Mudassir Kamal, Mechanical Supervisor

Mudassir Kamal

Mechanical Supervisor

Sinopec

Location
Saudi Arabia
Education
High school or equivalent, Bachelors In Mechanical Engineering
Experience
8 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :8 years, 1 Months

Mechanical Supervisor at Sinopec
  • Saudi Arabia - Jubail
  • July 2020 to November 2020

Joined the project as a Mechanical Supervisor for the GAS project and coordinated with the subcontractors regarding the progress, engineering issues, material follow-up and site activities.
✔ Responsibilities included(but not limited to) arrangement of daily work permits, material coordination with subcontractors, training workers whenever required, construction follow-up, preparation of look ahead schedule for the subcontractor and conducting meetings with subcontractor and client regarding progress and prioritizing work front.

Mechanical Engineer at SEPCO III
  • Saudi Arabia - Yanbu
  • May 2017 to March 2020

Responsible for overall construction and monitoring of the Fuel oil System for a 2750 MW Power plant being constructed in the Yanbu Power Plant Phase III project.

Mechanical Field Engineer at Hyundai Heavy Industries
  • Saudi Arabia - Jeddah
  • November 2015 to February 2017

Construction follow-up, co-ordination with supervisors, optimizing progress, Organize meetings with Construction & Site Managers regarding the progress
In Site, revision of drawings as per site conditions, co-ordination with planning
Department and strict follow through of HSE code.
Assisted the QC dept. with inspection of piping & equipment, final documentation, and client walk through.
Assisted the testing department with the proper setup, manifold testing,
Calibration of pressure Gauges, preparation of pressure test diagrams,
Preparation of blind control sheet & witness pressure test.

Mechanical Construction Engineer at Bonatti S.P.A
  • Saudi Arabia - Jubail
  • September 2014 to October 2015

1) Line Check
2) Drawing Revision
3) Site Supervision
4) Punch Listing
5) Punch Killing
6) Man-power handling
7) Construction Follow-up
8) Equipment Installation Follow-up
9) Fabrication Follow-up
10) Painting Follow-up
11) Insulation Follow-up
12) Assistance In Test Package Preparation
13) Hydro-test Follow-up
14) Assistance in Pre-commissioning Activities
15) Assistance in Commissioning Activities
16) Part Of the Final Handover to the client team.

Piping/construction Engineer at bonatti S.P.A
  • Saudi Arabia - Yanbu
  • May 2012 to July 2014

1. Construction Follow-up
2. Test Package follow-up
3. Line Check
4. Punch Listing & Punch Killing.
5. Hydro Test follow-up
6. Commissioning Support.
7. System Punch, QVD Punch, Vendor Punch & Critical Punch Closures.

Details Of Work As A Piping Engineer:
 Inspect piping just before erection to verify that interior is clear of foreign materials.

 Check edge preparation and fit-ups to verify that areas to be welded are free of contaminants and that fit-up within tolerance.

 Conducting pre-test line check of erected line spools as per the test pack and preparing punch list.

 Checking actual test limits for the installation of blinds and test pressure on the approved test packages.

 Check flow direction arrows on valves; verify that the properly identified valves are installed in accordance with the flow diagram.

 Ensure that pipe supports hangers and guides have been installed in accordance with the piping drawings and the pipe support details.

 Check and assure that all joints are exposed for examination during pressure test. Check vents are open when filling and draining lines.
 Fabrication of Piping Spools and Structure Supports
 Piping Modification works
 Changing Gasket Nuts and Bolts
 Blinding and Refitting of existing Pipe Lines
 Inspecting the painting works done by the contractors on the fabricated pipe spools. Make sure the Pipe spools are properly covered with the end caps and safely transported to the site without any damages.
 Monitoring and inspecting the erection works by the contractors including piping, welding and insulation and also co-ordination with contractors for the quality issues and issuing NCR’s when non-conformity activities were noted by the contractors.
 Dimensional Checking on Piping and Structure Fabrication Fit Up Tolerance based on Designed Drawing & Isometric .
 Preparation of the overall MTO as per the drawings and the B.O.M(bills of materials) received.
 Preparation of the P.O's required to procure and submit to the procurement department for further processing.
 Co-ordination with the vendor to estimate the expected time of delivery of materials.
 Co-ordination with the planning department to prepare look ahead schedule which involved submission of reports such as material receiving , prefabrication, erection and painting.
 Prefabrication included issuing the material to the fabrication shop and maintaining strict documentation in case of future reference.
 Calculation of the total dia-inch of the project and keeping record of the daily dia-inch progress and submitting the information to the client.
 Follow-up of dia-inch progress in the site.
 Follow-up of painting progress in the paint shop.
 Receiving drawings from the client and follow-up on the total drawings received.
 Preparing the weld map for isometric drawings.
 Revision of drawing as per site conditions.
 Preparation and revision of test package for process piping.
 Make P.O for new materials required due to revision of drawings.
 Preparation of the list of excess quantity of materials to be returned to the client.
 Attend meetings with the project management team regarding the completion of the project and plan of action.

Education

High school or equivalent, Bachelors In Mechanical Engineering
  • at International Indian School Jeddah
  • March 2012
Bachelor's degree, Mechanical Engineering
  • at Osmania University
  • March 2012

I am holding a Bachelor’s Degree in Mechanical Engineering and I have gained comprehensive experience of more than 4 years in the Field of Design, Construction, Pre commissioning and commissioning of Petrochemical plants and, Oil & gas. Some of the Key talents that I can bring to your company include: Professionally Able to develop ideas into workable plans, Able to foster a stimulating learning environment, Excellent motivational and organizational skills, Dedicated to creating an atmosphere of respect and acceptance, Able to handle large scale Design & Construction projects with confidence and maturity, Excellent problem-solving skills, Significant strengths in team-building to achieve Design & Construction in accordance with HSE requirements, and Quality management. In addition to the above skills, I can also offer your firm my passion for the Oil & Petrochemical industry, the motivation to succeed, strong interpersonal and a particular talent for forward planning to develop effective and cost efficient solutions. Key Skills: • Clarity of understanding user requirements. • Excellent Project Execution Skill from Construction to CSU. • Sound logical, Technical and analytical skills. • Good communication and excellent presentation. • Application of knowledge based on past experience. • Good planning and coordination. • Effective operational and maintenance skills. • Leadership, motivation and development. • Job scheduling and monitoring. • Interdisciplinary work handling. • Well organized, energetic, hardworking and fast learner • Excellent Root causes Analysis and Troubleshooting Skill.

Bayt Tests

English for Business Skills Test
Score 68%

Specialties & Skills

Solidworks
Microsoft Excel
Report Writing
Quality Control
construction
Site Supervision
Piping Fabrication and Erection
hydrotesting

Languages

English
Expert
Arabic
Intermediate
Hindi
Expert
Urdu
Expert

Training and Certifications

NDT level 2 (Training)
Training Institute:
M.S welding institute
Date Attended:
January 2012
Duration:
30 hours
Diploma In QA/QC piping (Training)
Training Institute:
M.S Welding institute
Date Attended:
January 2012
Duration:
52 hours