned areas and scopes,
taking decisive actions to facilitate the completion of work.
Demonstrated effective leadership by influencing and motivating technical
project services and construction specialists to achieve cost-effective
project outcomes.
Coordinated and oversaw planning, progress measurements, and
monitoring systems and controls for assigned project areas, collaborating
closely with project control engineers from the company and contractor.
Held responsibility for the fabrication of piping spools in workshops,
meticulously detecting shop welds and field welds across various
materials like carbon steel (CS), low-temperature carbon steel (LTCS),
stainless steel, and duplex.
Supervised and strategically planned field activities, including scheduling
and efficient site organization, to meet the required project schedule.
Exhibited expertise in the fabrication and installation of diverse types of
piping supports, ensuring alignment with isometric markings and
adherence to project-specific piping support system specifications.
Executed value engineering sessions effectively, harmonizing with the
design, fabrication, construction, testing, installation, and commissioning
phases.
Provided appropriate and innovative solutions to meet stakeholder
requirements by conducting comprehensive evaluations and analyses of
client needs, executing piping specifications, and recommending suitable
alternatives.
Oversaw the proper erection of pipes, hangers, and supports during field
installations, ensuring strict compliance with industry standards and
project requirements

Piping Engineer at PETROJET, Egypt
  • Egypt
  • July 2007 to August 2014

Monitored and ensured timely progress in assigned areas and scopes,
taking decisive actions to facilitate the completion of work.
Demonstrated effective leadership by influencing and motivating technical
project services and construction specialists to achieve cost-effective
project outcomes.
Coordinated and oversaw planning, progress measurements, and
monitoring systems and controls for assigned project areas, collaborating
closely with project control engineers from the company and contractor.
Held responsibility for the fabrication of piping spools in workshops,
meticulously detecting shop welds and field welds across various
materials like carbon steel (CS), low-temperature carbon steel (LTCS),
stainless steel, and duplex.
Supervised and strategically planned field activities, including scheduling
and efficient site organization, to meet the required project schedule.
Exhibited expertise in the fabrication and installation of diverse types of
piping supports, ensuring alignment with isometric markings and
adherence to project-specific piping support system specifications.
Executed value engineering sessions effectively, harmonizing with the
design, fabrication, construction, testing, installation, and commissioning
phases.
Provided appropriate and innovative solutions to meet stakeholder
requirements by conducting comprehensive evaluations and analyses of
client needs, executing piping specifications, and recommending suitable
alternatives.
Oversaw the proper erection of pipes, hangers, and supports during field
installations, ensuring strict compliance with industry standards and
project requirements

Maintenance Engineer at The Egyptian German Porcelain
  • Egypt - Alexandria
  • November 2006 to July 2007

Working in different types of fluid power
systems (hydraulic applications) specialist in
hydraulic circuits.

Education

Bachelor's degree, Mechanical Engineering
  • at Alexandria University
  • June 2006

Bachelor in Mechanical Engineering , Alexandria university

Bachelor's degree, Mechanical Engineering
  • at Alexandria University
  • January 2006

Graduateproject:ModificationofSolardistiller,Excellent.

Specialties & Skills

CUSTOMER RELATIONS
OIL PAINTING
PROGRESS
SPECIFICATION
PRODUCTION
MATERIALS MANAGEMENT

Languages

Arabic
Expert
English
Expert

Memberships

Egyptian Engineers syndicate
  • Membership
  • July 2006

Training and Certifications

UT, PT, RT, VT,MT (Certificate)
Date Attended:
August 2009

Hobbies

  • sport practicing, swimming, reading