MOSTAKBAL CITY SUB-STATION 220/22 KV:
✔ Manage on-site activities day to day to ensure all work is being completed according to schedule, budget and the required quality.
✔ Revising the BOQ, Technical and Commercial offers for the materials before P.O.
✔ Co-ordinate with the different departments to minimize time and cost wasting.
✔ Monitor and Control the change in Time, Cost and Resources to achieve the optimum performance according to the strategic plan.
✔ Installation of GIS (HYUNDAI ELECTRIC).
✔ Installation of Power Transformers 220/22kv (GETRA) 150MVA.
✔ Installation of Medium Voltage Switch Gear (Schneider) 94 Cell.
✔ Installation of Outdoor Equipment (CT, SA, DS, ES).
✔ Installation of Capacitor Bank (TEBCO).
✔ Installation of Control, Protection, Metering, Telecommunication and SAS Panels.
✔ Installation of Auxiliary Transformers (ABB).
✔ Installation of Chargers and Batteries (Filling - Testing) for 220 VDC - 48 VDC Systems.
✔ Implementation of Earthing and Lightning systems.
✔ Design, Install, Testing and Commissioning of AC and DC (Main and Sub-Panels).
✔ Design and Implementation of Raceways for the entire S/S.
✔ Preparing accurate Cable routing for MV, LV, Control and F.O Cables.
✔ Supervision on MV, LV, Control and F.O Cables laying and termination.
✔ Design, Implement, Commissioning of Lighting, Power, Fire Alarm and Telephone systems for the entire S/S.
✔ Supervision on MV, LV, Control and F.O Cables laying and termination.
UPTOWN Cairo Sub-Station 220/22 KV:
✔ Installation of GIS(HYUNDAI ELECTRIC).
✔ Installation of Power Transformers 220/22kv(ELSWEEDY) 175MVA.
✔ Design Fire alarm system.
Beni-Suef Combined Cycle Power Plant (4800 MW):
✔Develop and manage all project based paperwork including and not limited to; RFI’s, IR's, RFP's, MIR's...etc.
✔Installation of Power Transformer (Siemens),
✔Installation of Outdoor Equipment (CT, SA, CCVT)
✔Installation of Raceways, Cable laying and termination of HRSG.
✔Install, Testing and commissioning of Fire Alarm, Telephone, Paging and Data system of power plant,
✔MEP Work in various buildings in BOP.
✔Prepare requisitions and specifications for equipment and construction contracts, analyze proposals, produce cost and schedule estimates, and assist in the planning of projects.
✔Develop engineering solutions associated with initial development and budgeting of projects.
✔Overseeing the installation of (Panels, Cable trays, Conduits, Cables laying - pulling, Cable Termination)
✔Testing and Commissioning of L.V Switchgear - Cooling Units
✔Shop drawing - As built drawing using AutoCad
✔Installation - Startup of UPS in different sizes (800 KW - 500 KW - 250 KW ...etc.)
✔Dealing with Data Centers and Critical loads.
✔Maintenance for Schneider Electric equipment on many sites (CFC, Ministery Of Communication and Information Technology, IKEA, Credit Agricole Bank, Arab African International Bank, HC Securities & Investment and Ericsson).