Total Years of Experience: 38 Years, 3 Months
January 2018
To Present
Senior Mechanical Engineer
I found this job using Bayt.com
at 6x211MW GE 7FA.05
Location :
Saudi Arabia - Riyadh
January 2018 on ward I have been employed by UNISIS under the recommendation of Saudi Electric Company PP14 Project Manager as technical Support Engineer and applying for SEC Commodity Codes for project delivered spare parts, purchase of new parts for preservation and maintenance of Both PP13-PP14 Riyadh Combined Cycle Power Plants. Had to specify the specification to help purchase department who procure the parts for smooth operation of power plants.
August 2016
To February 2018
Senior Engineer
I found this job using Bayt.com
at Worley Parsons
Location :
Saudi Arabia - Riyadh
I have been working with WorleyParsons from September 2016 to March 2017 and then shifted to Saudi Electricity Company and till date working as Senior Engineer Mechanical. Main job had been construction supervision of Gas & Steam turbines at PP13 Riyadh and then shifted to Describe the Parts Specifications as per requirement of SEC Struxure to allocate SEC Codes and purchase the spare parts for 2x1800 MWCCPP of GE FRAME 7FA.05 gas turbine and D211steam turbines. Before I had worked as construction supervisor for 59 cubic meter per hour Water Treatment Plant at PP13. Also was partially responsible to prepare a work sheet for Mechanical Completion and system readiness for commissioning.
January 2010
To June 2016
Generation Engineer Awal
I found this job using Bayt.com
at Saudi Electricity Company
Location :
Saudi Arabia - Riyadh
Generation Engineer Awal under Technical Support Division,
responsible for
Unit Maintenance and Material Planning
For 56 GE Frame 7EA and 4 STAG407EA units at Riyadh Power Plant #9 with
a capacity of 4200MW combined cycle, operating on Natural gas and crude oil. I
was responsible for procurement and inspection of all Mechanical Parts for units
as well as HRSG S and rest of BOP including Water Treatment, Fuel Oil
Treatment and Gas Conditioning Station.
Additionaly
1) I had to review the specification, Constructions Plans submitted
by Maintenance Engineers for new system /equipment modification for efficiency
enhancement.
2) I was also involved in reviewing the contract agreements for maintenance and
modification works to be carried at Power Plant#9.
responsible for
Unit Maintenance and Material Planning
For 56 GE Frame 7EA and 4 STAG407EA units at Riyadh Power Plant #9 with
a capacity of 4200MW combined cycle, operating on Natural gas and crude oil. I
was responsible for procurement and inspection of all Mechanical Parts for units
as well as HRSG S and rest of BOP including Water Treatment, Fuel Oil
Treatment and Gas Conditioning Station.
Additionaly
1) I had to review the specification, Constructions Plans submitted
by Maintenance Engineers for new system /equipment modification for efficiency
enhancement.
2) I was also involved in reviewing the contract agreements for maintenance and
modification works to be carried at Power Plant#9.
September 2003
To February 2007
Generation Engineer A
at O&MDivision SEC- CRB
Location :
Saudi Arabia - Riyadh
Worked as Unit Maintenanace Planning for all Centrally Operated Area(COA).
Responsible for WEEKLY OUTAGE PROGRAMME, Emergency Unit Shut Down and Maintenance cost Follow-up from all the CRB STATIONS like PP-4, PP5, PP7, PP8, PP9, QASSIME, HAIL Liala &Juba Power Palnts.Meanwhile i participated in the re-organization of SEC Oragnizal Structure.
Responsible for WEEKLY OUTAGE PROGRAMME, Emergency Unit Shut Down and Maintenance cost Follow-up from all the CRB STATIONS like PP-4, PP5, PP7, PP8, PP9, QASSIME, HAIL Liala &Juba Power Palnts.Meanwhile i participated in the re-organization of SEC Oragnizal Structure.
August 1999
To September 2003
Senior Engineer
I found this job using Bayt.com
at POWER PLANT #9 Centrally operated Area Riyadh.
Location :
Saudi Arabia - Riyadh
Representative, for remaining Blocks B-1, B-2 of 1200MW Combined Cycle
Power Plant STAG407EA GE Units Under SEC
Power Plant STAG407EA GE Units Under SEC
January 1997
To August 1999
Project Mechanical Engineer
at SAUD CONSULT Riyadh
Location :
Saudi Arabia - Riyadh
Responsible for erection supervision, of Steam Turbines, Gas turbines
Water Treatment Plant, Balance of Plant, Above Ground Piping, Compressed Air System (Station
Service & Instrument) & Commissioning and Testing of all RPP9 1200 MW Combined Cycle Systems
, as an employee of Electrowatt International /Saud Consult on behalf of client SEC .
Water Treatment Plant, Balance of Plant, Above Ground Piping, Compressed Air System (Station
Service & Instrument) & Commissioning and Testing of all RPP9 1200 MW Combined Cycle Systems
, as an employee of Electrowatt International /Saud Consult on behalf of client SEC .
November 1993
To December 1995
Project Engineer
at Cycle 4XAEG FRAME5 WAPDA
Location :
Pakistan
Responsible for over all administration, Technical Supervision and
Commissioning of Combined Cycle on 4X25 MWAEG gas turbines.
Commissioning of Combined Cycle on 4X25 MWAEG gas turbines.
November 1988
To November 1991
Senior Engineer
at Maintenance132MW Steam Power Station WAPDA
Location :
Pakistan
Responsible for mechanical maintenance of 2X66 MW Westinghouse Steam
Turbine, Foster Wheeler Boiler, De-mineralized Water Treatment Plant,
Cooling Towers & BOP.
Turbine, Foster Wheeler Boiler, De-mineralized Water Treatment Plant,
Cooling Towers & BOP.
March 1987
To October 1988
Senior Engineer
at 132MW Steam Power Station WAPDA
Location :
Pakistan
Responsible for Shift Operation of 2X66 MW Westinghouse, Foster Wheeler Boiler
& all BOP.
& all BOP.
September 1985
To March 1987
Assistant Mechanical Engineer
at WAPDA 200 MW Gas Turbine Power Plant
Location :
Pakistan - Faisalabad
Responsible for Mechanical Maintenance of 8X25 AEG Gas Turbines including
alignment, parts replacement Combustion Inspection, Hot Gas Path Inspection
& Major Over Hauling.
alignment, parts replacement Combustion Inspection, Hot Gas Path Inspection
& Major Over Hauling.
January 1984
To August 1985
Student of Master of Engineering
at Persuaded MASTER OF ENGINEERING in ENERGY TECHNOLOGY atASIAN INSTITUTE of TECHNOLOGY
Location :
Thailand
Persuaded Master of Engineering in Energy Technology at Asian Institue of Technology Bangkok Thailand.
June 1983
To January 1984
Assistant Director
at Thermal Generation Training Perianghaib
Location :
Pakistan
February 1982
To June 1983
Shift Engineer
at 4X65MW Natural gas Perianghaib Power StationWAPDA
Location :
Pakistan - Multan
Responsible to opearte and shutdown the steam turbine, boiler or Generator Safely as per manufacturers O&M Manual.
February 1980
To February 1982
Junior Engineer
at 3374 MW Hydro-Electric Power Station TARBELA
Location :
Pakistan
at that time Tarbela Power Station was under construction and only first 8
units were in operation)
units were in operation)
Engineer
Location :
United Arab Emirates
SEC-COA: Contract Performance, Construction Follow-up and Project
Monitoring for Block -C, D&F Phase II Extension Consisting of 32XMS7001EA GE Machines with
TIAC & Weekly/Yearly Unit Maintenance Planning and material (all mechanical parts) at POWER
PLANT #
Monitoring for Block -C, D&F Phase II Extension Consisting of 32XMS7001EA GE Machines with
TIAC & Weekly/Yearly Unit Maintenance Planning and material (all mechanical parts) at POWER
PLANT #
Share on Facebook