Mechanical MEP Engineer (CATAGORY-A )
ELECTRA ENGINEERING MEP CONSULTANT ,Electro Mechanical Consultant
Total years of experience :17 years, 5 Months
Registered with The Council for Regulating the practice of Engineering Professions, (CATEGORY-B) Kingdom of Bahrain.
EPP/BN/140/ME/02-A
Fire Fighting System, Plumbing, HVAC
High Rise building consisting o and 27Floors.
It consists of HVAC system i.e. ducted split in apartments, VRF system for lift lobby area, smoke ventilillation system for car park at Level-1, 2, &3. Centralized Toilet and Kitchen Exhaust system. Staircase pressurization system, Sprinkler and hydrant system and water supply and drainage system.
High Rise building consisting of 4 Basements and 45 floors.
It consist of Four Mechanical floors at Basement-02, Level-13, Level-30 & Level-47.Total number of chilled water pumps-10, Plate Heat exchanger 12, Pressurization unit -03, Air separator-03, Fan coil Unit-590, Air handling Unit-172, Fire Pump-04, Jokey Pump-02.
High Rise building consisting of Basements and 40 floors.
It consist of Four Mechanical floors at Basement. Total number of chilled water pumps-06, Plate Heat exchanger 06, Pressurization unit -02, Air separator-02, Fan coil Unit-350, Air handling Unit-70, Fire Pump-04, Jokey Pump-02