Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
muhammad ali bilal, quantity surveyor

muhammad ali bilal

quantity surveyor·Saipem - Saudi Arabia

Pakistan

Bachelor's degree, Mechanical

Work experience

Total years of experience: 15 years, 8 months

quantity surveyor

March 2023 - February 2026

Saipem - Saudi Arabia

Dammam, Saudi Arabia

March 2023 - February 2026

Jafurah wellhead pipeline project Saudi Arabia

Company industry:
Oil & Gas
Job role:
Oil and Gas

quantity surveyor

January 2019 - December 2022

Saipem - Saudi Arabia

Al-Ahsa, Saudi Arabia

January 2019 - December 2022

SGCP Harad pipeline project

Company industry:
Oil & Gas
Job role:
Mechanical Engineering

quantity surveyor

January 2018 - December 2018

Saipem - Saudi Arabia

Jizan, Saudi Arabia

January 2018 - December 2018

JAZAN Refinery project 2018

Company industry:
Oil & Gas
Job role:
Oil and Gas

Mechanical Engineer

March 2016 - December 2017

TUV AUS - PAK

Tando Adam, Pakistan

March 2016 - December 2017

MECHANICAL INSPECTOR
NAIMAT GAS FIELD TANDO ADAM PAKISTAN

Company industry:
Mechanical Engineering
Job role:
Engineering

supervisor mechanical

October 2015 - February 2016

al.barrak saudi

Jubail, Saudi Arabia

October 2015 - February 2016

Company industry:
Installation & Technical Services
Job role:
Engineering

asstt engineer

May 2014 - May 2015

descon

Doha, Qatar

May 2014 - May 2015

shutdowns QP Q.CHEM and SHELL

Company industry:
Construction & Building
Job role:
Engineering

asstt engineer

February 2014 - May 2014

QCON

Doha, Qatar

February 2014 - May 2014

shutdown QAFAC.

Company industry:
Mechanical Engineering
Job role:
Engineering

Mechanical Asst. Engineer

January 2012 - March 2014

DESCON, Abu Dhabi.-Habshan project

Abu Dhabi, United Arab Emirates

January 2012 - March 2014

Employer: DESCON, Abu Dhabi.-Habshan project
Designation Mechanical Asst. Engineer
Duration 22/01/2012 to till date
TAKREER Ruwais Refinery Division Shutdown.

Company industry:
Oil & Gas
Job role:
Other

Mechanical Asst. Engineer

January 2012 - April 2012

DESCON, Abu Dhabi.-Shutdown project

January 2012 - April 2012

Employer: DESCON, Abu Dhabi.-Shutdown project
Designation Mechanical Asst. Engineer
Duration 26-01-2012 to 21-04-2012

Job role:
Other

Mechanical Supervisor

December 2010 - January 2011

DESCON, Shutdown project

December 2010 - January 2011

(in Gulf & Pakistan)
INTIGRATED GAS DEVELOPMENT PROJECT (HABSHAN-5)
Employer: DESCON, Abu Dhabi.-Habshan project

Job role:
Mechanical Engineering

Mechanical Asst. Engineer

March 2008 - April 2009

DESCON, Kohat

Peshawar, Pakistan

March 2008 - April 2009

Designation Mechanical Asst. Engineer
Duration 22/01/2012 to till date

TAKREER Ruwais Refinery Division Shutdown.
Employer: DESCON, Abu Dhabi.-Shutdown project
Designation Mechanical Asst. Engineer
Duration 26-01-2012 to 21-04-2012


WORKING EXPERIENCE; (Pakistan)
PAK-AMERCAN FERTILIZER (Sikandrabad Mianwali) PAKISTAN.

Employer: DESCON, Shutdown project
Designation Mechanical Supervisor
Duration 05-12-2010 26-01-2011

STUDY TRAINING
Manzlai Gas Project Kohat Pakistan.
Employer: DESCON, Kohat
Designation: Material Coordinator

Company industry:
Construction & Building
Job role:
Engineering

Asst. Supervisor

January 2008 - November 2008

ENGINEERING KINETICS Ltd

Pakistan

January 2008 - November 2008

PAKISTAN PETROLIUM LIMITED SHUTDOWN (DOLTALA) RAWALPINDI

Employer: ENGINEERING KINETICS Ltd.
Designation: Asst. Supervisor.
Duration: 2-7 2008 11-7 2008
ATTOCK OIL FIELD (RAWALPINDI) Pakistan.

Job role:
Engineering

Mechanical Supervisor

July 2007 - February 2008

ENGINEERING KINETICS Ltd

Rawalpindi, Pakistan

July 2007 - February 2008

Employer: ENGINEERING KINETICS Ltd
Designation Mechanical Supervisor
Duration July 2007 to May 2008


Heat Exchanger
➢ Shutdown preparation
➢ Isolate the valves
➢ Blinding as per the blind list
➢ Remove the channel cover / channel head
➢ Remove floating head unit
➢ Remove the tube bundle (if necessary)
➢ Shell internal cleaning using power tools
➢ Inspection of shell side
➢ Hydro jetting of tube bundle & inspection
➢ Tube bundle fix back after inspection
➢ Fix test ring for shell side hydro test
➢ Re install floating head after cleaning & inspection
➢ Hydro testing of shell side
➢ Channel cover fix back after cleaning & inspection
➢ Hydro testing of tube side, floating head unit
➢ Remove the spool for Hydro testing, (if necessary)
➢ Final Inspection & box up
➢ De-blinding


Fin fan (Air cooler)
➢ Shutdown preparation
➢ Isolate the valves
➢ Blinding as per the blind list
➢ Remove the tubes plug (both side)
➢ Pre inspection by Qc department
➢ Tray fixing for hydro jetting (both side)
➢ Hydro jetting all tubes
➢ Air blowing
➢ Re-tubing, tube bundle replacement ( if necessary)
➢ Inspection after air blowing
➢ IRIS (internal rotary inspection system) test ( if necessary)
➢ All plugs are re-install
➢ Hydro testing of tube bundle & final inspection
➢ Box up
➢ De-blinding.

Tank & vessels
➢ Drain the oil from oil tank using vacuum trucks, then water flushing, air flushing using BA (Breathing apparatus)
➢ Nitrogen (N2) purging, gas testing
➢ Internal cleaning using hand/power tools
➢ Internal welding, grinding
➢ Report to QC for Internal inspection
➢ After inspection close the man way
➢ Shell cleaning using internal buffing
➢ Open the Man Way for internal cleaning & inspection of vessel
➢ Remove the Demister & fix back after cleaning
➢ Inspection & box up

Piping
➢ Receiving Plant drawings, Isometric drawings from Engineer for the pipeline installation work.
➢ Checking of dimensional measurements in the place where piping has to be erected/fabricated as per the Isometric drawings

➢ With the help of Fabricators and Fitters cut the required length of the pipe, make beveling and give fit up.

➢ Fit-up reports submitted to QC for Inspection.

➢ Install pipe fitments drawing and Observe Valve, Strainer orientation according to the Isometric and check for the Horizontal and Vertical rolling.


➢ After welding and inspection of NDT Hydro testing of the lines will be carried out.

➢ Done blinding in required places, remove control valves, check valves and replace with spools. Select gauge meter according to the pressure range. Open the Vent and start water filling from the drain side with the help of manifold.

➢ Further carryout and hold as per the QC instructions.

➢ Involved in steam piping (alloy steel) connecting to steam turbine, drain lines, lube oil lines (SS), condensate line & cooling water with supports to adjust its expansions.
➢ Fabrication & erection of gas plant pipe line as per site condition.
➢ Installation of Pipe spools in the running plant with safety and quality.
➢ Hydro testing of pipes & commissioning
➢ Installation of different types of Valves
➢ Erection of Pipe supports
➢ Pre-commissioning and Commissioning
➢ Controlling of Manpower
➢ Erection of Pipes in existing units with all safety measures.
➢ Planning for necessary Tools and Equipments
➢ Fabrication, testing, erection and commissioning of underground piping
➢ Plan and carry out tie in joints during unit and Refinery Shut downs.
➢ Fabrication, testing, erection and commissioning of process and utility piping in the running plant
➢ Check the site condition before fabrication & erection.
➢ Attending all punch list points until handover to client
➢ Conversant with checking of Fit ups, welding,
➢ Fully conversant with the preparation of BOM from Isometric, Plant and P&ID Drawings
Valves

➢ Pullout pressure relief valve, pressure safety valve & Reinstall after calibration
➢ Remove pressure control valve, Non-Return valve
➢ Blindin

Company industry:
General Engineering Consultancy
Job role:
Mechanical Engineering

INTIGRATED GAS DEVELOPMENT PROJECT (HABSHAN-5

-

DESCON, Abu Dhabi.-Habshan project

-

INTIGRATED GAS DEVELOPMENT PROJECT (HABSHAN-5)

Job role:
Other

Education

B.Tech mechanical

October 2010

October 2010

Bachelor's degree, Mechanical

Pakistan

GPA (point): 3.4 out of 4

GPA (point): 3.4 out of 4

• B. Tech (Pass) Mechanical (From PIMSAT Lahore) (2008 to 2010) • DAE Mechanical GPI Layyah (Punjab Board of Technical Education)
View attachment

pimsat lahore

September 2010

September 2010

Bachelor's degree, b.tech mechanical

Pakistan

GPA (point): 3.3 out of 4

GPA (point): 3.3 out of 4

bachelor of technology consist of industrial management.

pimsat lahore

March 2009

March 2009

Bachelor's degree, mechanical

Pakistan

GPA (point): 3.3 out of 4

GPA (point): 3.3 out of 4

B.TECH mech

Skills

QC
Expert
QC
Expert
Installation
Expert
Installation
Expert
Inspection
Expert
Inspection
Expert
Gas
Expert
Gas
Expert
Hydro
Expert
Hydro
Expert
DRAWING
Expert
DRAWING
Expert
ENGINEER
Expert
ENGINEER
Expert
FABRICATION
Expert
FABRICATION
Expert
FINAL INSPECTION
Expert
FINAL INSPECTION
Expert
GAS PLANT
Expert
GAS PLANT
Expert
REFINERY
Expert
REFINERY
Expert
QC
Expert
QC
Expert
Installation
Expert
Installation
Expert
Inspection
Expert
Inspection
Expert
Gas
Expert
Gas
Expert
Hydro
Expert
Hydro
Expert

Languages

Urdu

Native Speaker

English

Expert

Training and Certifications

Certifications
3 YEAR DIPLOMA IN ASSOCIAT ENGINEERING

Training
PTW Permit to Work
Takreer Refinery UAE
Jan 2012

Hobbies and interests

Book reading , Tourism & travelling

None